ICAG Paper 1.4 Cost & Management Accounting study materials
ICAG Paper 1.4 Cost & Management Accounting study resources

ICAG Paper 1.4 Cost & Management Accounting: Budgeting, budgetary control and standard costing with variance analysis

ICAG Paper 1.4 Cost & Management Accounting · Work through your exam, one topic at a time.

All guide sections

Budgeting, budgetary control and standard costing with variance analysis

Domain 3 tests budget construction, budgetary control and the calculation and interpretation of standard costing variances. Expect functional budget schedules, a cash budget, flexible budget comparisons and variance reconciliations.

Budgeting framework

  • The principal budget factor (limiting factor) sets the order of budget preparation; it is usually sales demand.
  • A budget manual and budget committee coordinate preparation. Budgets may be incremental, zero-based or rolling.
  • Production budget = sales units + closing inventory - opening inventory.
  • Material usage budget = production × standard usage; material purchases = usage + closing inventory - opening inventory.
  • The cash budget records receipts and payments by timing; depreciation is excluded. The master budget comprises the budgeted income statement, statement of financial position and cash budget.

Budgetary control

  • A fixed budget is not comparable with actual output; flex the budget to actual output before calculating expenditure variances.
  • Variances are adverse or favourable; investigate by exception, weighing the cost of investigation against the benefit.
  • Participative budgeting can reduce slack but takes longer; imposed budgets are quicker but may demotivate.

Standard costing variances

  • Material price = (standard price - actual price) × actual quantity. Material usage = (standard quantity for actual output - actual quantity) × standard price.
  • Labour rate = (standard rate - actual rate) × actual hours. Labour efficiency = (standard hours for actual output - actual hours) × standard rate.
  • Fixed overhead expenditure = budgeted fixed overhead - actual fixed overhead. Fixed overhead volume = (actual output - budgeted output) × standard fixed overhead per unit.
  • Sales price and sales volume variances complete the operating statement.

Worked example

The standard is 3 kg at GHS4 per kg, i.e. GHS12 per unit. Output is 1,000 units. Purchases and usage are 3,200 kg costing GHS12,160, i.e. GHS3.80 per kg. Material price variance = (4.00 - 3.80) × 3,200 = GHS640 favourable. Material usage variance = (3,000 - 3,200) × GHS4 = GHS800 adverse. Total material variance = GHS160 adverse. Check: standard cost 1,000 × GHS12 = GHS12,000; actual cost GHS12,160; adverse GHS160. The favourable price was more than offset by excess usage.

Traps

  • Using actual quantity for the usage variance or standard quantity for the price variance.
  • Flexing sales but not costs.
  • Adding opening inventory in the production or purchases budget.
  • Reversing the fixed overhead volume variance sign.
  • Treating every favourable variance as good; cheap material may cause adverse usage.
  • Omitting opening and closing inventory from purchase budgets.