HKIS LSD APC Part I Written Assessment study materials
HKIS LSD APC Part I Written Assessment study resources

HKIS LSD APC Part I Written Assessment flashcards

HKIS LSD APC Part I Written Assessment · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

AP (Surveying) role
Authorized Person (Surveying) supervises site formation, excavation, and geotechnical works, certifies survey submissions, and ensures compliance with Buildings Ordinance and approved plans.
Professional indemnity insurance
Not mandatory by law but commonly required by clients; covers negligence claims. APs should maintain adequate cover to protect against professional liability.
Conflict of interest
Must be disclosed promptly to clients and employers; APs should avoid situations where personal interests conflict with professional duties to maintain integrity.
Buildings Ordinance Cap. 123
Regulates building works, demolition, and site formation; establishes AP/RSE/RC roles; non-compliance can lead to stop notices, closure orders, and prosecution.
Lands Ordinance Cap. 28
Governs land resumption, compensation, and related matters; provides for the Lands Tribunal to hear certain land disputes.
Land Survey Ordinance Cap. 473
Establishes Land Survey Authority and registration of land surveyors; supports cadastral survey and boundary determination; requires deposit of survey records.
HK80 Geodetic Datum
Official geodetic datum of Hong Kong; coordinates in HK80 Grid via Transverse Mercator projection; used for all surveying and mapping.
Boundary determination
Relies on approved survey plans, Crown lease descriptions, and Land Survey Ordinance; courts consider original grant, plans, physical features, and possession evidence.
Cadastral survey accuracy
For urban areas, positional uncertainty should not exceed 0.1 m at 95% confidence; for 1:1000 scale plans, tolerance is typically ±0.1 m.
Hong Kong Principal Datum
Vertical reference for Hong Kong; based on mean sea level at Victoria Harbour; used for levelling and engineering works.
GNSS static survey
Requires at least 4 satellites, PDOP <6, and sufficient session length (e.g., 30 min for baselines <10 km) to achieve mm-cm accuracy.
Deformation monitoring
Uses repeated precise levelling or total station measurements; applies rigorous adjustment and statistical tests to detect significant movement at 95% confidence.
Least squares adjustment
Computes residuals, a posteriori variance factor, and chi-square test to assess quality; blunders detected via data snooping.
Topographic map scales
Hong Kong Survey and Mapping Office produces 1:1000, 1:5000, and 1:20000 topographic maps; 1:1000 maps have horizontal and vertical accuracy of ±0.5 m.
Cadastral maps
Define lot boundaries based on Land Survey Ordinance; used for land registration and boundary determination; deposited with Land Survey Authority.
GIS topology
Ensures spatial relationships such as no gaps or overlaps in cadastral parcels; critical for data integrity in land information systems.
HK80 Grid EPSG code
EPSG:2326 is the code for Hong Kong 1980 Grid; must be correctly defined in GIS to ensure accurate mapping and analysis.
Metadata standard ISO 19115
International standard for geospatial metadata; includes title, source, accuracy, and processing steps to document survey data.
Setting-out tolerances
Typical tolerances: ±5 mm for building elements, ±10 mm to ±25 mm for roads and drainage; refer to contract specification for exact requirements.
As-built surveys
Measure completed works to verify compliance with design; produce as-built drawings and reports; compare with design and record deviations.
Lease modification
Application to Lands Department to change lease conditions; may involve premium payment and revised conditions; process includes valuation and legal documentation.
Land exchange
Surrender old lot and grant new lot, often for consolidation; governed by Lands Ordinance and government policy; requires premium assessment.
Deeds Registration Ordinance
Cap. 128 provides for registration of instruments; registration gives priority but does not guarantee title.
Total station calibration
Check collimation error, trunnion axis, vertical index, and EDM offset regularly; use certified baseline for distance calibration.
GNSS equipment verification
Verify antenna height, check against known points, and perform factory calibration annually; monitor PDOP and satellite geometry.
Digital level calibration
Calibrate with invar staff; check collimation error and compensator function; use for precise levelling to ±1 mm/km.
Site supervision records
AP/RSE must keep site diary, record instructions, weather, labor, and incidents; conduct regular inspections and retain records for at least 6 years.
Safety management regulation
Factories and Industrial Undertakings (Safety Management) Regulation requires risk assessments, PPE, and accident reporting to Labor Department.
Professional liability
AP can be liable for negligence, breach of contract, and statutory offences; professional indemnity insurance is essential but not mandatory by law.
Report structure
Professional reports should include introduction, methodology, findings, analysis, conclusions, and recommendations; use objective language and support opinions with evidence.
Peer review
Have reports reviewed by another qualified professional before issuing, especially for high-risk matters, to ensure accuracy and quality.
Confidentiality
Do not disclose client information without consent; comply with Personal Data (Privacy) Ordinance Cap. 486 when handling personal data.