CPIT APM study plan
CPIT APM · Give each week a clear focus.
8 weeks · About 6 hours per week
Project Management Fundamentals
Define the project, program, and portfolio relationship in your own words and map three real workplace examples to each level
Explain how the triple constraint and competing constraints interact, using one worked example where a scope change forces a schedule and cost trade-off
Distinguish predictive, iterative, incremental, and agile delivery approaches and select the best fit for two short scenario descriptions
List the key responsibilities of a project manager versus a project sponsor and a functional manager
Build a one-page glossary of 20 core terms (stakeholder, deliverable, baseline, WBS, RACI) with definitions you wrote yourself
Your checkpoint
A one-page glossary plus a 300-word written comparison of the four delivery approaches, scored against a self-made 10-point checklist
Project Management Fundamentals
Walk through the five process groups and assign at least two concrete activities to each group
Explain how the ten knowledge areas map onto the process groups and identify which areas dominate planning versus monitoring
Describe organizational structures (functional, matrix, projectized) and predict where authority and communication friction will appear in each
Identify the inputs, tools and techniques, and outputs pattern that recurs across processes and apply it to one process of your choice
Complete 40 practice questions on fundamentals and log every miss with the reason it was missed
Your checkpoint
A process-group and knowledge-area matrix with your own example activities filled in, plus an error log covering 40 practice questions
Project Initiation and Planning
Draft a project charter for a realistic scenario, covering purpose, measurable objectives, high-level scope, success criteria, and named sponsor authority
Identify stakeholders using a power-interest grid and classify at least eight stakeholders from your scenario
Produce a stakeholder engagement plan that assigns an engagement level (unaware, resistant, neutral, supportive, leading) and a tailored action to each key stakeholder
Write three SMART objectives and test each one against a measurable acceptance criterion
Explain the difference between a business case and a benefits management plan and state who owns each
Your checkpoint
A complete project initiation pack for one scenario: charter, stakeholder register, power-interest grid, and engagement plan
Project Initiation and Planning
Decompose your scenario scope into a work breakdown structure to at least three levels with a work package dictionary for five packages
Estimate duration and cost for each work package using two different techniques and explain when each technique is appropriate
Sequence activities into a network diagram and calculate the critical path, total float, and free float by hand
Build a resource-loaded schedule and identify at least one over-allocation and your resolution
Draft a risk register with eight risks, each with probability, impact, score, response strategy, and an owner
Your checkpoint
A planning baseline for the scenario: WBS, activity list, network diagram with critical path and float values, cost estimate, and risk register
Project Initiation and Planning & Project Execution, Monitoring and Control
Assemble a cost baseline with a contingency reserve and a management reserve, and justify each reserve amount
Write a quality management plan naming two quality metrics, the measurement method, and the tolerance threshold
Draft a communications management plan that specifies audience, message, channel, frequency, and owner for at least six communication events
Explain how the baseline is set and what formal change control is required once it exists
Complete 40 practice questions spanning initiation and planning and update your error log
Your checkpoint
A consolidated project management plan covering scope, schedule, cost, quality, risk, and communications, with a change control procedure section
Project Execution, Monitoring and Control
Calculate schedule variance, cost variance, SPI, CPI, EAC, and ETC from a supplied set of earned value figures and interpret each result in plain language
Apply the critical path method to a scenario where an activity slips and determine the schedule impact, including float consumption
Perform a quality control review using a control chart or checklist and decide whether the process is in control
Run a risk reassessment and record two risks that changed status, with the response you would trigger
Describe how issue logs, change requests, and lessons learned feed back into the plan
Your checkpoint
An earned value analysis worksheet with at least six worked calculations, interpretations, and a one-paragraph status report written for a sponsor
Project Execution, Monitoring and Control & Project Closure and Stakeholder Communication
Evaluate a change request end to end: impact on scope, schedule, cost, risk, and quality, plus the approve, reject, or defer recommendation
Design a stakeholder communication for a bad-news scenario (schedule slip or budget overrun) that states facts, impact, options, and a recommendation
Distinguish formal written, formal verbal, informal written, and informal verbal communication and match each to an appropriate situation
Prepare for closure by listing the acceptance criteria, transition activities, and documentation required to close the project
Complete 40 practice questions on execution, monitoring, control, and communication and review every logged error
Your checkpoint
A change request impact assessment plus a bad-news stakeholder communication package, each reviewed against a self-made rubric
Project Closure and Stakeholder Communication
Produce a final project report covering objectives achieved, scope delivered, schedule and cost performance against baseline, and outstanding items
Write a lessons learned register with at least six entries classified by knowledge area and a recommended process improvement for each
Explain the difference between administrative closure and contract closure and list the inputs to each
Create a benefits realization handover note identifying who measures each benefit, when, and with what metric
Take two full-length timed practice exams and build a final review sheet of the 15 concepts you missed most often
Your checkpoint
A closure pack: final report, lessons learned register, benefits handover note, and a one-page personal weak-spot review sheet
Milestones
Week 2: Score at least 70% on a 40-question fundamentals set and show that every missed item has a written reason in the error log
Week 4: Produce a network diagram with a correct critical path and float values, verified by recalculating the path lengths independently
Week 6: Calculate all six earned value measures correctly on a fresh practice set with no reference to notes
Week 8: Score at least 75% on both timed full-length practice exams and show a shrinking error-log list compared with week 2