ICAG Paper 1.4 Cost & Management Accounting study materials
ICAG Paper 1.4 Cost & Management Accounting study resources

ICAG Paper 1.4 Cost & Management Accounting study plan

ICAG Paper 1.4 Cost & Management Accounting · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Cost accounting fundamentals and cost classification

  • Classify costs into direct/indirect, fixed/variable/semi-variable, product/period, and relevant/irrelevant using at least 40 short scenarios.

  • Compute prime cost, overhead absorption rates, and cost of goods sold from raw data for 5 different manufacturing or service settings.

  • Explain the purpose and limitations of cost accounting in management decision making in a 150-word written summary.

Your checkpoint

A one-page cost classification cheat sheet plus 10 solved practice problems with full workings.

Week 2

Cost accounting fundamentals and cost classification & Costing methods and techniques (job, batch, contract, process, standard, marginal and absorption costing)

  • Apply job and batch costing to prepare job cost sheets and compute unit costs for 3 batch sizes.

  • Distinguish contract costing from job costing and calculate contract revenue, costs, and profit using the percentage-of-completion method for 2 contracts.

  • Reconcile process costing with normal/abnormal losses and gains using FIFO and weighted-average methods for 2 process sequences.

Your checkpoint

A side-by-side comparison table of job, batch, and contract costing with worked numerical examples for each.

Week 3

Costing methods and techniques (job, batch, contract, process, standard, marginal and absorption costing)

  • Prepare full absorption and marginal costing income statements for the same data and reconcile the difference in profit.

  • Compute and interpret overhead variances (expenditure, efficiency, capacity) and explain their causes.

  • Set standard costs for materials, labour, and overhead and calculate basic variances for a simple product.

Your checkpoint

A spreadsheet model that converts absorption profit to marginal profit and lists all variances with formulas.

Week 4

Budgeting, budgetary control and standard costing with variance analysis

  • Construct a cash budget, production budget, and purchases budget from a set of forecast sales and inventory policies.

  • Analyse a budgetary control report and identify corrective actions for three significant variances.

  • Explain the behavioural and motivational aspects of budgeting in a 200-word memo.

Your checkpoint

A complete master budget pack for a fictional 6-month period, including all supporting schedules and a variance commentary.

Week 5

Budgeting, budgetary control and standard costing with variance analysis

  • Calculate and interpret all labour, material, and sales variances, including mix and yield variances.

  • Prepare a standard costing operating statement that reconciles budgeted profit to actual profit.

  • Evaluate the limitations of standard costing in modern manufacturing environments.

Your checkpoint

A variance analysis report with a full operating statement and a 150-word critique of standard costing.

Week 6

Decision making, performance measurement and management accounting control systems

  • Apply relevant costing to make or buy, accept or reject special order, and discontinue product decisions using 6 case scenarios.

  • Use limiting factor analysis and linear programming (graphical method) to determine an optimal product mix.

  • Evaluate pricing decisions using cost-plus, marginal cost, and market-based approaches.

Your checkpoint

A decision-making case portfolio containing 5 solved scenarios with recommendations and supporting calculations.

Week 7

Decision making, performance measurement and management accounting control systems

  • Compute and interpret return on investment, residual income, and economic value added for two divisions.

  • Design a balanced scorecard with objectives, measures, targets, and initiatives for a service company.

  • Identify and explain dysfunctional behaviour arising from performance measurement systems in a 200-word analysis.

Your checkpoint

A divisional performance report with ROI/RI/EVA calculations and a balanced scorecard for a chosen company.

Week 8

Cost accounting fundamentals and cost classification & Costing methods and techniques (job, batch, contract, process, standard, marginal and absorption costing) & Budgeting, budgetary control and standard costing with variance analysis & Decision making, performance measurement and management accounting control systems

  • Complete a timed 50-question mock exam covering all domains and score at least 70%.

  • Review all incorrect mock answers and produce a personalised list of weak topics with corrective actions.

  • Summarise key formulas and concepts from all domains into a two-page revision sheet.

Your checkpoint

Mock exam score report plus a two-page revision sheet and a 1-week action plan for final review.

Milestones

Week 2: Achieve at least 80% on a 20-question quiz covering cost classification and job/batch/contract costing.

Week 4: Produce a complete master budget with all supporting schedules and explain three variances correctly.

Week 6: Correctly solve 4 out of 5 relevant costing decision scenarios without referring to notes.

Week 8: Score 70% or higher on the full mock exam and complete the personalised revision sheet.