FAA Parachute Rigger study materials
FAA Parachute Rigger study resources

FAA Parachute Rigger cheat sheet

FAA Parachute Rigger · Keep the key ideas within reach.

Quick reference

Regulations and Recordkeeping

  • FAA parachute rigger certification is issued under 14 CFR Part 65, Subpart F; a senior rigger may pack, maintain, and repair specific items, while a master rigger may additionally construct and alter approved designs.

  • Under Part 65, a certificated rigger must keep a record of each parachute packed that includes the date, the rigger's name and certificate number, and the type and model of parachute.

  • A rigger certificate is valid for 24 months; within the preceding 24 months the holder must have packed or maintained at least one parachute to remain current for the certificate.

  • Part 65 requires the rigger to present the certificate and logbook for inspection upon reasonable request by the FAA, NTSB, or authorized law enforcement.

  • An FAA Form 8610-1 is used to apply for a rigger certificate; a mechanic certificate holder applying for a rigger rating must show the practical experience requirements.

  • The senior rigger practical experience minimum is 12 months of experience and packing of at least 20 parachutes; the master rigger minimum is 24 months and 40 parachutes, per Part 65.

  • A rigger must not pack or maintain a parachute for use in operations requiring an airworthiness certificate unless the parachute is approved under the applicable technical standard order or type certificate.

  • Records of parachute packing and maintenance must be retained and made available; the rigger's logbook is the primary evidence of currency and experience.

Quick reference

Parachute Materials, Components, and Hardware

  • Nylon (Nylon 6.6) is the standard canopy and container fabric; its strength, elasticity, and resistance to mildew and abrasion make it the default material for main canopies.

  • Ripstop nylon uses a grid of heavier threads to arrest tear propagation; a small nick in a ripstop panel will not run beyond the reinforcing grid.

  • Kevlar and Vectran lines have high strength-to-weight ratios but low elongation; Spectra/Dyneema lines are also low-stretch and must be inspected for creep and wear.

  • Tubular nylon webbing is specified by MIL-W-4088 and is used for harnesses and risers; its strength is rated in pounds and must be matched to the design load.

  • A three-ring release system consists of a small ring, a medium ring, and a large ring; the small ring is attached to the riser and the large ring to the harness.

  • The reserve parachute static line and the ripcord system must use approved components; the ripcord cable housing must be free of kinks and the cable must move freely.

  • Hardware such as connector links (maillons) must be rated for the parachute's design load; quick-release connectors must be inspected for proper closure and locking.

  • The canopy's suspension lines attach to the riser via connector links; line trim and line length are critical to canopy performance and must match the manufacturer's specifications.

Quick reference

Fabrication, Sewing, and Construction Techniques

  • A lock stitch is the standard stitch for parachute construction; it must be locked at both ends and the thread tension must be adjusted so the stitch does not pucker the fabric.

  • Stitch density for parachute seams is typically 7 to 9 stitches per inch; the seam allowance and thread type must follow the manufacturer's or MIL-spec drawing.

  • A French seam or a folded seam is used to enclose raw fabric edges and prevent raveling; the seam must be sewn with the specified thread and stitch pattern.

  • Bar tacking is used at stress points such as line attachment points and riser junctions to reinforce the fabric and distribute load.

  • Thread must be compatible with the fabric; nylon thread is used for nylon fabric, and the thread size must match the seam specification, typically size E or FF.

  • When sewing, the needle must be the correct size and type for the fabric; a dull or wrong needle can cut fibers and reduce seam strength.

  • The sewing machine must be tested on a sample of the same fabric and thread before sewing the parachute; the test seam must be inspected for stitch quality.

  • Construction of a parachute from an approved design requires a master rigger certificate; the rigger must follow the approved drawing and use approved materials.

Quick reference

Inspection, Packing, and Maintenance of Parachutes

  • A 100-hour or annual inspection of a parachute is not an FAA requirement for all parachutes; the manufacturer's maintenance schedule and the operator's inspection program govern.

  • Before packing, the rigger must inspect the canopy for holes, tears, and seam damage; the lines for broken or worn threads; and the hardware for cracks or corrosion.

  • The packing procedure must follow the manufacturer's instructions; the canopy must be folded and the lines stowed so the deployment sequence is correct.

  • The reserve parachute must be packed by a certificated rigger within the preceding 180 days for use in operations requiring an airworthiness certificate; the date is recorded on the packing data card.

  • The packing data card must be attached to the parachute and must show the date of packing, the rigger's name and certificate number, and the parachute type and model.

  • A parachute that has been exposed to water, chemicals, or excessive heat must be inspected and may require repacking or replacement of components.

  • The AAD (automatic activation device) must be inspected and its maintenance schedule followed; the AAD is not a substitute for a properly packed reserve.

  • After packing, the rigger must perform a final inspection of the container closure, the ripcord routing, and the reserve handle to ensure proper function.

Quick reference

Rigging, Assembly, and Installation

  • The harness must be adjusted to the wearer; the leg straps, chest strap, and shoulder straps must be snug and the hardware must be properly routed.

  • The reserve static line (RSL) must be connected to the harness and the reserve ripcord; the RSL must be routed so it does not interfere with the main deployment.

  • The three-ring release must be assembled in the correct order: the small ring through the medium ring, the medium ring through the large ring, and the cable through the small ring loop.

  • The risers must be attached to the harness with the correct connector links; the links must be tightened and the excess thread trimmed and stowed.

  • The main canopy must be assembled to the risers with the lines in the correct order; a line that is crossed or misrouted will cause a malfunction.

  • The container must be assembled with the correct size and type of canopy; a container that is too small or too large will affect deployment.

  • The AAD must be installed per the manufacturer's instructions; the cutter must be positioned correctly and the activation altitude set for the intended use.

  • After assembly, the rigger must perform a continuity check and a function check of the release system and the reserve ripcord.

Quick reference

Maintenance, Repair, and Alteration

  • A senior rigger may perform minor repairs such as patching small holes and replacing line attachments; major repairs and alterations require a master rigger.

  • A patch must be made with the same or approved material and must overlap the damaged area by at least the amount specified by the manufacturer.

  • A line replacement must use the same type and strength of line; the line length must be measured and matched to the opposite line to maintain trim.

  • An alteration to a parachute must be approved by the manufacturer or the FAA; an unapproved alteration may render the parachute unairworthy.

  • A repair to a load-bearing component must restore the original strength; a repair that does not meet the design strength is not acceptable.

  • After any repair, the rigger must inspect the repair and record it in the parachute logbook with the date, description, and rigger's certificate number.

  • The parachute must be repacked after a repair that disturbs the packing; the packing data card must be updated.

  • A parachute that has been involved in an accident or a malfunction must be inspected and may require a complete teardown and inspection before return to service.

Quick reference

Emergency and Safety Procedures

  • A total malfunction (no canopy) requires immediate reserve deployment; the reserve ripcord must be pulled firmly and the canopy checked after deployment.

  • A partial malfunction such as a line-over or a step-through requires the jumper to cut away the main and deploy the reserve; the decision altitude must be briefed before the jump.

  • The reserve parachute must be packed within 180 days and the AAD must be armed; a reserve that is out of date is not airworthy for operations requiring an airworthiness certificate.

  • The cutaway procedure: pull the cutaway handle, then pull the reserve ripcord; the reserve must be deployed before the decision altitude.

  • An AAD activates the reserve at a preset altitude and descent rate; it is a backup and not a substitute for the jumper's emergency procedures.

  • The rigger must ensure the reserve ripcord is routed and the handle is accessible; a misrouted ripcord can prevent reserve deployment.

  • Emergency procedures must be practiced; the rigger should verify the harness and container allow the jumper to reach the cutaway and reserve handles.

  • After an emergency deployment, the parachute must be inspected and repacked by a certificated rigger before reuse.

Quick reference

Weight, Balance, and Performance

  • The total weight of the jumper and equipment must not exceed the maximum suspended weight of the parachute system; exceeding it reduces performance and may be unsafe.

  • Wing loading is the total suspended weight divided by the canopy area; a higher wing loading increases descent rate and forward speed.

  • The canopy's descent rate and forward speed depend on wing loading, canopy design, and the density altitude; higher density altitude reduces performance.

  • The parachute system's maximum weight is specified by the manufacturer; the rigger must verify the jumper and equipment weight is within limits.

  • The container and harness must be sized for the jumper; a poor fit can affect the center of gravity and the deployment sequence.

  • The reserve canopy must be sized for the jumper's weight; an undersized reserve increases the descent rate in an emergency.

  • Weight and balance of the jumper and equipment affect the parachute's opening characteristics and the landing pattern; the rigger should consider the total suspended weight.

  • Performance calculations must account for the density altitude, which is a function of pressure altitude and temperature; high density altitude reduces canopy performance.