EXIN CDCE study materials
EXIN CDCE study resources

EXIN CDCE study plan

EXIN CDCE · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Data centre design

  • Map the four exam domains to your current knowledge and record a baseline confidence score (1-5) for each of the 25% weightings

  • Define the data centre design vocabulary you must command: availability, redundancy, concurrent maintainability, fault tolerance, and Tier/Class distinctions

  • Sketch the standard functional areas of a data centre (white space, grey space, entrance room, telecom room, electrical room, UPS room, generator yard) from memory and label the boundaries between them

  • Explain to a colleague, in under five minutes, why N+1 and 2N differ in both cost and maintainability outcome

Your checkpoint

A one-page hand-drawn floor plan of a generic data centre with all functional areas labelled and a written definition for each of the five design terms

Week 2

Data centre design

  • Compare four topologies (single path, N+1, 2N, 2(N+1)) on component count, single points of failure, and concurrent maintainability

  • Calculate the electrical capacity chain from utility feed through transformer, UPS, PDU, and rack, identifying where derating factors apply

  • Size a cooling approach for a given room by matching kW of IT load to air-cooled, chilled-water, or in-row options

  • Identify the fire detection and suppression choices appropriate to an occupied white space and justify each

  • Draw the power and cooling paths for one topology and mark every point where a single failure would take down the IT load

Your checkpoint

A comparison table of the four topologies with single points of failure counted per topology and a one-paragraph recommendation for a 500 kW facility

Week 3

Data centre design & Data centre operations and maintenance

  • Convert the week 2 design into an operational commissioning checklist covering electrical, mechanical, and security systems

  • Sequence the handover activities from construction completion through integrated systems testing to operational acceptance

  • List the routine maintenance tasks for UPS batteries, generators, chillers, and CRAC/CRAH units with typical intervals

  • Draft a change management procedure for a live white space that protects availability during maintenance windows

Your checkpoint

A commissioning and handover checklist with at least 20 line items grouped by system, each with an owner role and an acceptance criterion

Week 4

Data centre operations and maintenance

  • Build a monitoring dashboard specification listing the metrics that matter: temperature at rack inlet, humidity, power load per phase, PUE, and UPS battery health

  • Define incident severity levels and the escalation path from a first alert to facilities and IT stakeholders

  • Write the procedure for a planned generator load test and the rollback steps if the test fails

  • Explain how capacity records (space, power, cooling, network ports) are kept current and who owns each record

Your checkpoint

A monitoring and incident-response runbook covering at least eight metrics, three severity levels, and one full worked incident scenario

Week 5

Data centre standards and compliance

  • Distinguish the roles of standards bodies and frameworks relevant to data centres (ISO/IEC, TIA, Uptime Institute, EN 50600, BICSI) without conflating certification with design guidance

  • Map each compliance requirement you have studied to the design or operational control that satisfies it

  • Interpret an SLA and an availability target, and state how measurement windows and exclusions change the reported figure

  • Identify the audit evidence a data centre would need to produce for power, environmental, and access control records

Your checkpoint

A compliance cross-reference matrix with at least 15 rows linking requirement, source standard, implementing control, and evidence produced

Week 6

Data centre standards and compliance & Data centre management and strategy

  • Draft a risk register for a mid-size facility with likelihood, impact, owner, and mitigation for each entry

  • Compare build, lease, and colocation options on total cost of ownership, control, and time to market

  • Construct a simple business case for a resilience upgrade that quantifies downtime cost against capital spend

  • Explain how sustainability reporting (PUE, WUE, renewable sourcing) feeds into management decisions

Your checkpoint

A risk register of at least 12 entries plus a two-page business case for one resilience or efficiency investment

Week 7

Data centre management and strategy

  • Draft a staffing model for 24x7 coverage that accounts for shift patterns, on-call rotation, and required competencies

  • Design a training and competence-assessment plan for facilities technicians and shift leads

  • Define vendor management controls: SLA review cadence, performance scorecards, and escalation triggers

  • Prepare a one-page executive summary of a data centre strategy that a non-technical board member could act on

Your checkpoint

A staffing and competence plan with a shift roster template and a skills matrix covering at least six roles

Week 8

Data centre design & Data centre operations and maintenance & Data centre standards and compliance & Data centre management and strategy

  • Re-score your confidence per domain and target the two weakest areas with focused review

  • Answer timed practice questions across all four domains and log every miss by domain and root cause

  • Re-derive the four topologies and the compliance cross-reference from memory without notes

  • Write a personal exam-day plan covering time allocation per domain and a strategy for ambiguous scenario questions

Your checkpoint

A scored practice test log with error analysis by domain, plus a written exam-day time-allocation plan

Milestones

Week 2: You can draw four redundancy topologies from memory, count single points of failure in each, and justify a topology choice for a stated load and budget

Week 4: You can walk through a full incident from alert to closure using your own runbook, naming the owner and action at each step

Week 6: You can map any compliance requirement you have studied to a concrete control and the evidence it produces, and defend one investment in business terms

Week 8: Practice scores are at or above 80% in every domain, and no domain remains below your week 1 baseline confidence