EXIN Procesmanagement Specialist flashcards
EXIN Procesmanagement Specialist · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Process
- A repeatable set of related activities that converts defined inputs into outputs of value for a customer, with a defined start, end, owner, and measurable performance.
- Process owner
- The person accountable for a process's design, performance targets, and cross-functional improvement, with a mandate to change the process even without hierarchical control over all staff.
- Primary process
- A value-creating process that directly delivers the product or service to the external customer and forms the core of the organization's value chain.
- Supporting process
- A process that supplies resources, information, or capabilities the primary processes need, without directly delivering value to the external customer.
- Management process
- A steering process that sets direction, policy, strategy, and control for the organization and its primary and supporting processes.
- Process hierarchy
- The layered breakdown from main process to sub-process to activity to task, where each lower level is more detailed and more narrowly scoped than the one above.
- Procedure
- A documented description of how activities in a process must be carried out, including sequence, responsibilities, and conditions, at a level above the work instruction.
- Effectiveness
- The degree to which a process output meets the customer's requirement; it answers whether the right result was produced, independent of the resources used.
- Efficiency
- The ratio of resources consumed to output realized, expressing how economically a process converts inputs into results relative to a norm or target.
- Lead-through time
- The total elapsed time from the start of a process to its end, comprising net processing time plus waiting, transport, and inspection time.
- Value-added ratio
- Net processing time divided by total lead-through time, showing what fraction of elapsed time actually adds value for the customer.
- PDCA cycle
- The Deming improvement cycle: Plan a target and method, Do it on a small scale, Check results against the target, Act by standardizing or adjusting.
- Process maturity
- A staged measure of how repeatable, defined, measured, and continuously improved an organization's processes are, from ad hoc execution to managed optimization.
- As-is process map
- A model of the current process flow as it actually operates, including handoffs, exceptions, and delays, used as the baseline before redesign.
- To-be process design
- The redesigned future-state process flow, specified after waste analysis and validated by pilot before organization-wide implementation and standardization.
- Eight wastes
- Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and unused Skills; non-value-adding elements to eliminate in process redesign.
- Little's Law
- Average work-in-progress equals arrival rate multiplied by average lead-through time; at constant arrival rate, cutting WIP cuts lead-through time proportionally.
- Bottleneck
- The process step whose capacity is lowest and therefore determines the throughput of the whole process; only improving it raises overall output.
- Theory of Constraints
- A five-step improvement sequence: identify the constraint, exploit it, subordinate other steps to it, elevate it, then repeat once the constraint moves.
- KPI
- A key performance indicator: a specific, measurable metric with a named owner, a target value, and a fixed review frequency tied to process performance.
- Lagging indicator
- A performance measure that reports outcomes after they have occurred, such as customer satisfaction or cost per order, and cannot steer the process in real time.
- Leading indicator
- A process measure that predicts later outcomes and can be acted on during execution, such as first-time-right rate or backlog age.
- Process audit
- A review that tests both compliance, whether the process is executed as documented, and effectiveness, whether the documented process delivers its target results.
- RACI matrix
- A role assignment grid: Responsible performs the work, Accountable answers for the result, Consulted gives input beforehand, Informed is notified afterwards.
- Process standardization
- Fixing the best-known method as the single agreed way of working, so that variation and its causes become visible and improvements can be locked in.
- Continuous improvement
- An ongoing cycle of small, structured improvements executed by the people doing the work, supported by measurement and standardized methods rather than one-off projects.
- Process performance measurement
- The systematic collection of data on time, cost, quality, and customer satisfaction per process, compared against targets set by the process owner.
- Change resistance
- Opposition to a process change arising from unclear urgency, perceived loss of autonomy or expertise, or fear of job impact, reduced by early participation.
- Management sponsorship
- Visible commitment from senior management that provides mandate, resources, and priority for a process change and signals its importance to the organization.
- Process implementation
- The phase in which the designed process is piloted, roles and systems are aligned, staff are trained, and the new way of working is embedded and measured.
- First-time-right
- The percentage of process instances completed correctly without rework or correction, a leading quality indicator of process execution capability.
- Process scope
- The explicit boundary of a process, naming its trigger, end result, included activities, and interfaces to adjacent processes, preventing overlap and gaps.
- Customer of the process
- The internal or external party that receives and uses the process output; their requirement defines effectiveness and anchors the process goal.