GA Well Driller study plan
GA Well Driller · Give each week a clear focus.
8 weeks · About 6 hours per week
Well Design and Construction
List the five minimum well-construction elements required by the Georgia Water Well Standards (casing, grout, screen, annular seal, cap) and state the purpose of each.
Diagram a typical residential well showing casing diameter, grout depth, screen interval, and pitless adapter placement, labeling all dimensions.
Compare three casing materials (steel, PVC, and stainless steel) on strength, corrosion resistance, and appropriate use cases.
Calculate the annular space volume for a 6-inch casing inside a 10-inch borehole to 100 feet, and convert that volume to gallons of grout.
Your checkpoint
A one-page annotated well cross-section diagram with a 10-question self-quiz and answer key.
Well Design and Construction & Grouting, Sealing, and Annular Space Integrity
Explain the purpose of grouting and describe the three common grout types (neat cement, bentonite, cement-bentonite) with their mixing ratios and set times.
Describe the correct method for placing grout (tremie pipe from bottom up) and identify three common grouting failures and their consequences.
Outline the steps for setting a surface casing and sealing the annular space to the required depth in Georgia.
Calculate the number of sacks of cement needed for a 50-foot annulus of 8-inch hole with 5-inch casing, using a yield of 1.15 cubic feet per sack.
Your checkpoint
A written procedure for grouting a 6-inch PVC well to 80 feet, including volume calculations and a quality-control checklist.
Well Siting, Geology, and Hydrogeology
Define the water table, confined aquifer, and artesian well, and sketch each in a simple hydrogeologic cross-section.
Interpret a pump test (drawdown vs. time) to estimate transmissivity and specific capacity using the Theis or Cooper-Jacob method on a provided dataset.
Identify the major physiographic provinces of Georgia (Coastal Plain, Piedmont, Blue Ridge, Valley and Ridge, Appalachian Plateau) and list typical well yields and depths for each.
Explain how to site a well using a topographic map and existing well records, and list three setback requirements from the Georgia rules.
Your checkpoint
A two-page site-assessment report for a hypothetical 5-acre property, including a recommended well location, target depth, and expected yield.
Drilling Methods, Equipment, and Operations
Compare rotary, cable-tool, and air-percussion drilling methods on penetration rate, sample quality, and formation suitability.
Describe the correct procedure for setting up a drilling rig, including leveling, mast erection, and conductor pipe installation.
List the steps to collect and log drill cuttings and core samples, and record them on a standard lithology log.
Identify three common drilling problems (lost circulation, stuck pipe, hole collapse) and state a remedy for each.
Your checkpoint
A completed lithology log for a 120-foot test hole with a narrative of the drilling methods used and problems encountered.
Well Development, Testing, and Disinfection & Pumps, Water Systems, and Pressure Equipment
Describe three well-development methods (surge block, air-lift, jetting) and state when each is appropriate.
Outline a 24-hour pump test procedure, including drawdown and recovery measurements, and calculate specific capacity from the data.
Explain the disinfection procedure using chlorine, including concentration, contact time, and proper disposal of chlorinated water.
Identify the main components of a submersible pump system (pump, motor, drop pipe, torque arrestor, check valve, pressure tank) and state the function of each.
Calculate the pump setting depth for a well with a static water level of 40 feet, a drawdown of 15 feet, and a desired 20-foot safety margin.
Your checkpoint
A completed well-development and test report for a 100-foot well, including development method, test data, and disinfection record.
Georgia Well Construction Rules and Regulatory Compliance & Abandonment and Decommissioning of Wells
Summarize the Georgia Water Well Standards, including licensing, permitting, and reporting requirements for new and abandoned wells.
List the required contents of a well completion report (driller's log) and the deadline for submission to the state.
Describe the proper abandonment procedure for a well, including removal of obstructions, filling with grout, and capping.
Explain the difference between temporary and permanent abandonment and the documentation required for each.
Your checkpoint
A mock well completion report and an abandonment plan for a 150-foot well, both checked against a regulatory checklist.
Georgia Well Construction Rules and Regulatory Compliance & Safety, Environmental Protection, and Site Management
Identify the key safety hazards on a drilling site (rotating equipment, electrical, confined space, and chemical) and state a control for each.
Describe spill prevention and containment measures for drilling fluids and fuels, and outline a spill response plan.
Explain the setback and separation distances required from septic systems, property lines, and surface water in Georgia.
Outline the site restoration steps after well completion, including grading, seeding, and removal of waste.
Your checkpoint
A site-specific safety and environmental plan for a drilling project, including a spill kit inventory and an inspection checklist.
Well Design and Construction & Grouting, Sealing, and Annular Space Integrity & Well Development, Testing, and Disinfection & Pumps, Water Systems, and Pressure Equipment & Abandonment and Decommissioning of Wells & Georgia Well Construction Rules and Regulatory Compliance & Safety, Environmental Protection, and Site Management
Complete a 50-question timed practice exam covering all domains, with a target score of 80% or higher.
Review all missed questions and create a one-page summary sheet of weak areas with corrective actions.
Re-calculate grout volumes, pump setting depths, and specific capacity from memory to verify formula retention.
Recite the key Georgia regulatory numbers (setbacks, grout depth, disinfection concentration) without notes.
Your checkpoint
A scored practice exam with a written remediation plan for any domain scoring below 70%.
Milestones
Week 2: Can calculate grout volume and sack count for a given well geometry without reference materials.
Week 4: Can sketch and explain a complete well system from screen to pressure tank, and pass a 20-question quiz on drilling methods with 80% or better.
Week 6: Can list the required elements of a well completion report and an abandonment plan from memory.
Week 8: Score 80% or higher on the final 50-question practice exam, with no domain below 70%.