CPIT APM flashcards
CPIT APM · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Project
- A temporary endeavor undertaken to create a unique product, service, or result. It has a defined beginning and end, and is not ongoing operations.
- Triple Constraint
- The interdependent constraints of scope, time, and cost, with quality at the center. Changing one constraint typically affects the others, requiring trade-offs.
- PMO
- Project Management Office. A centralized organizational unit that oversees project management. Types: supportive (consultative), controlling (compliance), directive (manages projects directly).
- Program
- A group of related projects, subsidiary programs, and program activities managed in a coordinated manner to obtain benefits not available from managing them individually.
- Portfolio
- A collection of projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives. Portfolio management aligns with organizational strategy.
- Project Life Cycle
- The series of phases that a project passes through from its start to its closure. It provides the basic framework for managing the project, regardless of specific work involved.
- Project Charter
- A document issued by the project sponsor that formally authorizes the existence of a project and provides the project manager with authority to apply organizational resources to project activities.
- Stakeholder Register
- A project document containing details about identified stakeholders, including identification information, assessment information, and stakeholder classification.
- WBS
- Work Breakdown Structure. A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish project objectives and create required deliverables.
- Critical Path
- The sequence of activities that represents the longest path through a project network diagram, which determines the shortest possible project duration. Activities on it have zero float.
- PERT Formula
- Expected duration = (Optimistic + 4 × Most Likely + Pessimistic) / 6. Used for three-point estimating to account for uncertainty in activity duration estimates.
- Risk Register
- A project document in which project risk information is recorded. It includes details such as risk description, category, probability, impact, response, and owner.
- Communications Management Plan
- A component of the project management plan that describes how project communications will be planned, structured, implemented, and monitored for effectiveness.
- Tuckman Ladder
- A model of team development stages: forming, storming, norming, performing, and adjourning. Teams progress through these stages as they mature.
- Conflict Resolution Techniques
- Methods to resolve conflict: collaborate/problem-solve, compromise, force, smooth, and withdraw. Collaborate is generally preferred for win-win outcomes.
- Fixed-Price Contract
- A contract type where the seller agrees to provide goods or services at a fixed price. The seller bears the risk of cost overruns; buyer risk is lower.
- Cost-Reimbursable Contract
- A contract type where the buyer reimburses the seller for allowable costs plus a fee. The buyer bears the risk of cost overruns; seller risk is lower.
- Manage Project Knowledge
- The process of using existing knowledge and creating new knowledge to achieve project objectives and contribute to organizational learning.
- Develop Team
- The process of improving competencies, team member interaction, and overall team environment to enhance project performance.
- Manage Communications
- The process of ensuring timely and appropriate collection, creation, distribution, storage, retrieval, management, monitoring, and ultimate disposition of project information.
- Earned Value Management
- A methodology that combines scope, schedule, and cost measurements to assess project performance and progress. Key metrics include PV, EV, AC, CPI, and SPI.
- CPI
- Cost Performance Index = Earned Value (EV) / Actual Cost (AC). CPI > 1 means under budget; CPI < 1 means over budget.
- SPI
- Schedule Performance Index = Earned Value (EV) / Planned Value (PV). SPI > 1 means ahead of schedule; SPI < 1 means behind schedule.
- EAC
- Estimate at Completion. The expected total cost of completing all work. Common formula when variances are typical: EAC = BAC / CPI.
- TCPI
- To-Complete Performance Index = (BAC – EV) / (BAC – AC). Measures the cost performance required to meet the budget at completion.
- Integrated Change Control
- The process of reviewing all change requests; approving or rejecting changes; and managing changes to deliverables, project documents, and the project management plan.
- Change Control Board
- A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions.
- Control Quality
- The process of monitoring and recording results of executing quality management activities to assess performance and ensure outputs meet quality requirements.
- Close Project or Phase
- The process of finalizing all activities for the project, phase, or contract. It includes archiving project documents and releasing resources.
- Lessons Learned
- Knowledge gained during a project that shows how project events were addressed or should be addressed in the future, for the purpose of improving performance.
- Administrative Closure
- The process of verifying and documenting project results to formalize acceptance of the product, service, or result by the sponsor, customer, or other authorized stakeholder.
- Benefits Realization
- The process of ensuring that the project's intended benefits are achieved and sustained after project closure, often tracked by the performing organization.