FE Industrial & Systems key terms
FE Industrial & Systems · Get comfortable with the vocabulary.
- Central Limit Theorem
- Related: Confidence Interval, p-value
A statistical principle stating that the distribution of sample averages approaches a normal distribution as sample size grows, regardless of the shape of the underlying population distribution.
- Confidence Interval
- Related: Central Limit Theorem, p-value
A range of values, computed from sample data, that is expected to contain the true population parameter with a stated probability, such as 95 percent.
- p-value
- Related: Confidence Interval, Central Limit Theorem
The probability of observing a test statistic as extreme as, or more extreme than, the one computed from the sample, assuming the null hypothesis is true.
- Poisson Distribution
- Related: Queueing Theory
A discrete probability model for the number of events occurring in a fixed time or space interval when those events happen independently at a constant average rate.
- Linear Regression
- Related: Central Limit Theorem
A method that fits a straight-line equation to paired data so one variable can be predicted from another, typically by minimizing the sum of squared errors.
- Net Present Value
- Related: Internal Rate of Return, Equivalent Uniform Annual Worth
The sum of all project cash flows discounted to today's dollars at a chosen interest rate; a positive value suggests the investment earns more than the required return.
- Internal Rate of Return
- Related: Net Present Value, Payback Period
The discount rate at which a project's net present value equals zero, representing the annual percentage yield the investment is expected to generate over its life.
- Payback Period
- Related: Net Present Value
The length of time required for cumulative cash inflows to equal the initial investment, used as a simple measure of how quickly capital is recovered without discounting future flows.
- Equivalent Uniform Annual Worth
- Related: Net Present Value, Internal Rate of Return
The constant annual amount, spread over a project's life, that has the same present value as the project's actual uneven cash flows and salvage value.
- Code of Ethics
- Related: Conflict of Interest, Whistleblowing
A formal set of principles adopted by a professional engineering society that defines expected conduct, such as holding public safety paramount and practicing only within one's competence.
- Conflict of Interest
- Related: Code of Ethics
A situation in which an engineer's personal, financial, or other interest could improperly influence professional judgment, requiring disclosure or withdrawal from the decision.
- Whistleblowing
- Related: Code of Ethics, Conflict of Interest
Reporting an employer's illegal, unsafe, or unethical practice to an outside authority or the public, usually after internal channels fail to correct the problem.
- Lean Manufacturing
- Related: Just-in-Time, Takt Time
A production philosophy focused on identifying and eliminating waste in all its forms so that value flows to the customer with minimal delay, inventory, and effort.
- Just-in-Time
- Related: Lean Manufacturing, Safety Stock
A production approach in which materials and components arrive exactly when needed for use, minimizing inventory holding costs while requiring reliable suppliers and stable schedules.
- Takt Time
- Related: Line Balancing, Lean Manufacturing
The available production time divided by customer demand over the same period; it sets the pace a process must meet to satisfy demand without building excess inventory.
- Overall Equipment Effectiveness
- Related: Lean Manufacturing
A composite metric multiplying equipment availability, performance efficiency, and quality rate to show how much of a machine's potential productive time becomes good output.
- Master Production Schedule
- Related: Material Requirements Planning, Economic Order Quantity
A time-phased plan stating which finished products, in what quantities, will be completed in each period, driving material and capacity planning beneath the aggregate plan.
- Material Requirements Planning
- Related: Master Production Schedule, Safety Stock
A planning technique that explodes a bill of materials against the master schedule and inventory records to determine component net requirements, order quantities, and due dates.
- Economic Order Quantity
- Related: Safety Stock, Material Requirements Planning
The order size that minimizes the combined cost of placing orders and holding inventory, calculated from annual demand, setup cost, and per-unit holding cost.
- Safety Stock
- Related: Economic Order Quantity, Just-in-Time
Extra inventory held to absorb unexpected demand or supplier delays, protecting service levels when forecasts and replenishment lead times are uncertain.
- Load-Distance Model
- Related: Systematic Layout Planning
A layout evaluation method that scores alternative arrangements by multiplying the flow between departments by the distance separating them, with lower totals indicating better layouts.
- Systematic Layout Planning
- Related: Load-Distance Model, Line Balancing
A structured procedure that begins with flow and relationship data between departments and works through a series of charts to develop and refine a facility arrangement.
- Line Balancing
- Related: Takt Time, Systematic Layout Planning
Assigning tasks to workstations along a serial production line so station times are as equal as possible while meeting the required cycle time and precedence constraints.
- Anthropometry
- Related: NIOSH Lifting Equation
The measurement of human body dimensions and reach, used to size workspaces, tools, and equipment so most of the user population can use them comfortably.
- NIOSH Lifting Equation
- Related: Anthropometry, Cognitive Workload
A formula that computes a recommended weight limit for a manual lifting task from factors such as horizontal distance, vertical height, twisting, hand coupling, and lifting frequency.
- Cognitive Workload
- Related: Anthropometry
The mental effort required to perform a task, influenced by information volume, time pressure, and complexity; excessive workload raises error rates and fatigue.
- Control Chart
- Related: Process Capability Index, Acceptance Sampling
A time-ordered plot of a process statistic with statistically derived upper and lower limits, used to separate normal random variation from assignable causes.
- Process Capability Index
- Related: Control Chart
A ratio comparing the width of a specification range to the natural variation of a stable process, indicating how well that process can meet tolerances.
- Acceptance Sampling
- Related: Control Chart, Pareto Analysis
A quality inspection procedure that draws a random sample from a lot and accepts or rejects the entire lot based on the number of defects found.
- Pareto Analysis
- Related: Control Chart
A prioritization technique based on the observation that a small number of causes usually produce most of the effect, directing improvement effort to the largest contributors.
- Linear Programming
- Related: Shadow Price, Queueing Theory
An optimization method that maximizes or minimizes a linear objective function subject to linear constraints, used for resource allocation, blending, and product mix decisions.
- Shadow Price
- Related: Linear Programming
The rate at which the optimal objective value changes when one constraint's right-hand side is relaxed by one unit; it reveals the marginal value of scarce capacity.
- Critical Path Method
- Related: PERT, Earned Value Management
A network scheduling technique that identifies the longest sequence of dependent activities in a project, which determines the shortest possible project duration.
- PERT
- Related: Critical Path Method
A probabilistic network scheduling method that uses three time estimates per activity, optimistic, most likely, and pessimistic, to compute expected durations and completion probabilities.
- Queueing Theory
- Related: Poisson Distribution, Linear Programming
A branch of probability modeling that predicts waiting times, queue lengths, and server utilization for systems where customers arrive randomly and require service.
- Requirements Traceability
- Related: Functional Decomposition, Trade Study
The practice of linking each requirement to its source and to the design elements, tests, and evidence that satisfy it, so coverage and impacts can be demonstrated.
- Functional Decomposition
- Related: Requirements Traceability, Work Breakdown Structure
Breaking a system's overall purpose into progressively smaller subfunctions until each can be allocated to a specific component or subsystem for design.
- Trade Study
- Related: Functional Decomposition, Requirements Traceability
A structured comparison of design alternatives against weighted criteria such as cost, performance, risk, and schedule, used to justify selecting one option.
- Work Breakdown Structure
- Related: Earned Value Management, Critical Path Method
A hierarchical, deliverable-oriented breakdown of project scope into manageable work packages, forming the basis for estimating, scheduling, and assigning responsibility.
- Earned Value Management
- Related: Work Breakdown Structure, Critical Path Method
A project control technique comparing the budgeted value of work planned, the value of work actually performed, and actual cost to forecast cost and schedule performance.