FAA Parachute Rigger study materials
FAA Parachute Rigger study resources

FAA Parachute Rigger study plan

FAA Parachute Rigger · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Regulations and Recordkeeping & Parachute Materials, Components, and Hardware

  • Map every FAA regulation and advisory circular cited in the rigger handbooks to the specific recordkeeping duty it creates (packing record, repack cycle, logbook entry, seal, signature).

  • Build a one-page reference table of repack intervals and record retention rules for emergency, reserve, and chest-style parachutes.

  • Label a component identification set from memory: canopy types, suspension line types, connector links, risers, harness webbing, and pilot chute hardware.

  • Trace a sample packing record from seal number through rigger certificate to aircraft logbook entry and identify three common rejection points a certificated parachute rigger would flag.

Your checkpoint

A two-page quick-reference sheet covering repack intervals, required record fields, and a 25-item component identification list with zero lookups on a self-quiz.

Week 2

Parachute Materials, Components, and Hardware & Fabrication, Sewing, and Construction Techniques

  • Compare material specifications for nylon, polyester, and aramid fabrics and state the failure mode each resists in a parachute application.

  • Identify thread type, stitch type, and stitch density requirements for canopy seams, harness stitching, and container attachment points.

  • Practice or observe five core sewing operations: straight seam, bar tack, box-X, zigzag, and tacking, and record the machine settings used for each.

  • Explain how load path continuity is maintained across a seam, a connector link, and a riser junction.

Your checkpoint

A material and stitch specification sheet listing at least 10 materials with their use, strength class, and the stitch type used with each.

Week 3

Fabrication, Sewing, and Construction Techniques & Inspection, Packing, and Maintenance of Parachutes

  • Perform a systematic inspection of a canopy, lines, harness, container, and hardware using a written checklist and document every discrepancy found.

  • Measure line trim and line length against the manufacturer's tolerance and record the deviation.

  • Demonstrate folding and packing sequence for one canopy type while narrating each step aloud.

  • Identify the conditions that require a parachute to be removed from service versus repaired in place.

Your checkpoint

A completed inspection checklist on a training parachute with at least 15 line items, measured trim data, and a written disposition for each discrepancy.

Week 4

Inspection, Packing, and Maintenance of Parachutes & Rigging, Assembly, and Installation

  • Assemble a complete parachute system from components and verify each connection against the manufacturer's instructions.

  • Route suspension lines, attach connector links, and confirm riser orientation without reference to a diagram on the second attempt.

  • Pack and seal a reserve under supervision and record the seal number and packing date correctly.

  • Explain the difference between a pack job that is airworthy and one that is merely complete.

Your checkpoint

A supervised pack job with a correctly completed packing record and a self-scored assembly checklist at 90 percent or better.

Week 5

Maintenance, Repair, and Alteration & Regulations and Recordkeeping

  • Classify ten repair scenarios as minor repair, major repair, or alteration and cite the basis for each classification.

  • Describe the documentation and approval path for each classification, including who may perform the work.

  • Draft a repair order that captures the discrepancy, the approved method, the materials used, and the return-to-service signature.

  • Identify recordkeeping errors in three sample logbook entries and rewrite each correctly.

Your checkpoint

A repair classification worksheet covering 10 scenarios with the correct category, approval path, and required documentation for each.

Week 6

Emergency and Safety Procedures & Weight, Balance, and Performance

  • Explain the deployment sequence and failure points at each stage from throw to inflation.

  • Describe emergency procedures for a malfunction, a cutaway, and a reserve deployment, and state the decision criteria for each.

  • Calculate wing loading for three jumper and canopy combinations and interpret the resulting performance envelope.

  • Explain how weight, balance, and center of gravity affect canopy flight characteristics and landing approach.

Your checkpoint

A one-page performance worksheet with three wing-loading calculations, the resulting risk classification for each, and a written malfunction response summary.

Week 7

Parachute Materials, Components, and Hardware & Inspection, Packing, and Maintenance of Parachutes & Maintenance, Repair, and Alteration

  • Re-inspect the training parachute after a full repack cycle and compare findings to the week 3 inspection.

  • Perform two repairs from the week 5 worksheet under supervision and document the method used.

  • Audit a complete parachute file for missing records, expired repacks, and unsigned entries.

  • Explain the inspection intervals and wear indicators for hardware, webbing, and lines.

Your checkpoint

A completed file audit of one parachute with a written list of every deficiency and the corrective action required.

Week 8

Regulations and Recordkeeping & Fabrication, Sewing, and Construction Techniques & Inspection, Packing, and Maintenance of Parachutes & Rigging, Assembly, and Installation & Maintenance, Repair, and Alteration & Emergency and Safety Procedures & Weight, Balance, and Performance

  • Take a timed 100-question practice exam weighted by domain percentage and score each domain separately.

  • Review every missed question and write the underlying rule or procedure that was misunderstood.

  • Re-drill the two weakest domains with fresh practice sets until each reaches 80 percent.

  • Recite the repack intervals, record fields, and repair classification rules from memory without notes.

Your checkpoint

A timed practice exam score of 80 percent or better overall, with no domain below 70 percent, plus a written remediation log for every missed item.

Milestones

Week 2: Can name the material, stitch type, and strength class for at least 10 components without notes.

Week 4: Completes a supervised pack job with a correctly documented packing record and a self-scored assembly checklist at 90 percent or better.

Week 6: Correctly classifies 8 of 10 repair scenarios and computes three wing-loading values without error.

Week 8: Scores 80 percent or better on a timed 100-question practice exam with no domain below 70 percent.