FAA Parachute Rigger study materials
FAA Parachute Rigger study resources

FAA Parachute Rigger flashcards

FAA Parachute Rigger · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Part 65 rigger certificate
FAA parachute rigger certification is issued under 14 CFR Part 65, Subpart F, and requires practical experience, a knowledge test, and a practical test for the rating sought.
Senior rigger privileges
A senior rigger may pack, maintain, and perform minor repairs on parachutes, but may not construct or alter a parachute from an approved design.
Master rigger privileges
A master rigger may construct and alter parachutes from approved designs in addition to the packing and maintenance privileges of a senior rigger.
Packing record contents
The packing record must include the date of packing, the rigger's name and certificate number, and the type and model of the parachute packed.
Rigger currency requirement
A rigger certificate is valid for 24 months; the holder must have packed or maintained at least one parachute within the preceding 24 months to remain current.
Nylon 6.6 canopy fabric
Nylon 6.6 is the standard canopy and container fabric because of its strength, elasticity, and resistance to mildew and abrasion.
Ripstop nylon function
Ripstop nylon uses a grid of heavier threads that arrests tear propagation, so a small nick will not run beyond the reinforcing grid.
Spectra and Vectran lines
Spectra and Vectran suspension lines have high strength-to-weight ratios and low elongation, and must be inspected for creep and wear.
Tubular nylon webbing
Tubular nylon webbing, specified by MIL-W-4088, is used for harnesses and risers and is rated by strength in pounds matched to design load.
Three-ring release order
The three-ring release is assembled with the small ring through the medium ring, the medium ring through the large ring, and the cable through the small ring loop.
Lock stitch standard
The lock stitch is the standard parachute stitch; it must be locked at both ends and the thread tension adjusted so the seam does not pucker the fabric.
Stitch density specification
Parachute seams typically use 7 to 9 stitches per inch, with the seam allowance and thread type following the manufacturer's or MIL-spec drawing.
Bar tack purpose
Bar tacking reinforces stress points such as line attachment points and riser junctions, distributing load and strengthening the fabric.
Thread compatibility rule
Thread must be compatible with the fabric; nylon thread is used for nylon fabric and the thread size must match the seam specification, typically size E or FF.
Test seam before sewing
The sewing machine must be tested on a sample of the same fabric and thread before sewing the parachute, and the test seam inspected for stitch quality.
Reserve packing interval
The reserve parachute must be packed by a certificated rigger within the preceding 180 days for operations requiring an airworthiness certificate.
Packing data card
The packing data card must be attached to the parachute and show the packing date, the rigger's name and certificate number, and the parachute type and model.
Pre-packing inspection items
Before packing, the rigger inspects the canopy for holes, tears, and seam damage, the lines for broken or worn threads, and the hardware for cracks or corrosion.
AAD inspection schedule
The automatic activation device must be inspected and maintained per its schedule, and it is not a substitute for a properly packed reserve.
Harness adjustment check
The harness must be adjusted to the wearer so the leg straps, chest strap, and shoulder straps are snug and the hardware is properly routed.
RSL routing requirement
The reserve static line must be connected to the harness and reserve ripcord and routed so it does not interfere with main deployment.
Riser connector link check
The risers attach to the harness with the correct connector links, which must be tightened and the excess thread trimmed and stowed.
Line order verification
The main canopy must be assembled to the risers with the lines in the correct order, because a crossed or misrouted line will cause a malfunction.
Container sizing rule
The container must be assembled with the correct size and type of canopy, because a container that is too small or too large will affect deployment.
Minor repair authority
A senior rigger may perform minor repairs such as patching small holes and replacing line attachments, while major repairs and alterations require a master rigger.
Patch overlap requirement
A patch must be made with the same or approved material and must overlap the damaged area by at least the amount specified by the manufacturer.
Line replacement rule
A line replacement must use the same type and strength of line, and the line length must be measured and matched to the opposite line to maintain trim.
Alteration approval
An alteration to a parachute must be approved by the manufacturer or the FAA, because an unapproved alteration may render the parachute unairworthy.
Total malfunction response
A total malfunction with no canopy requires immediate reserve deployment; the reserve ripcord must be pulled firmly and the canopy checked after deployment.
Cutaway sequence
The cutaway procedure is to pull the cutaway handle and then the reserve ripcord, deploying the reserve before the decision altitude.
Wing loading definition
Wing loading is the total suspended weight divided by the canopy area; a higher wing loading increases descent rate and forward speed.
Density altitude effect
Higher density altitude reduces canopy performance, so performance calculations must account for pressure altitude and temperature.