gh-ec-electrical-wiring-domestic study plan
gh-ec-electrical-wiring-domestic · Give each week a clear focus.
8 weeks · About 7 hours per week
Wiring methods and materials (cables, raceways, boxes, fittings) & General electrical knowledge, definitions, and code administration
Build a one-page reference sheet mapping each common residential wiring method (NM-B, UF, AC/MC, EMT, PVC, LFMC) to its permitted uses, prohibited locations, and support/fasten spacing rules
Classify 25 cable and raceway scenarios as permitted or prohibited and write the governing rule next to each answer
Define the core Article 100 terms you will reuse all exam (ampacity, branch circuit, feeder, service, outlet, device, receptacle, bonding jumper) in your own words
List the box-fill steps in order and compute fill for five single-gang and two multi-gang box layouts with mixed conductors, devices, and grounds
Explain the difference between a code rule, an informational note, and a manufacturer instruction, and note which one governs an inspection dispute
Your checkpoint
A two-page wiring-methods and box-fill cheat sheet, plus a scored 20-question self-quiz log showing at least 80% correct
Branch circuits, feeders, and service calculations & Grounding, bonding, and overcurrent protection
Compute a single-family dwelling service load using the standard method: general lighting, small-appliance and laundry circuits, range, dryer, water heater, and HVAC, then compare to the optional method
Size service conductors, the main breaker, and the grounding electrode conductor from your computed load and state the applicable table for each
Calculate conductor ampacity adjustments for ambient temperature and for more than three current-carrying conductors in a raceway
Distinguish grounding versus bonding for five residential scenarios and identify the correct conductor and termination point for each
Select the correct overcurrent device type and rating for five branch circuits, including motor and AC loads, and justify the choice
Your checkpoint
A completed load calculation worksheet for a sample 2,400 sq ft dwelling, showing both standard and optional method results within 5% of each other
Devices, switches, receptacles, and outlet/lighting installations & Special occupancies and residential-specific requirements (dwellings, kitchens, bathrooms, garages, pools)
Lay out receptacle spacing for a full dwelling floor plan and mark every required location, including wall-space measurement rules, islands, countertops, and bathroom/garage/outdoor GFCI requirements
Determine switch and lighting outlet requirements room by room, including stairways, hallways, and habitable-room wall-switch rules
Specify device ratings, tamper-resistant and weather-resistant requirements, and box mounting heights for kitchens, bathrooms, and laundry areas
Apply the pool, spa, and hot-tub rules: equipotential bonding, receptacle distance, and GFCI coverage, and write a one-paragraph summary of each
Identify the special rules for garages, accessory buildings, and unfinished basements, and list what changes when the space is converted to habitable use
Your checkpoint
An annotated floor plan of a three-bedroom house marking every required receptacle, switch, lighting outlet, and GFCI/AFCI-protected circuit, with a legend citing the rule for each symbol
Motors, appliances, HVAC equipment, and dedicated circuits & Branch circuits, feeders, and service calculations
Size branch-circuit conductors and overcurrent protection for a central AC condenser, air handler, and electric water heater using nameplate data and the motor/appliance articles
Compute minimum circuit ampacity and maximum overcurrent protection from a sample nameplate, and explain why the breaker may exceed the conductor ampacity
Determine disconnect requirements and locations for HVAC equipment and appliances, including the within-sight rule
Size a dedicated 240V circuit for a range or dryer using the demand factors that apply to household cooking and laundry appliances
Trace the rules for flexible cord and plug connection versus hard-wiring for dishwashers, disposals, and ranges
Your checkpoint
A motor and appliance schedule for a sample house listing each unit's nameplate values, conductor size, breaker size, disconnect type, and the rule cited for each line
Low-voltage, communications, and signaling systems & Safety, inspection, and code-compliance practices
Separate power-limited low-voltage wiring from line-voltage wiring and state the separation, sleeve, and box requirements for each
Describe installation rules for communications, coaxial, and structured cabling, including bend radius, support, and grounding of the incoming service
Explain smoke and carbon monoxide alarm placement, interconnection, and power-source requirements for a dwelling
Build a pre-cover inspection checklist covering framing-stage items an inspector typically looks at before drywall
Write a correction-notice response workflow: read the citation, locate the rule, correct the work, and document the fix for re-inspection
Your checkpoint
A one-page pre-inspection checklist with at least 15 line items, each tied to a specific code or licensing requirement
Georgia state licensing laws, rules, and business/regulatory requirements & General electrical knowledge, definitions, and code administration
Summarize the Georgia licensing structure for electrical contractors, journeyman, and apprentice classifications, including who may pull permits and supervise work
Outline continuing-education, license renewal, and penalty provisions and note where the official state board materials live so you can verify current numbers
Explain the permit, inspection, and certificate-of-occupancy sequence for a residential job from application to final
Describe business requirements affecting a small electrical contractor: contract terms, lien and notice basics, insurance, and recordkeeping
Practice answering code-administration questions about who enforces the code, local amendments, and the appeals process
Your checkpoint
A Georgia regulatory one-pager listing license types, renewal and CE obligations, permit sequence, and at least three official sources with URLs, flagging any figure you could not verify
Wiring methods and materials (cables, raceways, boxes, fittings) & Grounding, bonding, and overcurrent protection & Devices, switches, receptacles, and outlet/lighting installations
Re-work every missed question from weeks 1-6 and write the correct rule beside each, grouping misses by domain to expose weak areas
Redo box fill, conductor ampacity adjustment, and grounding/bonding problems under a 90-second-per-question timer
Rehearse the top ten installation mistakes that generate correction notices and state the correct practice for each
Build a personal formula and table index so you can locate ampacity, fill, and load-calculation data quickly during the open-book exam
Your checkpoint
A weak-area log showing each missed item, the corrected answer, the rule cited, and a re-test score of at least 85% on the same items
Branch circuits, feeders, and service calculations & Special occupancies and residential-specific requirements (dwellings, kitchens, bathrooms, garages, pools) & Motors, appliances, HVAC equipment, and dedicated circuits & Georgia state licensing laws, rules, and business/regulatory requirements
Complete two full-length timed practice exams under exam conditions and record domain-by-domain scores
Review only the two lowest-scoring domains from those exams and close each gap with targeted drilling
Recite from memory the load-calculation steps, the GFCI/AFCI location list, and the Georgia license and permit essentials
Finalize exam-day logistics: approved reference materials, tabbing strategy, time allocation per question, and a plan for flagged questions
Your checkpoint
Two completed timed practice exams with a score summary by domain and a written exam-day plan
Milestones
Week 2: Can complete a full dwelling service calculation with conductor and breaker sizing in under 25 minutes with no reference errors
Week 4: Scores at least 75% on a 30-question mixed set drawn from wiring methods, calculations, grounding, and devices
Week 6: Can state Georgia license types, renewal/CE obligations, and the permit-to-final inspection sequence without notes, and has verified each figure against an official source
Week 8: Scores at least 80% overall on both timed practice exams with no single domain below 70%