FGIA InstallationMasters study plan
FGIA InstallationMasters · Give each week a clear focus.
8 weeks · About 6 hours per week
Replacement installation
Map the replacement installation domain into a personal outline covering removal, substrate inspection, flashing integration, and finish trim, listing every subtopic you can name before consulting any reference
Define the terms that govern replacement work - rough opening versus frame opening, sill pan, backer rod, head flashing, pan flashing, and weep pathway - and write a one-sentence definition for each in your own words
Sequence the standard replacement workflow from site protection through final sealant cure, numbering each step and noting where inspection hold points fall
Identify the three most common failure modes reported after replacement installs (water intrusion at the sill, air leakage at the head, and improper fastening through the flange) and describe the mechanism behind each
Your checkpoint
A one-page replacement workflow diagram with numbered steps, labeled hold points, and the three failure modes annotated at the step where each originates
Replacement installation
Explain how to measure a replacement opening for width, height, square, and level, and state the tolerance you would accept before ordering a unit
Describe the correct order of operations for flashing a replacement window in a wall with an existing weather-resistive barrier, including where the sill pan laps the barrier and where the head flashing tucks behind it
Compare fastening strategies for flanged units versus block-frame units and state when each is appropriate
List the sealant joints a replacement install requires and specify interior versus exterior sealant placement and why the interior joint is typically left to the finish carpenter
Your checkpoint
A written measurement-and-flashing procedure of at least 300 words that a helper could follow without asking you a question, plus a labeled sketch of sill pan and head flashing laps
Replacement installation
Diagnose five hypothetical replacement scenarios (rot at the sill, out-of-square opening, masonry veneer, stucco wall, and a unit set in an existing frame) and prescribe the corrective action for each
Explain how to handle discovery of deteriorated framing or sheathing mid-install, including what must be repaired before the new unit is set and who should authorize the change
Describe the water-management principle of shingle-fashion layering and apply it to a full replacement assembly from sill to head
State the inspection items a third-party inspector would check on a replacement job and rank them by consequence of failure
Your checkpoint
A five-scenario troubleshooting table with columns for symptom, root cause, corrective action, and who authorizes the fix
Replacement installation
Complete a closed-book self-test of at least 40 replacement-domain questions and score yourself honestly
Review every missed item and write the underlying rule, not just the correct answer, so the same mistake cannot repeat in a different phrasing
Re-derive the flashing sequence and fastening rules from memory and check them against your week 2 procedure, correcting any drift
Explain air sealing and insulation detailing at the rough opening perimeter for a replacement unit, including where the air barrier must be continuous
Your checkpoint
A scored practice test with an error log listing each missed item, the correct rule, and the reference that confirms it
New construction installation
Map the new construction domain into an outline covering rough opening preparation, frame and flange installation, integrated flashing, air and water barriers, and interior/exterior finishing
Contrast new construction and replacement installation point by point, listing at least eight differences and the reason each exists
Describe how to verify a rough opening for size, square, level, and plumb before the unit arrives, and state the clearance and shim requirements
Explain the role of the weather-resistive barrier and how the window integrates with it in new construction versus a retrofit
Your checkpoint
A side-by-side comparison table of at least eight new-construction versus replacement differences, each with a stated reason
New construction installation
Sequence a complete new construction window installation from rough opening verification through final sealant, numbering steps and marking inspection hold points
Describe shimming practice at sill, jambs, and head, and explain how shim placement affects operation, square, and load transfer
Explain flashing integration for new construction including sill pan, jamb flashing, and head flashing, and state the lap direction at each transition
Describe air sealing details at the rough opening and how they interact with the wall's air barrier and insulation strategy
Your checkpoint
A complete new construction installation sequence of at least 300 words with numbered steps, hold points, and lap directions stated explicitly
New construction installation
Diagnose five hypothetical new construction scenarios (rough opening too large, out-of-square framing, missing sill pan, reversed head lap, and flange fastened through the weather barrier without sealant) and prescribe the fix
Explain how to install into common wall assemblies - wood frame with siding, masonry veneer, and stucco - and state the material and detail differences for each
State the inspection items a third-party inspector would check on new construction and rank them by consequence of failure
Reconcile your new construction procedure against your replacement procedure and note where a single shared principle applies to both
Your checkpoint
A five-scenario troubleshooting table for new construction plus a one-page list of principles that apply identically to both domains
Replacement installation & New construction installation
Complete a timed, closed-book mock exam covering both domains in proportion to their weight and score it
Review every missed item across both domains and write the governing rule for each, cross-checking against your week 4 and week 7 error logs
Re-derive the flashing sequence, fastening rules, and shimming practice from memory for both domains and correct any remaining drift
Identify your three weakest subtopics and write a short corrective summary for each that you can reread in the final days
Your checkpoint
A scored full mock exam plus a final one-page weak-area summary covering no more than three subtopics
Milestones
Week 2: You can write the replacement measurement and flashing procedure from memory, without notes, and it matches your reference on every lap direction and tolerance
Week 4: You score at least 80 percent on a closed-book replacement-domain self-test of 40 or more questions, and every missed item has a written rule in your error log
Week 6: You can state at least eight new-construction versus replacement differences and the reason for each, and you can sequence a new construction install end to end without notes
Week 8: You score at least 85 percent on a timed full mock exam weighted to the 50/50 domain split, with no domain below 75 percent