FL HVAC · Give each week a clear focus.
8 weeks · About 7 hours per week
Business, Financial Management, and Contracting Practices
Compute a fully burdened hourly labor rate from base wage, payroll taxes, workers' comp, general liability, truck, and overhead costs for three technician tiers
Distinguish markup from gross margin and reprice five representative service and install jobs to hit a 45% gross margin target
Build a 12-month cash-flow projection for a hypothetical four-crew residential company and identify the break-even month
List the components of a complete written contract for HVAC work (scope, price, payment schedule, change orders, warranty, dispute resolution) and explain why each protects the contractor
Your checkpoint
A one-page pricing sheet showing burdened labor rate, overhead recovery per hour, and 45%-margin sell prices for five jobs, plus the completed cash-flow workbook with break-even month identified
Business, Financial Management, and Contracting Practices & Florida Building Code, Statutes, and Contractor Licensing Regulations
Calculate progress billing, retainage withholding, and final payment amounts on a $180,000 residential/commercial project scenario
Draft a change-order form and three subcontract/purchase-order clauses covering payment terms, delay damages, and lien-related documentation
Contrast Florida certified vs registered contractor status, scope-of-work limits, and the role of local competency boards in licensing
Identify the Chapter 489 statutes and administrative rules governing unlicensed contracting, citation penalties, and license discipline
Outline the construction lien notice and deadline sequence a mechanical contractor must follow on a private project
Your checkpoint
A two-page contract risk checklist (billing, retainage, change orders, lien deadlines) plus a one-page Florida licensing roadmap covering certified, registered, and local pathways
Florida Building Code, Statutes, and Contractor Licensing Regulations & Load Calculations and System Sizing
Trace the Florida Building Code permit-to-closeout sequence: permit application, required inspections, and certificate of occupancy/completion for a mechanical permit
Perform a room-by-room and block load calculation for a 2,000 sq ft Florida house using Miami and Orlando design conditions
Select equipment using a sizing/sensible-heat-ratio check and verify the selected unit's sensible and latent capacity balance the calculated load
Quantify how duct gain, infiltration, and internal gains change the calculated load and explain why oversizing degrades humidity control in a hot-humid climate
Your checkpoint
A completed load calculation worksheet for two Florida climates with a written equipment selection justification showing SHR match and no more than 15% oversizing
Load Calculations and System Sizing & Equipment Selection, Installation, and Start-Up
Match indoor coils, air handlers, and outdoor units using AHRI ratings and verify SEER2, EER2, and HSPF2 values against current Florida efficiency requirements
Write a startup sequence covering pressure/leak test, evacuation to target microns, and charge verification by subcooling (TXV) or superheat (fixed orifice)
Calculate a total external static pressure budget and set blower speed to hit design airflow within tolerance
Identify common installation defects (line-set routing, trap, clearances, pad, condensate disposal, secondary drain pan) and the code or manufacturer provision each violates
Your checkpoint
A commissioning checklist completed against a sample 3-ton split system, including AHRI match number, evacuation log, charge verification readings, and measured static pressure and airflow
Equipment Selection, Installation, and Start-Up & Ductwork Design, Air Distribution, and Ventilation
Lay out a trunk-and-branch system and an extended plenum system using both equal-friction and velocity-reduction methods, and compare the resulting friction rates
Size supply and return ducts, registers, and grilles using face velocity and throw limits, and tabulate the results
Calculate required outdoor ventilation air and exhaust for a residence using the applicable ventilation standard and explain make-up air implications
Evaluate a duct location (attic vs conditioned space) for conduction gain and leakage loss and recommend corrective detailing
Your checkpoint
A fully dimensioned duct layout with a sizing table showing CFM, duct size, velocity, and friction rate for every branch, plus a ventilation air calculation
Ductwork Design, Air Distribution, and Ventilation & Refrigeration Principles and Refrigerant Handling
Verify duct sealing, insulation R-value, and leakage testing requirements against the energy code and record measurements on a sample system
Trace the vapor-compression cycle on a pressure-temperature chart and identify the state and superheat/subcooling at each of the four points
Calculate target superheat and subcooling for given indoor/outdoor conditions and diagnose an undercharge and an overcharge from sample readings
Apply EPA refrigerant handling rules: recovery requirements by appliance type, evacuation levels, leak repair timelines, and recordkeeping
Your checkpoint
A refrigerant troubleshooting matrix mapping six symptom sets (high superheat, low subcooling, high head, low suction, etc.) to likely causes and corrective actions, with P-T chart plots attached
Refrigeration Principles and Refrigerant Handling & Electrical Systems, Controls, and Motors
Compute conductor ampacity, overcurrent protection, disconnect, and grounding requirements for a heat pump with auxiliary electric heat using the applicable code articles
Interpret a ladder diagram for a heat pump with auxiliary heat and write the step-by-step sequence of operation from call for cooling through defrost
Test capacitors, contactors, and PSC/ECM motors with a multimeter and state the pass/fail criteria for each measurement
Explain compressor protection devices, low-voltage control circuits, and thermostat wiring for multi-stage and heat-pump systems
Your checkpoint
A written sequence-of-operation narrative for a heat pump with auxiliary heat plus a motor and component test log with measured values and pass/fail determinations
Electrical Systems, Controls, and Motors & Safety, Jobsite Practices, and Environmental Compliance
Complete a full-length timed practice exam and trace every missed item back to a code section, statute, or manufacturer specification
Summarize jobsite safety requirements: lockout/tagout, PPE, ladder and fall protection, brazing fire watch, and refrigerant exposure limits
Describe environmentally compliant recovery, cylinder handling, and documentation practices for refrigerant and hazardous waste
Re-drill the two lowest-scoring domains with targeted practice sets until each reaches 80%
Your checkpoint
A scored full-length practice exam report with a remediation list pairing each missed item to its source code or statute and a re-test score of at least 80% on the two weakest domains
Milestones
Week 2: Score 75% or better on a 30-question quiz covering business/financial/contracting plus licensing and code-administration items, and submit the contract risk checklist
Week 4: Produce a complete load calculation and an AHRI-matched equipment selection that passes a self-review against oversizing and SHR criteria
Week 6: Correctly diagnose at least 5 of 6 refrigerant symptom cases and pass a duct sizing table review with no branch exceeding velocity limits
Week 7: Draw the heat pump with auxiliary heat ladder diagram from memory and state correct ampacity and overcurrent sizing for a sample unit
Week 8: Achieve 80% or higher on the full-length timed practice exam with every missed item traced to a cited source