REAC Qualifying Exam cheat sheet
REAC Qualifying Exam · Keep the key ideas within reach.
Regulatory and Legal Framework
Legislation sets duties; regulations and guidelines fill in technical detail. A duty of care exists even where a specific limit is absent.
Standard hierarchy: statute (Act) > regulation > code of practice > guidance. Lower tiers are persuasive, not automatically enforceable.
Polluter-pays principle: the party who causes contamination bears investigation and remediation cost, regardless of land ownership history.
Cradle-to-grave responsibility follows waste from generation to final disposal; the generator retains liability if downstream handling fails.
Environmental permitting typically requires: operator identity, site description, emission/inventory data, monitoring plan, and BAT assessment.
Best Available Techniques (BAT): the most effective and advanced stage of development, considering cost-benefit; not simply the newest technology.
Statutory nuisance and harm thresholds often differ from permit limits; compliance with a permit does not automatically bar nuisance claims.
Record-retention periods are set by regulation, not by convenience; retain permits, monitoring records, and calibration logs for the stated period.
Notifiable incidents usually carry a strict clock (often 24 hours for verbal and 5-10 working days for written reports); check the applicable rule.
Environmental Assessment Principles
Risk = hazard (intrinsic property) x exposure (likelihood and magnitude of contact). Removing either term removes the risk.
Source-pathway-receptor model: all three must be linked for a risk to exist. Breaking any link is a valid remediation strategy.
Screening assessment compares site concentrations to generic assessment criteria; exceedance triggers site-specific (detailed) assessment.
Exposure routes to consider: ingestion, dermal contact, inhalation of dust/vapour, and leaching to groundwater.
Conceptual site model (CSM) documents sources, pathways, receptors, and the exposure linkages assessed; it drives the sampling plan.
Dose-response and toxicity reference values (TRVs) convert exposure into a risk estimate; uncertainty factors account for extrapolation.
ALARP: risk reduced as low as reasonably practicable; demonstration requires cost-benefit justification, not zero risk.
Environmental impact assessment stages: screening, scoping, baseline, impact prediction, mitigation, reporting, and post-decision monitoring.
Cumulative and transboundary impacts must be considered, not just the single-project footprint.
Sampling, Measurement, and Monitoring
Representativeness beats precision: a precise analysis of a non-representative sample is still wrong.
Sampling plan elements: objective, analytes, locations, depth, frequency, method, containers, preservation, holding times, QA/QC.
Composite samples average conditions over time/space and hide peaks; discrete (grab) samples capture variability and spikes.
Holding times and preservation (pH, temperature, headspace) are analyte-specific; exceedance invalidates the result.
Sample containers: amber glass for organics, plastic for metals, headspace-free for volatiles; never reuse without decontamination.
Field blanks detect contamination introduced during sampling; trip blanks detect transport contamination for volatiles.
Monitoring design: baseline before impact, adequate control/reference locations, and sufficient replicates to detect the target effect size.
Continuous monitoring gives temporal resolution but needs calibration checks and data-validation rules; spot sampling gives spatial coverage.
Chain-of-custody records must be unbroken from collection to laboratory receipt, with dates, times, and signatures.
Data Quality and Quality Assurance
Data quality objectives (DQOs): define the decision, the acceptable error rate, and the data needed before sampling begins.
Precision = reproducibility (duplicates, RPD); accuracy = closeness to true value (certified reference materials, spikes).
Relative percent difference: RPD = |a - b| / ((a + b)/2) x 100; compare against the method's acceptance criterion.
Recovery: %R = (measured / expected) x 100; spike and CRM recoveries demonstrate bias control.
Detection limit: LOD is the level distinguishable from zero; LOQ is the level quantifiable with acceptable precision.
Laboratory QA/QC: method blanks, matrix spikes, matrix spike duplicates, calibration verification, and control charts.
Data validation tiers (e.g., screening vs. definitive) determine usability; report qualified data rather than deleting it.
Measurement uncertainty must be reported with results; a result without uncertainty is incomplete for decision-making.
Accreditation (ISO/IEC 17025) confirms competence, not that a specific result is correct; method validation still applies.
Environmental Reporting and Documentation
Reports must state: purpose, scope, methods, results, limitations, and conclusions; readers must be able to reproduce the work.
Units and reference conditions matter: report temperature, pressure, dry/wet basis, and detection limits alongside results.
Exceedance reporting: identify the limit, the measured value, the duration, and the corrective action taken.
Data tables should carry qualifiers (e.g., J = estimated, U = non-detect) and a legend explaining each.
Chain-of-custody, calibration records, and raw data are primary evidence; the report is a summary and must trace back to them.
Version control: date, author, reviewer, and approval signature on each revision; superseded versions clearly marked.
Confidentiality and data protection apply to personal and commercially sensitive information; redact consistently.
Cross-media consistency: air, water, and waste figures should reconcile with the same underlying inventory data.
Professional Ethics and Compliance
Report results as measured; never suppress, alter, or selectively present data to fit a desired outcome.
Conflicts of interest must be disclosed in writing and managed; undisclosed conflicts undermine the whole assessment.
Competence boundary: decline or qualify work outside your expertise rather than overstating capability.
Confidentiality persists after the engagement ends; do not reuse client data without permission.
Whistleblowing: internal escalation first, then the regulator; document the concern and the response.
Independence: an assessor should not audit their own work; separate preparation from verification.
Regulatory non-compliance must be reported to the client and, where legally required, to the authority; concealment is itself an offence.
Ethical obligations can exceed legal minimums; professional codes bind members beyond statutory requirements.