GA Plumber study materials
GA Plumber study resources

GA Plumber study plan

GA Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Water Supply and Distribution, Sizing and Materials & Sanitary Drainage, Slope and Drainage Sizing

  • Trace the water service from meter to the farthest fixture on three practice layouts, labeling every segment by size and material

  • Compute supply fixture-unit loads for a one-bath and a two-bath dwelling using the code fixture-unit tables

  • Convert those same layouts to drainage fixture units and select branch and building-drain sizes

  • Verify required slope for every drain segment sized and mark each location where a cleanout is mandated

  • Reconcile any conflict between the fixture-unit total and the minimum pipe size rule for each line

Your checkpoint

A two-page sizing worksheet for both dwelling layouts showing SFU and DFU totals, chosen pipe sizes, slopes, and cleanout locations with a code table citation beside each number.

Week 2

Water Supply and Distribution, Sizing and Materials & Venting Systems and Vent Sizing

  • Select pipe and fitting materials for a residential system and defend each choice against the code's permitted-use and prohibited-use lists

  • Size a distribution main and branches for a 2.5-bath dwelling using demand load and allowable pressure loss

  • Lay out the vent system for a bathroom group, naming each vent by type and stating its connection point

  • Size each individual vent and the vent stack from the fixture-unit tables and check the result against minimum-size rules

  • Identify every place where a vent must increase in size or where a relief vent is triggered

Your checkpoint

A combined water-supply and vent overlay on a single-floor plan with every vent labeled and sized and a written justification paragraph for each material choice.

Week 3

Sanitary Drainage, Slope and Drainage Sizing & General Regulations, Administration and Code Scope

  • Match a described remodel scenario to the correct scope and administrative provisions, listing the permit, inspection, and testing steps in order

  • Size a horizontal building drain and a stack for a multi-fixture commercial restroom from the drainage fixture-unit tables

  • Determine cleanout size, spacing, and access clearance for each drain run sized, including a horizontal-to-vertical change

  • State the code basis for each decision you made by section topic, not by memory alone

  • List five common drainage-sizing errors and the correction for each

Your checkpoint

A scored 20-question self-test on drainage sizing and code scope, plus a written correction note for every missed item.

Week 4

Venting Systems and Vent Sizing & Plumbing Terminology, Symbols and Isometric Analysis

  • Read five isometric drawings and write out for each the fixture-unit count, pipe sizes, and direction of flow

  • Sketch your own riser isometric from a floor plan showing drainage, vent, and water lines in correct relationship

  • Distinguish wet vent, common vent, circuit vent, and stack vent on practice diagrams and name the fittings used at each junction

  • Diagnose three failed vent conditions (flat vent, crown-vent relief absence, vent below the trap weir) and state the correction

  • Decode the plumbing symbols and abbreviations on a legend and redraw a plan using them consistently

Your checkpoint

A hand-drawn isometric of a full bath plus kitchen group with every drain and vent labeled and sized, self-scored against a 15-point accuracy checklist.

Week 5

Fixtures, Fixture Fittings and Trim & Water Heaters, Temperature and Pressure Control

  • Specify supply connection size, drain outlet size, and trim requirements for water closets, lavatories, and bathtub/shower units

  • Measure and verify minimum fixture clearances and access for a small bathroom layout, flagging each violation found

  • Size a temperature-and-pressure relief valve and its discharge pipe for a given heater input rating and state the termination rules

  • Explain thermal expansion control, strapping/seismic restraint, and combustion air requirements for a gas-fired water heater

  • Compare tank and tankless installations for venting, clearance, and condensate handling

Your checkpoint

A fixture data sheet plus a water heater installation checklist covering relief valve sizing, discharge termination, strapping, and combustion air.

Week 6

Traps, Interceptors, Backflow Prevention and Cross-Connection Control & Storm Drainage, Special and Indirect Waste

  • Assign the correct trap type, seal depth, and size to every fixture in a practice building and flag each prohibited trap configuration

  • Choose an air gap, reduced-pressure principle device, or pressure vacuum breaker for four described cross-connection scenarios and state the required testing interval

  • Size an indirect waste receptor and set the air gap or air break distance for a commercial kitchen sink and dishwasher

  • Size roof drains, leaders, and the storm building drain for a given roof area and design rainfall rate

  • Separate which fixtures may and may not discharge to a storm or special waste system and justify each call

Your checkpoint

A cross-connection decision matrix (scenario to device to test interval) plus a one-page storm drainage sizing calculation sheet.

Week 7

General Regulations, Administration and Code Scope & Fuel Gas Piping and Appliance Connections

  • Build a timeline mapping each permit, inspection, and test requirement to the job stage where it applies

  • Size a gas piping system by the longest-length method for a range, water heater, and furnace, showing the demand in Btu/h at each appliance

  • State connector type, shutoff valve, sediment trap, and clearance requirements for each appliance sized

  • Verify combustion air and appliance venting provisions for a confined-space installation and note what must be added

  • Identify which code sections govern the plumbing-to-gas interface at a combination water heater

Your checkpoint

A gas piping isometric with pipe sizes, appliance demand loads, and a one-page permit and inspection timeline.

Week 8

Safety, Tools, Testing and Jobsite Practices & General Regulations, Administration and Code Scope & Water Supply and Distribution, Sizing and Materials & Sanitary Drainage, Slope and Drainage Sizing & Venting Systems and Vent Sizing

  • Assemble a personal tool and material checklist for rough-in and service tasks and use it on one mock job walk-through

  • Write out the hydrostatic and DWV air test procedures, including test pressures, hold times, and who witnesses the test

  • Complete two full-length timed practice exams and trace every missed question back to its code section

  • Re-drill the three weakest subtopics identified at week 4 until each is scored at 90% or better

  • Build a one-page formula and table index you can rebuild from memory on exam day

Your checkpoint

Two scored full-length practice exams plus an error log listing a code-section citation and a corrected rule for every miss.

Milestones

Week 4: Score 70% or better on a 40-question timed mix drawn from domains 3, 6, 7, 1, and 2, and submit a written list of the three weakest subtopics to target in weeks 5-8.

Week 6: Score 75% or better on a 30-question set on domains 8 and 9 plus a 10-question cumulative review; all cross-connection device choices correct.

Week 8: Score 80% or better on a full-length timed practice exam, with every missed question carrying a code citation and a corrected rule in the error log.