CIC Grade A Electrical Trade Test study materials
CIC Grade A Electrical Trade Test study resources

CIC Grade A Electrical Trade Test study plan

CIC Grade A Electrical Trade Test · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Construction-related E&M Trades

  • List every construction-related E&M trade discipline covered by the syllabus (conduit and trunking, cable tray, busbar, earthing, wiring accessories, lighting and power installation, cable jointing) and write a one-line scope note for each

  • Map each discipline to the Hong Kong wiring regulation clauses and code-of-practice sections that govern it, citing clause numbers from memory then verifying

  • Build a personal glossary of 60 trade terms in English with Chinese equivalents where the exam paper uses them

  • Solve 20 recall questions on trade scope and terminology and log wrong answers with the reason

Your checkpoint

A one-page discipline-to-regulation map plus a 60-term bilingual glossary file

Week 2

Construction-related E&M Trades

  • Calculate conduit and trunking sizing for mixed power and final-circuit loads using the factor-of-fill rules

  • Compute voltage drop for single-phase and three-phase final circuits and select conductor sizes that satisfy the 4% and 2.5% limits

  • Size protective devices against cable current-carrying capacity after applying grouping, ambient temperature, and thermal insulation correction factors

  • Work 15 numerical installation-design problems under timed conditions and mark them against the worked method

Your checkpoint

A worked solutions booklet of 15 cable-sizing and voltage-drop problems with correction factors shown line by line

Week 3

Construction-related E&M Trades

  • Draft a method statement and risk assessment for a live-testing and cable-pulling activity on a construction site

  • Sequence a typical ceiling-void containment and containment-to-equipment wiring installation from first fix to testing

  • Identify coordination points between electrical, HVAC, plumbing, and fire services trades in a shared ceiling void and state who moves first and why

  • Explain permit-to-work, isolation, and lockout-tagout steps for working near existing live installations

Your checkpoint

A two-page method statement with risk assessment and trade-coordination sequence chart for one installation activity

Week 4

Construction-related E&M Trades & Trade Test for Grade A Electrical Work

  • Review weeks 1-3 notes and re-solve every previously missed calculation without reference to the answers

  • List the statutory and regulatory framework for Grade A electrical work, including the registration categories and the scope each category permits

  • State the duties of the registered electrical worker and contractor for design, installation, inspection, testing, and certification

  • Complete a 40-question mixed mock on Domain 1 plus regulatory basics and score it

Your checkpoint

A mid-point mock score report showing per-topic accuracy and a list of the three weakest topics to carry forward

Week 5

Trade Test for Grade A Electrical Work

  • Describe the inspection and testing sequence for a new installation from visual inspection through to certification, naming each test in order

  • Explain insulation resistance, earth continuity, polarity, ring-circuit continuity, and earth fault loop impedance tests, including instrument type, test voltage, and pass criteria

  • Perform and record a full set of test results for a simulated single-phase and three-phase board on paper

  • Interpret residual current device trip times and explain when a test result requires investigation

Your checkpoint

A completed test certificate and schedule of test results for a simulated installation, with pass or fail verdicts on every reading

Week 6

Trade Test for Grade A Electrical Work

  • Apply the requirements for earthing and bonding, including main equipotential bonding sizing and supplementary bonding conditions

  • Specify protective device types and ratings for given loads and justify discrimination and backup protection choices

  • Explain the classification of hazardous areas and the equipment selection rules that follow from each zone

  • Answer 20 scenario questions on protection, earthing, and special installations and justify each answer in two sentences

Your checkpoint

A justification sheet for 20 protection and earthing scenarios, each with the governing requirement cited

Week 7

Trade Test for Grade A Electrical Work

  • Diagnose ten written fault scenarios (nuisance tripping, high loop impedance, reversed polarity, lost neutral, overheating joint) and state the test that confirms each diagnosis

  • Summarise periodic inspection requirements, sampling rates, and the categories of observation codes used in reports

  • Explain the documentation set required on completion: certificate, test schedule, as-installed drawings, and operation and maintenance manual

  • Complete a 40-question mock weighted 50/50 across both domains under exam timing

Your checkpoint

A fault-diagnosis table of ten scenarios plus a timed mock score with a written review of every error

Week 8

Construction-related E&M Trades & Trade Test for Grade A Electrical Work

  • Re-drill all flagged weak topics from weeks 4 and 7 using short focused question sets until accuracy exceeds 80%

  • Recite the key regulation limits, correction factor tables, and test pass criteria from memory in a single self-written one-page crib sheet

  • Sit two full-length timed papers under exam conditions and compare scores for consistency

  • Finalise an exam-day plan covering time allocation per section, question-skipping rules, and calculation checking routine

Your checkpoint

Two full-length timed mock scores plus a one-page handwritten crib sheet covering all memorised limits and criteria

Milestones

Week 2: Score at least 70% on the 15 timed cable-sizing and voltage-drop problems, with every correction factor correctly applied

Week 4: Score at least 65% on the 40-question mixed mock and name the three weakest topics with evidence from the score report

Week 6: Produce a complete test certificate with correct pass or fail verdicts on all readings and cite the governing requirement for all 20 protection scenarios

Week 8: Score at least 75% on both full-length timed papers and reproduce the crib sheet from memory with no more than three omissions