CAPES · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Critical Path Method and Schedule Calculation & Scheduling Fundamentals, Terminology, and Standards

  • Compute forward pass, backward pass, total float, and free float by hand for a 15-activity network with two calendars

  • Distinguish total float, free float, and negative float and state which one a scheduler should report to management

  • Define critical path using both zero-total-float and longest-path definitions and reconcile the two when constraints create negative float

  • Identify the scheduling standard, glossary, and terminology sources you will cite and record them in a reference sheet

Your checkpoint

A hand-calculated 15-activity network diagram with forward/backward pass table, float columns, and a one-page terminology reference sheet

Week 2

Critical Path Method and Schedule Calculation & Activity Sequencing, Durations, and Logic Relationships

  • Build the same network in scheduling software and reconcile every calculated date and float value against your Week 1 hand calculation

  • Classify each relationship as finish-to-start, start-to-start, finish-to-finish, or start-to-finish and justify lag and lead values

  • Diagnose and correct open-ended logic, dangling activities, and lags that mask true float

  • Explain how constraints (start-no-earlier-than, finish-no-later-than) distort float and when each constraint type is defensible

Your checkpoint

A software-built schedule with a written reconciliation memo listing every variance from the hand calculation and its cause

Week 3

Schedule Development and Work Breakdown Structure & Activity Sequencing, Durations, and Logic Relationships

  • Decompose a sample project into a WBS to at least three levels with a unique code of accounts and a WBS dictionary entry per work package

  • Map every WBS work package to at least one schedule activity and flag any package with no activity or any activity with no package

  • Select duration-estimation methods (analogous, parametric, three-point) for five activity types and document the basis of estimate for each

  • Apply productivity-based duration calculation including quantity, crew size, and shift calendar, and show the arithmetic

Your checkpoint

A WBS-to-activity traceability matrix covering 40+ activities with basis-of-estimate notes for each duration

Week 4

Resource Planning, Loading, and Leveling & Cost Loading and Schedule-Cost Integration

  • Assign resources and quantities to the critical path and produce a resource histogram and S-curve

  • Distinguish resource leveling from resource smoothing and demonstrate the schedule and float impact of each on the same plan

  • Resolve an over-allocation by leveling and quantify the resulting critical path extension

  • Load cost to activities, assign a time-phased cost distribution, and produce a cost-loaded schedule reconciled to the project budget

Your checkpoint

A resource-loaded, cost-loaded schedule with before/after leveling histograms and a budget reconciliation showing total loaded cost equals the control budget

Week 5

Progress Measurement, Performance Analysis, and Forecasting & Schedule Risk Analysis and Contingency

  • Define measurable progress rules (0/100, 50/50, percent complete by duration, weighted milestones) and assign the appropriate rule per activity type

  • Calculate BCWS, BCWP, ACWP, SV, CV, SPI, and CPI for a reporting period and interpret each result in plain language

  • Produce an independent estimate at completion using at least two EAC formulas and explain when each is appropriate

  • Perform a schedule risk analysis: build a three-point estimate set, run a Monte Carlo simulation, and read the probabilistic completion date at P50, P80, and P90

  • Size a schedule contingency reserve from simulation output and justify the chosen confidence level

Your checkpoint

A performance report with earned value metrics, two EAC forecasts, a simulation tornado/criticality output, and a documented contingency reserve with justification

Week 6

Schedule Risk Analysis and Contingency & Progress Measurement, Performance Analysis, and Forecasting

  • Identify top schedule risk drivers from the simulation and propose a specific mitigation with its cost and schedule effect

  • Re-run the risk analysis after mitigation and compare P80 dates before and after

  • Apply a defined progress measurement method to a set of activities and verify the resulting percent-complete rollup against the schedule

  • Explain how out-of-sequence progress and retained logic settings change reported progress and float consumption

  • Forecast the finish date using both the SPI-based and the critical-path-based methods and explain the divergence

Your checkpoint

A revised risk-adjusted forecast package containing the mitigation plan, before/after simulation comparison, and a written forecast narrative

Week 7

Schedule Change Control and Baseline Management & Schedule Quality, Validation, and Reporting

  • Establish a baseline, then process three change requests through a documented change control workflow including impact analysis and approval authority

  • Distinguish baseline revision from a simple progress update and state the criteria for each

  • Run a schedule quality check against a defined checklist (logic density, lags, constraints, float, hard-coded dates, open ends) and score the schedule

  • Correct each quality defect found and re-score to show improvement

  • Assemble a reporting package with the required views for a defined audience

Your checkpoint

A change log with three processed change requests, a before/after schedule quality scorecard, and a complete reporting package

Week 8

Schedule Quality, Validation, and Reporting & Scheduling Fundamentals, Terminology, and Standards & Critical Path Method and Schedule Calculation

  • Complete a full-length timed practice exam and score it by domain to identify remaining weak areas

  • Re-derive critical path and float calculations under time pressure with no reference material

  • Review every missed item by domain and write the underlying rule you got wrong

  • Recite from memory the key definitions and formulas for all ten domains using your consolidated reference sheet

  • Confirm exam-day logistics, allowed reference materials, and calculator policy from the official handbook

Your checkpoint

A scored practice exam with a domain-level error analysis and a one-page final formula and definitions sheet