Specific capacity
Pumping rate divided by drawdown, usually in gallons per minute per foot. It measures well efficiency and declines if the screen or formation plugs with fines.
Potentiometric surface
The imaginary level to which water in a confined aquifer would rise under its own pressure. Where it stands above land surface, a flowing artesian well results.
Cone of influence
The area around a pumping well where the water level is lowered. Its radius grows with pumping time and transmissivity and shrinks with higher storativity.
Fractured crystalline bedrock
Georgia Piedmont aquifer type in which water is stored in and transmitted through fractures and faults. A borehole that misses fractures will produce little or no water.
Gravel pack
A sorted sand or gravel envelope placed around a well screen, typically 3 to 5 inches thick, to stabilize the formation and improve yield while blocking fine sediment.
Sanitary seal
A watertight seal at the wellhead around the pump pipe and casing that prevents surface water, insects, and debris from entering the well.
Screen slot size
The width of the openings in a well screen, chosen to retain most of the formation sand. Typical Coastal Plain values are 0.010 to 0.040 inch.
Mud rotary drilling
A method that circulates bentonite-based fluid down the drill pipe and up the annulus to remove cuttings and hold the borehole wall open in unstable formations.
Cable tool drilling
A percussion method in which a heavy bit is repeatedly lifted and dropped to break rock; cuttings are removed with a bailer. It uses no drilling mud.
Lost circulation
The escape of drilling fluid into a permeable or fractured formation, so that returns to the surface stop. It is treated with cement, lost-circulation material, or air drilling.
Neat cement grout
A mixture of Portland cement and water at no more than about 6 gallons per 94-pound sack. Excess water causes shrinkage and cracking of the seal.
Tremie placement
Pumping grout down a pipe to the bottom of the annular space so the grout rises from below. This avoids bridging and voids that occur with free-fall placement.
Annular seal
The continuous grout column between the casing and the borehole wall, extending from the bottom of the casing to land surface, that blocks contamination movement.
Casing centralizer
A device attached to the casing to hold it centered in the borehole so the grout envelope is uniform and no unsealed channel forms along the wall.
Well development
Removal of drilling fluid, filter cake, and fine sediment from the formation around the screen, using surging, jetting, bailing, or air lifting until discharge runs clear.
Step-drawdown test
A pumping test run at three or more increasing rates to separate aquifer loss from well loss and to estimate well efficiency.
Well disinfection
Treatment of a new or repaired well with a chlorine solution of about 50 to 100 mg/L for at least 12 hours, followed by pumping to waste.
Constant-rate pumping test
A test that pumps a well at a steady rate, usually 24 hours or more, while measuring drawdown and recovery to estimate transmissivity and storativity.
Pressure tank precharge
The air pressure in a bladder tank, set about 2 psi below the pump cut-in pressure. Loss of precharge causes waterlogging and rapid pump cycling.
Jet pump suction limit
A shallow-well jet pump can lift water only about 25 feet at sea level because atmospheric pressure limits the suction. Deeper wells need a submersible or deep-well jet.
Pump operating point
The intersection of the pump performance curve and the system head curve. It defines the actual flow and head at which the pump will run.
Drawdown volume
The water a pressure tank can supply between cut-in and cut-out, roughly 25 percent of nominal tank volume for a bladder tank. It sets pump cycle length.
Well abandonment seal
A continuous grout or cement column filling the borehole from bottom to land surface, with the top 20 feet sealed in cement and the casing cut off.
Flowing artesian well
A well in which the confined aquifer pressure raises water above land surface. It must be controlled during drilling and sealed during abandonment to prevent cross-aquifer flow.
Abandonment record
A filed report giving the well location, depth, method, and sealing materials used. Georgia requires it to be submitted to the EPD after the work is complete.
Georgia EPD
The Environmental Protection Division of the Georgia Department of Natural Resources, which administers the state water well standards and licenses well contractors.
Well contractor license
A credential issued by the Georgia EPD that is required before a person may construct, repair, or abandon a water well in the state.
Well log filing
The driller's record of depth, casing, screen, grout, and water levels, which must be submitted to the Georgia EPD within the required period after completion.
Fifty-foot setback
The minimum separation in Georgia between a water well and a septic tank or sewage disposal area, intended to keep contamination from reaching the well.
Call 811 before drilling
The utility locate request made before excavation. It marks buried gas, electric, and communications lines and prevents struck-line injuries on the drill site.
Hydrogen sulfide hazard
A toxic gas found in some wells and pits that deadens smell above low concentrations and is lethal at about 100 ppm. Atmospheric testing is required before entry.
Drilling fluid containment
Use of a pit or tank to hold mud and cuttings so they are not released to streams or wetlands. Disposal must follow permit requirements.