GA HVAC · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

HVAC System Design, Load Calculation, and Equipment Selection

  • Compute a full room-by-room heating and cooling load for a 2,000 sq ft single-family example using manual methods (U-values, infiltration, internal gains) without software assistance

  • Select matched condenser, evaporator coil, and air handler for that load and justify the selection with a written sensible/latent breakdown

  • Calculate required outdoor air and ventilation load for the example and state how it changes equipment capacity

  • List the code-required documentation and sizing tolerances an inspector would check on a submitted load calculation

Your checkpoint

A one-page load calculation worksheet with equipment selection summary and a written justification paragraph

Week 2

Refrigeration Cycle, Components, and Refrigerants

  • Draw and label the vapor-compression cycle with state points (pressure, temperature, phase) for a standard and a heat-pump reversing configuration

  • Identify the function and typical failure mode of each major component: compressor, metering device, condenser, evaporator, accumulator, receiver, filter-drier

  • Read a pressure-temperature chart to determine superheat and subcooling for three sample operating conditions

  • Classify refrigerants by safety group and state recovery, handling, and venting rules that apply to each class

Your checkpoint

A hand-drawn cycle diagram with three worked superheat/subcooling calculations showing correct answers

Week 3

Heating Equipment and Systems (Furnaces, Boilers, Heat Pumps)

  • Compare condensing furnace, condensing boiler, and air-source heat pump on efficiency ratings, venting, and application limits

  • Size a gas furnace and a hydronic boiler for the Week 1 load, including altitude and derate corrections

  • Trace the sequence of operation for a standing-pilot, intermittent-ignition, and condensing furnace from call for heat to shutdown

  • Explain balance point, auxiliary heat staging, and defrost cycle behavior for a heat pump installation

Your checkpoint

A comparison table of three heating technologies with sizing math, venting category, and sequence-of-operation steps

Week 4

Air Distribution, Ductwork, and Ventilation

  • Size supply and return ducts using the equal-friction and velocity methods for the Week 1 load, documenting friction rate and velocity limits

  • Compute external static pressure for a full duct system including filter, coil, and fittings, and compare to the air handler's rated ESP

  • Lay out a ventilation design that satisfies ASHRAE 62.2 whole-building and local exhaust requirements for the example house

  • Identify three common duct design defects (undersized return, excessive flex, unsealed joints) and quantify their effect on airflow

Your checkpoint

A duct layout sketch with a sizing table, ESP calculation, and ventilation compliance checklist

Week 5

Electrical Power, Motors, and HVAC Controls

  • Calculate full-load and branch-circuit ampacity for a compressor, blower motor, and electric heat strips using nameplate minimum circuit ampacity and maximum overcurrent protection

  • Select disconnect, overcurrent device, and conductor size for two sample condensing unit and air handler combinations

  • Wire and explain a basic low-voltage control circuit: thermostat, transformer, contactor, and fan relay

  • Describe how a variable-frequency drive changes motor speed and what electrical measurements confirm correct operation

Your checkpoint

A worked electrical load and conductor-sizing worksheet for two systems plus a labeled low-voltage wiring diagram

Week 6

Piping, Fittings, and Fuel Gas Systems & Installation, Start-up, and Commissioning

  • Size refrigerant and hydronic piping for a sample run, accounting for equivalent length of fittings and pressure drop limits

  • Size natural gas and propane piping by the longest-length method and verify appliance input ratings against available pressure

  • Write a start-up checklist sequence for a new split system from rough-in inspection through first call for cooling

  • Describe nitrogen purge, evacuation to a target micron level, and standing vacuum test acceptance criteria, and identify what invalidates each test

Your checkpoint

A complete commissioning packet: piping sizing sheet, evacuation log with micron targets, and a step-ordered start-up checklist

Week 7

Testing, Adjusting, and Balancing (TAB) & Maintenance, Troubleshooting, and Repair

  • Perform a TAB exercise on the example system: measure and record airflow at each outlet and adjust dampers to within plus or minus 10 percent of design

  • Calculate and record refrigerant charge adjustment using superheat or subcooling targets appropriate to the metering device type

  • Build a diagnostic flowchart for a low-capacity cooling complaint covering airflow, charge, and metering device branches

  • List a preventive maintenance schedule by frequency for residential and light commercial equipment, naming the specific measurement taken at each visit

Your checkpoint

A completed TAB balancing report with recorded measurements, plus a one-page troubleshooting flowchart

Week 8

Codes, Standards, Permits, and Jobsite Safety & HVAC System Design, Load Calculation, and Equipment Selection & Refrigeration Cycle, Components, and Refrigerants & Heating Equipment and Systems (Furnaces, Boilers, Heat Pumps) & Air Distribution, Ductwork, and Ventilation & Piping, Fittings, and Fuel Gas Systems & Electrical Power, Motors, and HVAC Controls & Installation, Start-up, and Commissioning & Testing, Adjusting, and Balancing (TAB) & Maintenance, Troubleshooting, and Repair

  • Summarize permit, inspection, and refrigerant-handling requirements that apply to a residential installation in your jurisdiction

  • Identify jobsite safety controls for lockout/tagout, confined space, and fall protection on an HVAC retrofit

  • Take two full-length timed practice exams and log every missed question by domain

  • Re-study the two lowest-scoring domains and rewrite the missed concepts in your own words

Your checkpoint

A scored practice-exam log with a domain-by-domain review sheet and a one-page code and safety quick-reference card

Milestones

Week 2: Can size equipment from a self-computed load and explain the refrigeration cycle with correct superheat and subcooling readings, without notes

Week 4: Load, heating, duct, and ventilation work is complete; score 70 percent or better on a self-made 25-question quiz over Domains 1 through 4

Week 6: Electrical sizing worksheet and commissioning packet are finished and correct; explain evacuation criteria and gas pipe sizing to a colleague or on paper without reference

Week 7: All measurements in the TAB report fall within plus or minus 10 percent of design, and the troubleshooting flowchart resolves three sample scenarios correctly

Week 8: Both timed practice exams completed with a recorded score, a written list of weak domains, and a study plan for any retake