ICAG Paper 1.4 Cost & Management Accounting study materials
ICAG Paper 1.4 Cost & Management Accounting study resources

ICAG Paper 1.4 Cost & Management Accounting key terms

ICAG Paper 1.4 Cost & Management Accounting · Get comfortable with the vocabulary.

Cost object

Any item, activity, product, customer or department for which costs are separately measured. It defines the boundary of the cost collection exercise and determines which costs are relevant to the analysis being performed.

Related: Direct cost, Indirect cost, Cost centre
Direct cost

A cost that can be traced to a specific cost object in an economically feasible way, such as raw material in a product or a worker's wages on a specific job.

Related: Indirect cost, Cost object, Prime cost
Indirect cost

A cost that cannot be traced economically to a specific cost object and must therefore be apportioned or absorbed, such as factory rent, supervision salaries or machine depreciation.

Related: Direct cost, Overhead absorption rate, Cost apportionment
Prime cost

The sum of direct material, direct labour and direct expense for a cost unit. It excludes all production overhead and is the first subtotal in a traditional cost statement.

Related: Direct cost, Conversion cost
Conversion cost

The total of direct labour plus production overhead incurred to convert raw materials into finished goods. It is used where material cost is a small or separately controlled element.

Related: Prime cost, Overhead absorption rate
Cost centre

A production or service location, function, activity or item of equipment for which costs are accumulated and against which they can be controlled by a responsible manager.

Related: Cost object, Responsibility accounting
Cost apportionment

The fair division of an indirect cost among several cost centres on a logical basis, such as floor area for rent or machine hours for power, before those costs are absorbed into products.

Related: Cost allocation, Overhead absorption rate, Reciprocal servicing
Cost allocation

The assignment of an entire indirect cost to a single cost centre where the whole amount is attributable to that centre, for example a department's own supervisor's salary.

Related: Cost apportionment, Cost centre
Overhead absorption rate

A predetermined rate, usually per labour hour, machine hour or as a percentage of direct labour cost, used to charge production overhead into cost units during a period.

Related: Over-absorption, Predetermined overhead rate, Indirect cost
Over-absorption

The amount by which overhead charged into production using a predetermined rate exceeds the overhead actually incurred. It is written off or credited to the costing profit and loss account at period end.

Related: Under-absorption, Overhead absorption rate
Under-absorption

The shortfall arising when overhead absorbed into production using a predetermined rate is less than the overhead actually incurred for the period, increasing the cost of sales.

Related: Over-absorption, Overhead absorption rate
Reciprocal servicing

The situation where two or more service cost centres provide services to each other as well as to production departments, so their costs must be reapportioned by repeated distribution or algebraic methods.

Related: Cost apportionment, Cost centre
Job costing

A costing method applied where each cost unit is a separately identifiable, customer-specific job, so costs are collected against a unique job number and profit is measured job by job.

Related: Batch costing, Contract costing, Absorption costing
Batch costing

A costing method for identical or near-identical units produced in groups, where the batch is the cost unit and unit cost equals total batch cost divided by the number of good units in the batch.

Related: Job costing, Process costing
Contract costing

A form of job costing used for large, long-duration, site-based projects, recognising revenue and profit by reference to the stage of completion and using work certified and retention money.

Related: Work certified, Retention money, Percentage of completion
Work certified

The value of work completed on a contract and approved by the client's architect or engineer, which establishes the amount the contractor may invoice at that stage.

Related: Contract costing, Retention money
Retention money

A percentage of certified contract value withheld by the client until the contract is completed or a defects liability period expires, protecting the client against faulty work.

Related: Contract costing, Work certified
Percentage of completion

The proportion of total contract work finished at a reporting date, commonly measured by cost incurred to date over total estimated cost, used to recognise revenue and profit.

Related: Contract costing, Work certified
Normal loss

The unavoidable, expected loss of input in a process, which carries no scrap value in the cost of good output and is absorbed by the units that remain.

Related: Abnormal loss, Abnormal gain, Equivalent units
Abnormal loss

Loss in a process that exceeds the normal level and is therefore treated as an unexpected cost, valued at full cost and written off to the profit and loss account.

Related: Normal loss, Abnormal gain
Abnormal gain

The excess of good output over the expected level after allowing for normal loss, valued at full cost and credited in the profit and loss account as a reduction in cost.

Related: Normal loss, Abnormal loss
Equivalent units

A measure converting partly finished work into the number of complete units it represents, enabling consistent costing of opening and closing work in progress in a process.

Related: Normal loss, Process costing
Marginal costing

A costing approach in which only variable production costs are charged to units, with fixed costs treated as period costs. It highlights contribution and supports short-term decisions.

Related: Contribution, Absorption costing, Break-even point
Absorption costing

A costing approach in which both variable and fixed production costs are charged to units, so inventory carries a share of fixed overhead and profit varies with production volume.

Related: Marginal costing, Overhead absorption rate, Over-absorption
Contribution

Sales revenue less all variable costs. It measures the amount each unit or product line contributes towards covering fixed costs and then generating profit.

Related: Marginal costing, Break-even point, Margin of safety
Break-even point

The level of activity at which total contribution equals total fixed costs and profit is zero, expressible in units, revenue or as a percentage of capacity.

Related: Contribution, Margin of safety, Cost-volume-profit analysis
Margin of safety

The amount by which budgeted or actual sales exceed break-even sales, indicating how far sales may fall before a loss arises. It may be expressed in units, revenue or percentage.

Related: Break-even point, Contribution, Cost-volume-profit analysis
Cost-volume-profit analysis

The study of how changes in volume, selling price, variable cost and fixed cost affect profit, often using break-even charts and contribution-based calculations to support planning decisions.

Related: Break-even point, Contribution, Margin of safety
Relevant cost

A future, incremental cash flow that differs between the alternatives being considered. Costs that are sunk, committed or unavoidable are excluded from the decision.

Related: Opportunity cost, Sunk cost, Avoidable cost
Opportunity cost

The contribution or benefit forgone by using a scarce resource in one way rather than its next best alternative. It is included in relevant costing even though no cash is paid.

Related: Relevant cost, Limiting factor
Sunk cost

A cost already incurred, or a commitment made in the past, that cannot be changed by any current decision and is therefore irrelevant to it.

Related: Relevant cost, Opportunity cost
Limiting factor

The scarce resource, such as a machine, skilled labour or material, that restricts output. Ranking products by contribution per unit of the limiting factor maximises total contribution.

Related: Opportunity cost, Contribution, Throughput accounting
Standard cost

A predetermined estimate of the cost of a unit, built from expected quantities and prices for materials, labour and overhead, used as a benchmark for control and valuation.

Related: Variance analysis, Ideal standard, Attainable standard
Variance analysis

The process of comparing actual performance with standard or budgeted performance, breaking the difference into causes such as price, usage, rate and efficiency, and reporting them for management action.

Related: Standard cost, Flexible budget, Operating statement
Flexible budget

A budget restated for the actual level of activity achieved, so that fixed and variable costs are compared with actuals on a like-for-like basis for meaningful variance analysis.

Related: Variance analysis, Budgetary control
Budgetary control

The process of setting budgets, communicating them, measuring actual performance against them and taking corrective action where significant variances arise.

Related: Flexible budget, Variance analysis, Responsibility accounting
Responsibility accounting

A system that assigns revenues and costs to the managers accountable for them, so that performance is judged only on items within that manager's control.

Related: Cost centre, Budgetary control, Controllable cost
Controllable cost

A cost that a specific manager can influence or authorise within a given period, and which is therefore fair to include in that manager's performance report.

Related: Responsibility accounting, Budgetary control
Return on investment

A divisional performance measure calculated as divisional operating profit divided by divisional invested capital, showing profit generated per unit of capital employed.

Related: Residual income, Investment centre
Residual income

Divisional profit less a notional interest charge on the division's invested capital. Unlike return on investment it encourages managers to accept projects earning above the cost of capital.

Related: Return on investment, Investment centre