CAPES study plan
CAPES · Give each week a clear focus.
8 weeks · About 8 hours per week
Critical Path Method and Schedule Calculation & Scheduling Fundamentals, Terminology, and Standards
Compute forward pass, backward pass, total float, and free float by hand for a 15-activity network with two calendars
Distinguish total float, free float, and negative float and state which one a scheduler should report to management
Define critical path using both zero-total-float and longest-path definitions and reconcile the two when constraints create negative float
Identify the scheduling standard, glossary, and terminology sources you will cite and record them in a reference sheet
Your checkpoint
A hand-calculated 15-activity network diagram with forward/backward pass table, float columns, and a one-page terminology reference sheet
Critical Path Method and Schedule Calculation & Activity Sequencing, Durations, and Logic Relationships
Build the same network in scheduling software and reconcile every calculated date and float value against your Week 1 hand calculation
Classify each relationship as finish-to-start, start-to-start, finish-to-finish, or start-to-finish and justify lag and lead values
Diagnose and correct open-ended logic, dangling activities, and lags that mask true float
Explain how constraints (start-no-earlier-than, finish-no-later-than) distort float and when each constraint type is defensible
Your checkpoint
A software-built schedule with a written reconciliation memo listing every variance from the hand calculation and its cause
Schedule Development and Work Breakdown Structure & Activity Sequencing, Durations, and Logic Relationships
Decompose a sample project into a WBS to at least three levels with a unique code of accounts and a WBS dictionary entry per work package
Map every WBS work package to at least one schedule activity and flag any package with no activity or any activity with no package
Select duration-estimation methods (analogous, parametric, three-point) for five activity types and document the basis of estimate for each
Apply productivity-based duration calculation including quantity, crew size, and shift calendar, and show the arithmetic
Your checkpoint
A WBS-to-activity traceability matrix covering 40+ activities with basis-of-estimate notes for each duration
Resource Planning, Loading, and Leveling & Cost Loading and Schedule-Cost Integration
Assign resources and quantities to the critical path and produce a resource histogram and S-curve
Distinguish resource leveling from resource smoothing and demonstrate the schedule and float impact of each on the same plan
Resolve an over-allocation by leveling and quantify the resulting critical path extension
Load cost to activities, assign a time-phased cost distribution, and produce a cost-loaded schedule reconciled to the project budget
Your checkpoint
A resource-loaded, cost-loaded schedule with before/after leveling histograms and a budget reconciliation showing total loaded cost equals the control budget
Progress Measurement, Performance Analysis, and Forecasting & Schedule Risk Analysis and Contingency
Define measurable progress rules (0/100, 50/50, percent complete by duration, weighted milestones) and assign the appropriate rule per activity type
Calculate BCWS, BCWP, ACWP, SV, CV, SPI, and CPI for a reporting period and interpret each result in plain language
Produce an independent estimate at completion using at least two EAC formulas and explain when each is appropriate
Perform a schedule risk analysis: build a three-point estimate set, run a Monte Carlo simulation, and read the probabilistic completion date at P50, P80, and P90
Size a schedule contingency reserve from simulation output and justify the chosen confidence level
Your checkpoint
A performance report with earned value metrics, two EAC forecasts, a simulation tornado/criticality output, and a documented contingency reserve with justification
Schedule Risk Analysis and Contingency & Progress Measurement, Performance Analysis, and Forecasting
Identify top schedule risk drivers from the simulation and propose a specific mitigation with its cost and schedule effect
Re-run the risk analysis after mitigation and compare P80 dates before and after
Apply a defined progress measurement method to a set of activities and verify the resulting percent-complete rollup against the schedule
Explain how out-of-sequence progress and retained logic settings change reported progress and float consumption
Forecast the finish date using both the SPI-based and the critical-path-based methods and explain the divergence
Your checkpoint
A revised risk-adjusted forecast package containing the mitigation plan, before/after simulation comparison, and a written forecast narrative
Schedule Change Control and Baseline Management & Schedule Quality, Validation, and Reporting
Establish a baseline, then process three change requests through a documented change control workflow including impact analysis and approval authority
Distinguish baseline revision from a simple progress update and state the criteria for each
Run a schedule quality check against a defined checklist (logic density, lags, constraints, float, hard-coded dates, open ends) and score the schedule
Correct each quality defect found and re-score to show improvement
Assemble a reporting package with the required views for a defined audience
Your checkpoint
A change log with three processed change requests, a before/after schedule quality scorecard, and a complete reporting package
Schedule Quality, Validation, and Reporting & Scheduling Fundamentals, Terminology, and Standards & Critical Path Method and Schedule Calculation
Complete a full-length timed practice exam and score it by domain to identify remaining weak areas
Re-derive critical path and float calculations under time pressure with no reference material
Review every missed item by domain and write the underlying rule you got wrong
Recite from memory the key definitions and formulas for all ten domains using your consolidated reference sheet
Confirm exam-day logistics, allowed reference materials, and calculator policy from the official handbook
Your checkpoint
A scored practice exam with a domain-level error analysis and a one-page final formula and definitions sheet