GA Plumber study plan
GA Plumber · Give each week a clear focus.
8 weeks · About 7 hours per week
Water Supply and Distribution, Sizing and Materials & Sanitary Drainage, Slope and Drainage Sizing
Trace the water service from meter to the farthest fixture on three practice layouts, labeling every segment by size and material
Compute supply fixture-unit loads for a one-bath and a two-bath dwelling using the code fixture-unit tables
Convert those same layouts to drainage fixture units and select branch and building-drain sizes
Verify required slope for every drain segment sized and mark each location where a cleanout is mandated
Reconcile any conflict between the fixture-unit total and the minimum pipe size rule for each line
Your checkpoint
A two-page sizing worksheet for both dwelling layouts showing SFU and DFU totals, chosen pipe sizes, slopes, and cleanout locations with a code table citation beside each number.
Water Supply and Distribution, Sizing and Materials & Venting Systems and Vent Sizing
Select pipe and fitting materials for a residential system and defend each choice against the code's permitted-use and prohibited-use lists
Size a distribution main and branches for a 2.5-bath dwelling using demand load and allowable pressure loss
Lay out the vent system for a bathroom group, naming each vent by type and stating its connection point
Size each individual vent and the vent stack from the fixture-unit tables and check the result against minimum-size rules
Identify every place where a vent must increase in size or where a relief vent is triggered
Your checkpoint
A combined water-supply and vent overlay on a single-floor plan with every vent labeled and sized and a written justification paragraph for each material choice.
Sanitary Drainage, Slope and Drainage Sizing & General Regulations, Administration and Code Scope
Match a described remodel scenario to the correct scope and administrative provisions, listing the permit, inspection, and testing steps in order
Size a horizontal building drain and a stack for a multi-fixture commercial restroom from the drainage fixture-unit tables
Determine cleanout size, spacing, and access clearance for each drain run sized, including a horizontal-to-vertical change
State the code basis for each decision you made by section topic, not by memory alone
List five common drainage-sizing errors and the correction for each
Your checkpoint
A scored 20-question self-test on drainage sizing and code scope, plus a written correction note for every missed item.
Venting Systems and Vent Sizing & Plumbing Terminology, Symbols and Isometric Analysis
Read five isometric drawings and write out for each the fixture-unit count, pipe sizes, and direction of flow
Sketch your own riser isometric from a floor plan showing drainage, vent, and water lines in correct relationship
Distinguish wet vent, common vent, circuit vent, and stack vent on practice diagrams and name the fittings used at each junction
Diagnose three failed vent conditions (flat vent, crown-vent relief absence, vent below the trap weir) and state the correction
Decode the plumbing symbols and abbreviations on a legend and redraw a plan using them consistently
Your checkpoint
A hand-drawn isometric of a full bath plus kitchen group with every drain and vent labeled and sized, self-scored against a 15-point accuracy checklist.
Fixtures, Fixture Fittings and Trim & Water Heaters, Temperature and Pressure Control
Specify supply connection size, drain outlet size, and trim requirements for water closets, lavatories, and bathtub/shower units
Measure and verify minimum fixture clearances and access for a small bathroom layout, flagging each violation found
Size a temperature-and-pressure relief valve and its discharge pipe for a given heater input rating and state the termination rules
Explain thermal expansion control, strapping/seismic restraint, and combustion air requirements for a gas-fired water heater
Compare tank and tankless installations for venting, clearance, and condensate handling
Your checkpoint
A fixture data sheet plus a water heater installation checklist covering relief valve sizing, discharge termination, strapping, and combustion air.
Traps, Interceptors, Backflow Prevention and Cross-Connection Control & Storm Drainage, Special and Indirect Waste
Assign the correct trap type, seal depth, and size to every fixture in a practice building and flag each prohibited trap configuration
Choose an air gap, reduced-pressure principle device, or pressure vacuum breaker for four described cross-connection scenarios and state the required testing interval
Size an indirect waste receptor and set the air gap or air break distance for a commercial kitchen sink and dishwasher
Size roof drains, leaders, and the storm building drain for a given roof area and design rainfall rate
Separate which fixtures may and may not discharge to a storm or special waste system and justify each call
Your checkpoint
A cross-connection decision matrix (scenario to device to test interval) plus a one-page storm drainage sizing calculation sheet.
General Regulations, Administration and Code Scope & Fuel Gas Piping and Appliance Connections
Build a timeline mapping each permit, inspection, and test requirement to the job stage where it applies
Size a gas piping system by the longest-length method for a range, water heater, and furnace, showing the demand in Btu/h at each appliance
State connector type, shutoff valve, sediment trap, and clearance requirements for each appliance sized
Verify combustion air and appliance venting provisions for a confined-space installation and note what must be added
Identify which code sections govern the plumbing-to-gas interface at a combination water heater
Your checkpoint
A gas piping isometric with pipe sizes, appliance demand loads, and a one-page permit and inspection timeline.
Safety, Tools, Testing and Jobsite Practices & General Regulations, Administration and Code Scope & Water Supply and Distribution, Sizing and Materials & Sanitary Drainage, Slope and Drainage Sizing & Venting Systems and Vent Sizing
Assemble a personal tool and material checklist for rough-in and service tasks and use it on one mock job walk-through
Write out the hydrostatic and DWV air test procedures, including test pressures, hold times, and who witnesses the test
Complete two full-length timed practice exams and trace every missed question back to its code section
Re-drill the three weakest subtopics identified at week 4 until each is scored at 90% or better
Build a one-page formula and table index you can rebuild from memory on exam day
Your checkpoint
Two scored full-length practice exams plus an error log listing a code-section citation and a corrected rule for every miss.
Milestones
Week 4: Score 70% or better on a 40-question timed mix drawn from domains 3, 6, 7, 1, and 2, and submit a written list of the three weakest subtopics to target in weeks 5-8.
Week 6: Score 75% or better on a 30-question set on domains 8 and 9 plus a 10-question cumulative review; all cross-connection device choices correct.
Week 8: Score 80% or better on a full-length timed practice exam, with every missed question carrying a code citation and a corrected rule in the error log.