- PUE
- Power Usage Effectiveness equals total facility power divided by IT equipment power. A value of 1.0 is theoretical; lower is better and it is the most cited efficiency metric.
- Tier IV topology
- Uptime Institute classification requiring fault tolerance and continuous cooling, with all electrical and cooling paths independently maintainable without shutting down the IT load.
- 2N redundancy
- A design in which two complete, independent capacity systems are installed, each able to carry the full load alone. Failure of either system leaves full capacity available.
- N+1 redundancy
- One additional component beyond the number needed to carry the load. If one unit fails, remaining units still support full IT demand, but maintenance may reduce margin.
- Hot-aisle containment
- Physical enclosure of the hot aisle so exhaust air returns directly to cooling units. It prevents hot exhaust from mixing with cold supply air and improves cooling efficiency.
- ASHRAE TC 9.9 envelope
- Recommended and allowable temperature and humidity ranges for IT equipment classes A1 to A4. It guides cooling setpoints and economizer use in data centre design.
- Single-line diagram
- A schematic showing electrical distribution from utility through transformers, UPS, switchgear and PDUs. It identifies transfer points and single points of failure in the design.
- Clean-agent suppression
- Fire suppression using gases such as FM-200 or Novec 1230 that extinguish fire without water damage. Design must consider occupied-space safety and cylinder room sizing.
- Method of Procedure
- A step-by-step document for a specific, often non-routine task, listing prerequisites, sequence, verification steps, rollback and responsible persons before execution.
- Standard Operating Procedure
- A documented routine for recurring operational tasks such as rounds, filter changes or tape handling. It ensures consistent execution and supports audit and training.
- Emergency Operating Procedure
- A predefined response script for failures such as UPS transfer or cooling loss, specifying immediate actions, escalation and communication to reduce recovery time.
- MTTR
- Mean Time To Repair is total repair time divided by the number of repairs. It measures maintainability and directly affects availability when combined with MTBF.
- MTBF
- Mean Time Between Failures is total operating time divided by the number of failures. It estimates reliability and feeds availability calculations for critical systems.
- Change management
- A controlled process requiring risk assessment, approval, scheduling, rollback plan and post-implementation review for any change to production infrastructure or configuration.
- Load bank test
- A test applying an artificial electrical load to a generator or UPS to verify capacity, fuel system and cooling under realistic conditions without relying on IT load.
- Two-person rule
- A control requiring two authorised persons to be present for critical switching or access, reducing error and fraud risk in high-consequence operations.
- Capacity threshold trigger
- A predefined utilisation level, often 80 percent, at which power, cooling, space or network capacity requires action such as expansion or load rebalancing.
- ISO/IEC 22237
- An international series covering data centre facilities and infrastructure, including general concepts, building construction, power, cooling, ICT, security and management.
- ISO/IEC 27001
- The international standard for information security management systems. Annex A includes physical and environmental security controls relevant to data centre operations.
- EN 50600
- The European standard for data centre facilities and infrastructure, defining availability and protection classes. It aligns closely with the ISO/IEC 22237 series.
- TIA-942
- A telecommunications infrastructure standard for data centres specifying cabling, topology and Rated-1 to Rated-4 availability levels for design and build.
- Uptime Institute Tier
- A commercial certification of data centre topology and operational sustainability. It is not a national or international standard and differs from ISO certification.
- PCI DSS physical controls
- Requirements for cardholder data environments including badge access, visitor logs, CCTV retention and annual review of physical security controls.
- SOC 2 Type II
- An independent attestation report covering a period and testing operating effectiveness of controls, unlike Type I which assesses design at a point in time.
- NFPA 75
- A US fire code standard for fire protection of information technology equipment and information technology spaces, covering detection, suppression and construction.
- DCiE
- Data Centre Infrastructure Efficiency is the reciprocal of PUE, expressed as a percentage. Higher is better and it represents IT share of total facility energy.
- WUE
- Water Usage Effectiveness equals annual water consumption in litres divided by IT energy in kWh. It quantifies cooling water intensity for sustainability reporting.
- CUE
- Carbon Usage Effectiveness equals total carbon dioxide emissions divided by IT energy in kWh. It combines energy efficiency with the carbon intensity of supply.
- RTO
- Recovery Time Objective is the maximum acceptable time to restore a service after disruption. It drives redundancy, failover design and staffing levels.
- RPO
- Recovery Point Objective is the maximum acceptable data loss measured in time. It determines replication frequency and backup strategy for critical workloads.
- Availability formula
- Availability equals MTBF divided by MTBF plus MTTR. Annual downtime minutes equal one minus availability, multiplied by 525,600 minutes per year.
- Colocation contract terms
- Key clauses cover power density per rack, cross-connect fees, SLA credits, maintenance windows, escalation paths, renewal pricing and exit or migration assistance.