Week 1

Codes and Standards

  • Map the structure of NFPA 13 (chapters on administration, occupancy classification, design criteria, water supply, sprinkler positioning, pipe and fittings, plans and calculations, acceptance testing) and build a one-page chapter index in your own words.

  • Read the scope, purpose, and applicability sections of NFPA 13 plus the referenced-installation-standard logic, and write a decision tree that tells you which standard governs a given occupancy.

  • List the definitions that change design outcomes (listed, approved, hydraulically calculated, design area, sprinkler system types) and rewrite each in plain language with a one-line example.

  • Compare NFPA 13 with the residential and light-hazard companion standards at the level of when each applies, and record the three boundary conditions that most often trip candidates.

  • Identify the local code adoption path (model code edition, local amendments, authority having jurisdiction) and note where amendments most commonly override the national standard.

Your checkpoint

A one-page NFPA 13 chapter index plus a definitions sheet of at least 25 terms rewritten in your own words, each tied to a design consequence.

Week 2

Codes and Standards & Hazard Classification and Design Criteria

  • Classify ten worked occupancy descriptions into light, ordinary Group 1, ordinary Group 2, extra Group 1, and extra Group 2 hazard using the commodity and occupancy rules, and justify each call in two sentences.

  • Derive the density-area design point for each of those ten occupancies by locating the correct density-area curve and reading the design density and assumed design area.

  • Explain how storage configuration, commodity class, and storage height change the design basis, and write the three questions you must ask before selecting a storage design curve.

  • Compute the design area adjustment for sloped ceilings and for dry-pipe or preaction systems, and show the arithmetic for two sample cases.

  • Draft a one-page hazard-classification quick-reference that you could use under time pressure without opening the standard.

Your checkpoint

A hazard-classification and design-criteria worksheet covering ten occupancies with density, design area, and adjustment arithmetic shown for each.

Week 3

Water Supply Analysis and Hydraulics

  • Read a static-residual water flow test result and plot the supply curve on semi-log paper or a spreadsheet, then compute the available pressure at a target flow.

  • Apply the Hazen-Williams friction loss equation by hand to three pipe segments of differing diameter and flow, and compare your result to a spreadsheet check.

  • Assemble a complete hydraulic calculation for a simple tree system: node list, pipe schedule, elevation changes, fitting equivalent lengths, and device losses.

  • Identify the pressure demands that are easy to omit (backflow preventer, dry-pipe valve, alarm valve, hose allowance, under-duct sprinklers) and quantify each in a worked example.

  • Explain the difference between the density-area method and the room-design method, and state when each is permitted.

Your checkpoint

A hand-worked hydraulic calculation for a single tree system with supply curve plotted, ending in a documented safety margin against the available water supply.

Week 4

Sprinkler Selection, Spacing, and Positioning

  • Determine maximum and minimum spacing, protection area per sprinkler, and maximum coverage area for light, ordinary, and extra hazard occupancies, and tabulate the limits for each.

  • Position sprinklers correctly against walls, obstructions, ceilings, and soffits, and produce a sketch showing required distances for three obstruction scenarios.

  • Select the correct sprinkler temperature rating, response type, and orientation for six described environments, including a high-temperature space and a concealed space.

  • Explain the spacing rules for sloped ceilings, combustible concealed spaces, and skylights, and note where sprinklers may be omitted.

  • Calculate the number of sprinklers on a branch line and the required branch line spacing for two rectangular rooms with different ceiling heights.

Your checkpoint

A positioning and spacing sketch set for three rooms showing sprinkler locations, spacing dimensions, obstruction clearances, and coverage-area checks.

Week 5

Pipe, Fittings, Valves, and System Components

  • Build a component schedule that lists the function and selection criteria for control valves, check valves, alarm valves, dry-pipe valves, preaction valves, and deluge valves.

  • Explain the required arrangement and purpose of the main drain, auxiliary drain, test connection, flow switch, and inspector's test valve, and sketch a riser assembly.

  • Select hangers, bracing, and seismic restraints for a described pipe run, and state the spacing and support rules you applied.

  • Compare pipe materials and joining methods permitted for underground and aboveground service, and note the listing and approval evidence each requires.

  • Explain backflow prevention requirements and how the selected device affects hydraulic demand and inspection obligations.

Your checkpoint

A labeled riser and component schematic with a written component schedule stating selection criteria and code basis for each item.

Week 6

Plans, Calculations, and Working Drawings & Water Supply Analysis and Hydraulics

  • Produce a working drawing set for a small project: plan view, riser diagram, hydraulic node map, and general notes, drawn to a consistent scale and legend.

  • Complete a full hydraulic calculation worksheet that matches the drawing node for node, with no orphan nodes or unexplained fitting losses.

  • Write the material and component submittal list for that project and cross-check it against the drawing and the calculation.

  • Perform a self-review of your own drawing set against a checklist of the ten most common plan-review rejection reasons, and log every correction you make.

  • Explain what the owner's certificate and the contractor's material and test certificate must contain, and draft both for your sample project.

Your checkpoint

A complete sample working drawing set with matching hydraulic calculations, submittal list, and both certificates, self-reviewed and corrected.

Week 7

Inspection, Testing, and Acceptance & Codes and Standards

  • Sequence the acceptance test flow from hydrostatic test through flushing, flow test, alarm test, and final inspection, and state the pass criterion and witness requirement for each step.

  • Explain the four-hour hydrostatic test and the conditions under which it may be run at a lower pressure or in phases, and describe how to document the result.

  • Describe the main drain flow test and how to interpret a result that falls short of the expected flow, including the diagnostic questions you would ask.

  • List the periodic inspection, testing, and maintenance obligations after acceptance, with the interval and the responsible party for each item.

  • Draft a punch-list response for three deliberately planted deficiencies in a described system.

Your checkpoint

An acceptance-test sequence checklist with pass criteria, witness requirements, and documented responses to three planted deficiencies.

Week 8

Project Management, Safety, and Professional Practice & Codes and Standards & Hazard Classification and Design Criteria

  • Explain the professional responsibility chain among designer, contractor, owner, and authority having jurisdiction, and identify where liability shifts at each handoff.

  • Describe the safety obligations that attach to hot work, confined-space entry, and pressure testing, and list the controls you would require before each activity.

  • Resolve three ethics-and-scope scenarios in writing, including a client asking you to skip a required test and a contractor proposing an unlisted substitution.

  • Re-run a full timed practice set across all eight domains and tag every missed question by domain and root cause.

  • Build a final two-week review schedule that targets your three weakest domains by root cause rather than by topic name.

Your checkpoint

A timed practice-set score log tagged by domain and root cause, plus a written two-week review schedule targeting your three weakest areas.

Milestones

Week 2: You can classify a described occupancy into the correct hazard group and state its density and design area without opening the standard, scoring at least eight of ten on your own worksheet.

Week 4: You can hand-calculate friction loss and plot a supply curve, and your worked hydraulic calculation lands within five percent of a spreadsheet check.

Week 6: Your sample drawing set and hydraulic calculations reconcile node for node with zero unexplained fitting losses, and your self-review caught and corrected at least five issues.

Week 8: Your timed practice-set log shows at least seventy-five percent overall with no single domain below sixty percent, and your review schedule names a concrete remedy for each weak area.