FE Industrial & Systems study materials
FE Industrial & Systems study resources

FE Industrial & Systems cheat sheet

FE Industrial & Systems · Keep the key ideas within reach.

Quick reference

Mathematics and Statistics

  • Central Limit Theorem: for independent samples of size n ≥ 30, the sample mean is approximately normal with mean μ and standard error σ/√n regardless of the population's shape.

  • Confidence interval for a mean with σ known: x̄ ± z(α/2)·σ/√n; substitute t(α/2, n−1) when σ is estimated from the sample.

  • Test statistic for a mean: z = (x̄ − μ0)/(σ/√n); for a two-sided test reject H0 when |z| > z(α/2).

  • Poisson probability: P(X = k) = e^(−λ)·λ^k / k!, where λ is the expected count per interval; mean and variance both equal λ.

  • Binomial: P(X = k) = C(n,k)·p^k·(1−p)^(n−k), with mean np and variance np(1−p).

  • Exponential interarrival times: f(t) = λe^(−λt), mean = 1/λ, variance = 1/λ².

  • Bayes' theorem: P(A|B) = P(B|A)P(A) / [P(B|A)P(A) + P(B|A′)P(A′)].

  • Combinations C(n,r) = n!/[r!(n−r)!] count unordered selections; permutations nPr = n!/(n−r)! count ordered arrangements.

  • Least-squares regression: slope b1 = Σ(x−x̄)(y−ȳ)/Σ(x−x̄)² and intercept b0 = ȳ − b1·x̄.

Quick reference

Engineering Economics

  • Single-payment factors: F = P(1+i)^n and P = F(1+i)^(−n), written (F/P, i, n) and (P/F, i, n).

  • Uniform series present worth: (P/A, i, n) = [(1+i)^n − 1]/[i(1+i)^n]; the capital recovery factor (A/P) is its reciprocal.

  • Uniform series future worth: (F/A, i, n) = [(1+i)^n − 1]/i; the sinking fund factor is (A/F, i, n) = i/[(1+i)^n − 1].

  • Capitalized cost for a perpetual project: CC = initial cost + A/i, where A is the equivalent uniform annual cost.

  • Decision rule for independent projects: accept when NPW ≥ 0 or when IRR ≥ MARR; for mutually exclusive alternatives choose the largest positive NPW or the highest incremental IRR.

  • Straight-line depreciation: D = (first cost − salvage value)/N per year; book value after n years = first cost − n·D.

  • Break-even quantity Q* = fixed cost/(unit price − unit variable cost); the denominator is the contribution margin per unit.

  • Real interest rate: i_real = (1 + i_market)/(1 + f) − 1, where f is the inflation rate.

  • Benefit-cost ratio = equivalent benefits / equivalent costs; a ratio ≥ 1 indicates an economically acceptable public project.

Quick reference

Ethics and Professional Practice

  • Fundamental canon: engineers shall hold paramount the safety, health, and welfare of the public in performing professional duties.

  • Seal rule: engineers shall not seal or sign plans or documents not prepared by them or under their direct supervisory control.

  • Competence rule: engineers shall perform services only in areas of their competence and shall not misrepresent their qualifications or experience.

  • Conflict of interest: engineers shall disclose known or potential conflicts and shall not accept compensation from more than one party for the same service.

  • Confidentiality: information obtained in professional practice shall not be disclosed without consent except where required by law or code.

  • Bribery and gifts: engineers shall not offer, give, solicit, or accept anything of value to influence the judgment of others on a project.

  • Public statements: engineers shall issue statements only in an objective and truthful manner and shall identify the client when commenting on their work.

  • Violations: an engineer with knowledge of a code violation shall report it in writing to the proper authority.

  • Contingency fees: engineers shall not accept compensation contingent on decisions by a public board or commission that affect public safety.

Quick reference

Manufacturing and Production Systems

  • Little's Law: WIP = throughput × flow time; valid for any steady-state system, so shortening flow time cuts WIP at constant throughput.

  • Takt time = available production time per period / customer demand per period; it sets the required pace of the line.

  • OEE = availability × performance × quality, where each factor is an actual-over-ideal ratio; world-class is often cited near 85%.

  • Seven wastes of lean: overproduction, waiting, transportation, overprocessing, inventory, motion, and defects.

  • Machines required = ceiling of (demand × time per unit)/(available time per machine).

  • SMED shortens changeover by converting internal setup steps (machine stopped) into external steps (machine running).

  • Cellular manufacturing applies group technology to form part families produced on dedicated cells, reducing setup and material handling.

  • Six Sigma improvement sequence: Define, Measure, Analyze, Improve, Control (DMAIC).

  • Job-shop sequencing: SPT minimizes average flow time and average WIP; EDD minimizes maximum lateness; Johnson's rule solves the two-machine flow shop.

Quick reference

Production Planning and Control

  • EOQ = √(2DS/H), with D = annual demand, S = cost per order or setup, and H = annual holding cost per unit.

  • Total annual inventory cost = (D/Q)S + (Q/2)H; at the EOQ, ordering cost equals holding cost.

  • Reorder point = demand rate × lead time (same time units) plus safety stock when demand or lead time is uncertain.

  • MRP net requirement = gross requirement − scheduled receipts − on-hand inventory + safety stock.

  • MRP processing order: explode the MPS through the bill of materials, net requirements, apply lot sizing, then offset by lead time.

  • Aggregate planning options: chase (vary workforce or output), level (use inventory and backlogs), and mixed; select the lowest total-cost plan.

  • Learning curve: Y_x = a·x^b with b = log(learning rate)/log 2; an 80% curve gives b ≈ −0.322.

  • Safety stock for a target cycle service level = z × σ of demand during lead time.

  • Johnson's rule: repeatedly take the shortest remaining processing time, scheduling that job first if it lies on machine 1 and last if on machine 2.

Quick reference

Facilities and Logistics

  • Systematic Layout Planning (Muther): analyze flow and activity relationships (A, E, I, O, U, X) → relationship diagram → space requirements → block layout.

  • Assembly-line balancing: cycle time C = available time per period / required output; minimum workstations = ceiling(Σ task times / C).

  • Ranked positional weight heuristic: order tasks by their time plus the times of all following tasks, then assign greedily without exceeding cycle time.

  • Load-distance score = Σ(load_i × distance_i); the preferred layout minimizes this sum.

  • Center-of-gravity location: x* = Σw_i·x_i / Σw_i and y* = Σw_i·y_i / Σw_i, with w_i the volume moved to or from site i.

  • A From-To chart quantifies material flows between departments; a relationship chart is used when qualitative closeness ratings dominate.

  • ABC classification: class A items are roughly 20% of the items and about 80% of the value, justifying tight control and frequent cycle counts.

  • Computerized layout tools: CRAFT improves an existing layout by pairwise department exchange; ALDEP and CORELAP construct layouts from relationship ratings.

  • Cross-docking transfers goods directly from receiving to shipping with little or no storage, reducing inventory and dwell time.

Quick reference

Human Factors and Ergonomics

  • NIOSH lifting equation: RWL = LC × HM × VM × DM × AM × FM × CM; lifting index = load weight / RWL, and LI > 1 indicates elevated risk.

  • Anthropometric practice: design to the 5th percentile where reach is limiting and to the 95th percentile where clearance is limiting.

  • Fitts' law: movement time MT = a + b·log2(2D/W); larger targets and shorter distances reduce pointing time.

  • OSHA noise limits: 90 dBA time-weighted average for an 8-hour day, with an 85 dBA action level; allowable exposure time halves for each 5 dB increase.

  • Illuminance guidance: about 500 lux for routine office and reading tasks, with substantially higher levels for inspection of small details.

  • Cognitive limits: short-term memory holds about 7 ± 2 chunks (Miller), and choice reaction time grows with the log2 of the number of alternatives (Hick-Hyman law).

  • Workstation height for light seated work is approximately seated elbow height; work sustained above shoulder height accelerates shoulder fatigue.

  • Physiological workload measures include oxygen consumption, heart rate, and metabolic energy expenditure, used to set work-rest cycles.

Quick reference

Quality Engineering

  • Cp = (USL − LSL)/(6σ); Cpk = min[(USL − μ)/3σ, (μ − LSL)/3σ], so Cpk penalizes off-center processes.

  • x̄-chart limits: UCL/LCL = x̄̄ ± A2·R̄; R-chart limits: UCL = D4·R̄ and LCL = D3·R̄, using constants tabulated for subgroup size n.

  • Out-of-control signals: any point beyond a control limit, or a run of seven consecutive points on one side of the centerline, indicates a special cause.

  • Taguchi loss function: L(x) = k(x − T)², with k = A0/Δ0², where A0 is the loss at deviation Δ0 from the target T.

  • OC curve risks: α is the producer's risk of rejecting a lot at the AQL, and β is the consumer's risk of accepting a lot at the LTPD.

  • Seven QC tools: Pareto chart, cause-and-effect diagram, check sheet, histogram, scatter diagram, control chart, and flow chart.

  • p-chart limits: p̄ ± 3√[p̄(1 − p̄)/n]; a c-chart tracks the count of defects per inspection unit.

  • Capability benchmark: Cpk ≥ 1.33 is commonly required for an established process, and Cpk ≥ 1.67 for new or safety-critical processes.

  • Factorial design: a 2^k experiment estimates k main effects and their interactions using 2^k treatment combinations.

Quick reference

Operations Research

  • M/M/1 results: ρ = λ/μ, L = ρ/(1−ρ), Lq = ρ²/(1−ρ), W = 1/(μ−λ), and Wq = λ/[μ(μ−λ)].

  • LP duality: the shadow price of a constraint equals the change in the optimal objective per unit increase in its right-hand side, and is zero when the constraint has slack.

  • Expected value of perfect information: EVPI = expected value with perfect information − maximum EMV without it.

  • CPM network: forward pass gives ES and EF, backward pass gives LS and LF, slack = LS − ES, and the critical path has zero slack.

  • PERT three-point estimate: tE = (a + 4m + b)/6 with variance [(b − a)/6]².

  • Transportation problem: northwest-corner or least-cost rule gives a starting solution; the stepping-stone or MODI method tests and achieves optimality.

  • Max-flow min-cut theorem: the maximum flow from source to sink equals the capacity of the minimum cut separating them.

  • Assignment problem: the Hungarian method finds the minimum-cost one-to-one assignment of jobs to resources.

  • Decision criteria under uncertainty: maximax (optimistic), maximin (pessimistic), and minimax regret, contrasted with EMV under risk.

Quick reference

Systems Engineering and Management

  • Life cycle phases: concept, development, production, utilization and support, and retirement; the V-model pairs each design decomposition level with a corresponding verification level.

  • Good requirements are unambiguous, verifiable, and traceable to design elements and test cases.

  • N² (N-squared) diagrams map functional and physical interfaces; the design structure matrix exposes coupling and suggests sequencing.

  • Earned value: CPI = EV/AC and SPI = EV/PV; CPI < 1 indicates cost overrun and SPI < 1 indicates schedule slippage.

  • Risk exposure = probability of occurrence × consequence; handling options are avoid, mitigate, transfer, and accept.

  • Reliability: series R = R1×R2×…×Rn; parallel R = 1 − (1−R1)(1−R2)…(1−Rn); exponential model R(t) = e^(−λt) with MTBF = 1/λ.

  • Configuration baselines: functional (requirements), allocated (derived requirements), and product (as-built); changes flow through a change control board.

  • Trade study procedure: define weighted evaluation criteria, score each alternative, run sensitivity analysis, and document the rationale for the selection.