Concurrently maintainable
A Tier III characteristic: any piece of equipment can be removed from service for planned maintenance without affecting the IT load, because an alternative distribution path exists.
Fault tolerant
A Tier IV characteristic: the facility has multiple independent, simultaneously active capacity and distribution paths, so a single failure of any component does not affect the IT load.
2N redundancy
Two complete, independent capacity systems each able to carry the full load. A failure or maintenance in one system leaves the other serving the entire IT load.
N+1 redundancy
One additional module beyond the number needed to carry the load. If N modules are required, N+1 provides one spare that covers a single module failure or maintenance event.
ANSI/TIA-942
A telecommunications infrastructure standard for data centres covering site, architectural, electrical, mechanical and cabling requirements, with rated levels from I to IV.
EN 50600 series
European standard series for data centre facilities and infrastructures, defining availability classes, physical security, energy efficiency and related design and operation requirements.
Basis of design
The design document stating IT load, rack density, redundancy level, growth allowance, environmental targets and applicable standards that all later design decisions must satisfy.
Hot and cold aisle layout
Rack arrangement where equipment intakes face a common cold aisle and exhausts face a common hot aisle, preventing supply air from mixing with return air before cooling.
Three-phase power formula
Real power in watts equals √3 multiplied by line-to-line voltage, line current and power factor. Apparent power in VA omits the power factor term.
Power factor conversion
Apparent power in kVA equals real power in kW divided by power factor. A 900 kW load at 0.9 power factor requires 1,000 kVA of capacity.
PUE definition
Power usage effectiveness equals total facility energy divided by IT equipment energy. A value of 1.0 is ideal; 1.5 means half a unit of overhead per unit of IT energy.
UPS battery autonomy
The runtime a battery string provides at a given load. Runtime falls roughly with load increase, and faster than linearly at high discharge rates.
Static transfer switch
A device that switches a load between two independent power sources in milliseconds, used to feed rack PDUs from A and B feeds without a break.
Generator block loading
The stepwise application of load to a generator set. Large single steps can exceed the alternator's capability and cause voltage and frequency excursions.
TN-S earthing system
An earthing arrangement where protective earth and neutral are separate conductors throughout the installation, reducing stray currents and noise on the earthing system.
A and B rack feeds
Two independent power supplies to dual-corded IT equipment, each sized to carry the full rack load, so loss of one feed leaves equipment running.
Sensible heat airflow formula
Cooling power in kW equals airflow in m3/s times air density 1.2 kg/m3 times specific heat 1.005 kJ/kgK times the supply-to-return temperature difference in kelvin.
Airflow per kW rule
Roughly 1.7 to 2.0 cubic metres per minute of supply air is needed per kW of IT load at a 10 to 12 kelvin temperature difference.
ASHRAE recommended envelope
The intake air range recommended for reliable IT operation, broadly 18 to 27 degrees Celsius with humidity limits that prevent electrostatic discharge and condensation.
Hot aisle containment
Physical enclosure of the hot aisle so exhaust air returns directly to cooling units, preventing hot air from recirculating into equipment intakes.
Cold aisle containment
Enclosure of the cold aisle with doors and roof panels so supply air reaches equipment intakes without escaping or mixing with hot exhaust air.
Refrigeration ton
A cooling capacity unit equal to 3.517 kW of heat removal. Chiller plant efficiency is often expressed as kW per ton of cooling delivered.
Coefficient of performance
Cooling output in kW divided by electrical input in kW. A COP of 4 means four units of cooling are produced per unit of electrical energy consumed.
Free cooling hours
The annual hours when outdoor conditions allow cooling without mechanical refrigeration, determined by local climate and the chosen supply air or water temperature.
Method of procedure
A controlled document giving step-by-step instructions for a specific task, with prerequisites, approvals, verification steps and a rollback plan if the task fails.
Standard operating procedure
A documented routine process describing how recurring operational tasks are performed consistently, including roles, steps and acceptance criteria.
Emergency operating procedure
A pre-written response plan for defined failures such as power loss, cooling failure or fire, specifying immediate actions, escalation and recovery steps.
Incident versus problem
An incident is an unplanned interruption or service degradation. A problem is the underlying cause, addressed through root-cause analysis to prevent recurrence.
Integrated systems test
A commissioning test that runs the whole facility together, including full-load operation and simulated failures, to prove systems interact correctly before handover.
Mean time to repair
The average time needed to restore a failed component or system to service, a key input to availability calculations and spares strategy.
Mean time between failures
The average operating time between failures of a repairable system. Combined with repair time, it determines the availability of that system.
Capacity threshold alert
A configured warning level on power, cooling, space or network utilisation that triggers action before a hard limit is reached, preserving headroom for growth.