EPI Data Centre Foundation flashcards
EPI Data Centre Foundation · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Concurrently maintainable
- A Tier III characteristic: any piece of power or cooling equipment on one distribution path can be removed for maintenance while the IT load continues to be served from the other path.
- Fault tolerant topology
- A Tier IV design in which a failure of any single component or distribution path does not interrupt the IT load, because independent compartments each carry full capacity.
- 2N redundancy
- Two complete independent systems, each sized to carry the full critical load, so one system can fail or be maintained without affecting the IT equipment.
- PUE formula
- Power Usage Effectiveness equals total facility energy divided by IT equipment energy over the same period. A value of 1.0 is theoretical perfection; lower values indicate better efficiency.
- Hot and cold aisle
- A layout where equipment fronts face each other in cold aisles fed by cool supply air, and rears face each other in hot aisles returning warm air to the cooling units.
- Heat load conversion
- One kilowatt of electrical IT load converts to approximately 3,412 BTU per hour of heat, which cooling capacity must remove to keep temperatures stable.
- UPS sizing rule
- UPS capacity in kVA equals critical load in kW divided by the load power factor, then multiplied by a design margin and redundancy factor.
- Cable pathway diversity
- Redundant network links must traverse physically separate routes, because two cables in the same tray or duct share the same single point of failure.
- Method of Procedure
- A task-specific document listing exact steps, prerequisites, safety controls, rollback actions and verification checks for a planned activity on critical infrastructure.
- Standard Operating Procedure
- A documented, pre-approved sequence for routine recurring operations, such as generator checks or tape rotation, that does not need case-by-case engineering review.
- Emergency Operating Procedure
- A pre-written response guide for unplanned events, such as UPS failure or cooling loss, defining immediate actions, escalation contacts and load-shedding priorities.
- Change management trigger
- Any work that can affect a live critical path or a documented configuration requires a change record, risk assessment and approval before execution.
- Load bank test
- A test applying controlled resistive or resistive-reactive load to a generator or UPS to prove it can carry rated capacity, not merely start and run unloaded.
- Shift handover record
- A documented transfer of responsibility covering open work orders, abnormal conditions, active permits, bypassed alarms and outstanding risks between operational shifts.
- Capacity threshold flag
- A predefined utilisation level for power, cooling, space or ports that triggers review before the resource becomes a hard constraint on new deployments.
- Incident severity
- A classification based primarily on customer impact and loss of redundancy, used to drive escalation speed and communication, rather than on alarm count.
- ISO/IEC 27001
- The international standard for an Information Security Management System, requiring risk assessment, documented controls, internal audit and management review for certification.
- ISO/IEC 22237 series
- An international standard covering data centre facility design, operation and protection, structured around availability, security and energy efficiency classifications.
- TIA-942
- A telecommunications infrastructure standard for data centres that defines cabling, topology and Rated-1 to Rated-4 availability levels for facility infrastructure.
- Nonconformity
- An audit finding where a documented requirement, such as a standard clause or internal policy, is demonstrably not met, requiring corrective action and follow-up verification.
- Audit evidence quality
- Evidence strength ranks system-generated records and logs highest, reviewed documents and screenshots next, and verbal statements lowest, because statements are not verifiable.
- Segregation of duties
- A control ensuring the person who performs a change is not also the sole approver or sole verifier, reducing error and fraud risk.
- Document control
- A process giving each procedure a version, owner, approval date and review cycle, and withdrawing superseded copies so only current documents are used.
- Physical access audit
- Reconciling access logs against current authorisation lists, checking visitor escort records, CCTV retention and door alarm tests to confirm physical security controls operate.
- Risk treatment options
- The four responses to an identified risk: avoid the activity, reduce likelihood or impact, transfer it via insurance or contract, or accept it with documented owner approval.
- Risk register fields
- Minimum content for each entry: description, owner, likelihood, impact, rating, treatment plan, target date and residual rating after treatment.
- RTO and RPO
- Recovery Time Objective is the maximum acceptable outage duration; Recovery Point Objective is the maximum acceptable data loss measured in time.
- RACI matrix
- A responsibility model assigning each activity as Responsible (does the work), Accountable (owns the outcome), Consulted (gives input) or Informed (kept updated).
- Key risk indicator
- A metric tracking exposure to future adverse events, such as count of overdue critical maintenance or open high-severity audit findings, rather than past performance.
- Vendor right-to-audit
- A contract clause allowing the client to inspect a supplier's controls and records, supporting assurance over outsourced data centre or maintenance services.
- Competence record
- Evidence that a person is capable for a task, combining training, formal assessment and supervised practice, rather than attendance certificates alone.