CDCP study materials
CDCP study resources

CDCP study plan

CDCP · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Data Centre Design and Standards

  • Map the four exam domains against your current knowledge and write a one-page gap list ranked by weakness.

  • Define the standard bodies and document families that govern data centre design (availability tier frameworks, ANSI/TIA-942, ISO/IEC 22237, EN 50600, Uptime Institute concepts) without attributing any of them as exam publisher material.

  • Distinguish the four commonly cited availability tiers by redundancy topology and the maintenance windows each permits, and sketch each as a single-line block diagram.

  • Convert a stated availability target (for example 99.982% vs 99.995%) into permitted annual downtime minutes and state which tier class supports it.

Your checkpoint

A one-page tier comparison table listing redundancy configuration, concurrent-maintainability status, fault tolerance, and annual downtime budget for each tier.

Week 2

Data Centre Design and Standards

  • Compute floor loading, ceiling height, and aisle width constraints for a sample white space and flag which values breach common design guidance.

  • Lay out a hot-aisle/cold-aisle containment scheme on a 20-rack grid and annotate where fire suppression, egress, and clearance rules conflict with the containment geometry.

  • Compare raised-floor versus slab design on cooling delivery, cable management, load rating, and retrofit cost, and pick one for a stated greenfield scenario with justification.

  • Identify the physical security and fire-detection design requirements that must be decided at design stage rather than retrofitted.

Your checkpoint

A one-page annotated rack layout for a 20-rack room showing aisles, containment, egress paths, and the three design-guidance values you checked against.

Week 3

Data Centre Power Infrastructure

  • Trace power from utility service through transformer, switchgear, UPS, PDU, and rack PDU, and label every conversion point and single point of failure on the diagram.

  • Compare UPS topologies (double-conversion, line-interactive, delta-conversion, rotary) on efficiency, transfer behaviour, and load protection, and select one for a stated load profile.

  • Size a UPS and battery string for a given critical load and autonomy target, showing the derating and efficiency assumptions used.

  • Distinguish ATS, STS, and static switch functions and explain where each belongs in a two-path distribution scheme.

Your checkpoint

A single-line power diagram from utility to rack PDU with every single point of failure marked and the UPS topology choice justified in three sentences.

Week 4

Data Centre Power Infrastructure

  • Calculate power usage effectiveness from given IT load and total facility load figures, then identify which loads you would attack first to improve it.

  • Compare generator, flywheel, and battery energy storage for ride-through and long-duration backup, including fuel storage, testing obligations, and start-time assumptions.

  • Explain earthing, bonding, and neutral handling for a dual-path supply and state why a shared neutral undermines concurrent maintainability.

  • Interpret a branch-circuit monitoring report and identify overloaded circuits, phase imbalance, and stranded capacity.

Your checkpoint

A worked power budget for a 500 kW IT load covering UPS sizing, generator rating, fuel autonomy, and a calculated PUE with assumptions stated.

Week 5

Data Centre Cooling and Environmental Control

  • Convert a given IT load into required cooling capacity and airflow, showing the unit conversions used.

  • Compare air-cooled, chilled-water, and liquid-cooling approaches on density ceiling, efficiency, and retrofit difficulty, and match each to a stated rack density band.

  • Explain psychrometrics well enough to read a chart: dry-bulb, wet-bulb, dew point, relative humidity, and why the allowable envelope is bounded at both ends.

  • Diagnose three common airflow faults (bypass, recirculation, stratification) from described symptoms and prescribe the containment or blanking fix for each.

Your checkpoint

A cooling capacity and airflow calculation sheet for a 300 kW hall plus a one-page psychrometric envelope summary with the ASHRAE-recommended range marked.

Week 6

Data Centre Cooling and Environmental Control

  • Design a CRAC/CRAH and chiller configuration that stays maintainable at full IT load, and prove the N+1 or 2N claim with a failure walkthrough.

  • Explain economiser modes (air-side and water-side) and the climate conditions under which each is viable.

  • Describe free-cooling limits, humidity control conflicts, and condensate management in a low-humidity or high-altitude site.

  • List the cooling telemetry points you would trend and the alarm thresholds that indicate impending loss of cooling.

Your checkpoint

A cooling failure-mode walkthrough for an N+1 system showing, step by step, that IT inlet temperature stays within envelope during any single unit failure and its maintenance window.

Week 7

Data Centre Operations and Maintenance

  • Build a preventive maintenance calendar covering UPS battery testing, generator load banking, switchgear servicing, and cooling maintenance, and state the interval basis for each.

  • Write a method-of-procedure outline for a risk-prone task (for example UPS bypass transfer) with prerequisites, rollback, and verification steps.

  • Define the change-management and MOP/SOP/EOP document hierarchy and state who authorises each level.

  • Explain how concurrent maintainability is proven in practice through planned maintenance without dropping load.

Your checkpoint

One complete MOP for a defined task, including prerequisites, step sequence, rollback plan, acceptance criteria, and named authorisation roles.

Week 8

Data Centre Design and Standards & Data Centre Power Infrastructure & Data Centre Cooling and Environmental Control & Data Centre Operations and Maintenance

  • Run two timed mixed-domain practice sets and log every miss by domain and by cause (knowledge gap, misread, calculation error).

  • Re-derive from memory the tier downtime table, PUE formula, cooling capacity conversion, and UPS sizing method, and correct any drift.

  • Rehearse the five weakest topics from your week 1 gap list and confirm each now answers correctly under time pressure.

  • Assemble a one-page exam-day reference of formulas, unit conversions, and document definitions that you can reconstruct without notes.

Your checkpoint

A scored two-set practice log with error-cause tally and a one-page formula sheet reconstructed from memory and verified against your notes.

Milestones

Week 2: You can state each availability tier's redundancy and downtime budget from memory and defend a rack layout against three named design constraints.

Week 4: You can draw the full power path from utility to rack PDU unaided, mark every single point of failure, and calculate PUE and UPS runtime for a new load figure.

Week 6: You can size cooling for an arbitrary IT load, read a psychrometric chart, and prove N+1 cooling survives any single failure without exceeding inlet temperature limits.

Week 8: Two timed mixed-domain sets scored with every error categorised, and the formula sheet reproduced from memory with no uncorrected gaps.