HI Plumber study materials
HI Plumber study resources

HI Plumber cheat sheet

HI Plumber · Keep the key ideas within reach.

Quick reference

General Plumbing Knowledge and Safety

  • Air test pressure for DWV systems is typically 5 psi (34.5 kPa) held for 15 minutes with no drop; water test uses 10 ft (3 m) head above highest pipe.

  • A trap seal depth of 2 to 4 inches (51–102 mm) prevents sewer gas; 4 inches (102 mm) is the maximum permitted seal depth.

  • Before entering a confined space, test for oxygen (19.5–23.5%), LEL (<10%), H2S (<10 ppm), and CO (<35 ppm); ventilate continuously.

  • Pipe dope and PTFE tape are not interchangeable on gas lines; use only listed gas-compatible sealants and never use tape on flare fittings.

  • Hot water at fixture outlets must not exceed 120°F (49°C) for domestic use; scald protection is required in public facilities.

  • A backflow prevention device must be tested annually; reduced-pressure zone (RPZ) assemblies require testing by a certified tester.

  • Always support pipe at intervals: copper horizontal ≤6 ft (1.8 m), PEX horizontal ≤32 in (813 mm) and vertical ≤10 ft (3 m) per manufacturer.

Quick reference

Plumbing Systems and Fixtures

  • Water closet flush volume ≤1.6 gallons per flush (6 Lpf) for new installations; urinals ≤1.0 gpf (3.8 Lpf).

  • Lavatory faucet maximum flow rate is 2.2 gpm (8.3 L/min) at 60 psi; kitchen faucets also 2.2 gpm.

  • A water closet must be installed with a minimum 15-inch (381 mm) centerline to side wall and 21 inches (533 mm) front clearance.

  • Shower valves must be pressure-balancing or thermostatic to limit temperature fluctuations; maximum outlet temperature 120°F (49°C).

  • Fixture units (FU) are used to size drainage and supply; a water closet counts as 3 FU drainage and 10 FU supply (private).

  • Floor drains require a trap primer or trap seal protection when the trap may evaporate; trap seal depth minimum 2 inches (51 mm).

  • A fixture's tailpiece must extend at least 2 inches (51 mm) below the fixture; a continuous waste may serve up to two fixtures.

Quick reference

Drainage, Waste, and Venting Systems

  • Drainage pipe slope: 2% (1/4 inch per foot) for 2-inch (50 mm) and smaller; 1% (1/8 inch per foot) for 3-inch (80 mm) and larger.

  • A vent stack must extend at least 6 inches (152 mm) above the roof or 12 inches (305 mm) where snow accumulation is expected.

  • Maximum trap arm length: 2-inch pipe = 5 ft (1.5 m) for 1.5-inch trap; 3-inch pipe = 6 ft (1.8 m) for 2-inch trap.

  • A building drain must have a cleanout at the junction of the building sewer and at intervals not exceeding 100 ft (30.5 m).

  • Horizontal drainage pipe must be supported at intervals not exceeding 4 ft (1.2 m) for 2-inch and smaller, 10 ft (3 m) for larger.

  • A vent must rise vertically at least 6 inches (152 mm) above the fixture before offsetting horizontally.

  • The drainage fixture unit (DFU) load for a 3-inch building drain is 42 DFU; a 4-inch building drain is 216 DFU.

Quick reference

Water Supply and Distribution Systems

  • Minimum static water pressure at a fixture is 8 psi (55 kPa); maximum static pressure is 80 psi (552 kPa).

  • Pressure-reducing valve required when street pressure exceeds 80 psi (552 kPa); set to 50–60 psi (345–414 kPa).

  • Water supply pipe sizing uses fixture units (WSFU) and equivalent length; a 1/2-inch tube supplies up to 6 WSFU at 60 psi.

  • Thermal expansion control is required on a closed system; install an expansion tank sized to system volume.

  • Hot water distribution: recirculation or heat-traced lines keep hot water within 5 seconds at the farthest fixture.

  • Backflow prevention: air gap is the highest protection; RPZ for high hazard; double check for low hazard.

  • Water heater temperature and pressure relief valve discharge pipe must terminate 6–24 inches (152–610 mm) above floor and not be trapped.

Quick reference

Plumbing Code and Regulations

  • A plumbing permit is required before installing, altering, or repairing a plumbing system; exemptions vary by jurisdiction.

  • The IPC and UPC are model codes; local amendments govern. Always verify the adopted edition with the authority having jurisdiction (AHJ).

  • A plumbing inspector must be given access to inspect rough-in, water test, and final; approvals must be obtained before concealment.

  • A backwater valve is required on a building sewer subject to backflow; it must be accessible for maintenance.

  • A plumbing license is required for contractors; a journeyman license is required for individuals performing plumbing work.

  • Code requires a minimum 1-inch (25 mm) air gap for indirect waste receptors or a 2-inch (51 mm) air gap for floor drains.

  • A water heater must be anchored, strapped, and have a pan with drain when installed in an attic or ceiling space.

Quick reference

Business Management and Project Estimation

  • Labor cost = hourly wage × labor burden (typically 1.25–1.65) × hours; burden includes taxes, insurance, and benefits.

  • Overhead and profit (O&P) are added separately: overhead covers indirect costs; profit is a percentage of total cost.

  • A change order must be written and signed before work proceeds; it should state scope, price, and schedule impact.

  • Retainage is typically 5–10% withheld until substantial completion; track it as accounts receivable.

  • Estimate material waste factors: 5–10% for pipe, 10–15% for fittings, and include consumables like solder and primer.

  • A takeoff must include fixtures, pipe, fittings, valves, hangers, insulation, and equipment; verify quantities against plans.

  • Break-even point = fixed costs ÷ (unit price − variable cost per unit); use to set minimum job pricing.