HVAC Excellence Master LC Refrigeration study materials
HVAC Excellence Master LC Refrigeration study resources

HVAC Excellence Master LC Refrigeration study plan

HVAC Excellence Master LC Refrigeration · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Refrigeration Fundamentals and System Components & System Performance and Charging

  • Build a component map of a light commercial refrigeration circuit (compressor, metering device, evaporator, condenser, receiver, accumulator, filter-drier) and state the state of refrigerant at each point

  • Explain superheat, subcooling, saturation temperature, and pressure-temperature relationship without notes

  • Compute superheat and subcooling from sample gauge and thermometer readings, including one TEV and one fixed-orifice example

  • Identify the four metering device types and describe how each responds to load change

Your checkpoint

A one-page hand-drawn schematic with labeled refrigerant states plus 10 solved superheat/subcooling calculations at 80% or better

Week 2

Refrigeration Fundamentals and System Components & System Performance and Charging

  • Describe compressor types (reciprocating, scroll, rotary) and match each to typical light commercial applications

  • Explain how condenser and evaporator airflow, coil fouling, and ambient conditions shift pressures and superheat

  • Trace refrigerant migration, floodback, and slugging scenarios to their component damage

  • Convert between gauge pressure, absolute pressure, and saturation temperature for R-410A and R-134a

Your checkpoint

A written troubleshooting table linking 8 fault conditions to pressure/superheat/subcooling signatures, scored against a self-made answer key

Week 3

Light Commercial System Installation and Piping & Refrigeration Fundamentals and System Components

  • Size and select line sizes for a sample light commercial system using a manufacturer line-size chart

  • List brazing procedures including nitrogen purge, heat control, and post-braze pressure testing

  • Describe evacuation to 500 microns and explain why triple evacuation and decay testing matter

  • Identify proper piping practices for traps, oil return, and long-line runs

Your checkpoint

A complete piping plan for a sample 5-ton remote condensing unit, including line sizes, fitting list, and evacuation checklist

Week 4

Light Commercial System Installation and Piping & Electrical and Controls

  • Interpret a light commercial wiring diagram, tracing line voltage, control voltage, and safety circuits

  • Explain contactor, overload, capacitor, and defrost control function and failure symptoms

  • Describe thermostat and pressure control settings and how each protects the system

  • Summarize NEC and local code considerations for disconnects, grounding, and conductor sizing on a refrigeration circuit

Your checkpoint

A component-by-component walkthrough of a sample wiring diagram with expected voltage at each test point, verified against a practice quiz at 80% or better

Week 5

Electrical and Controls & System Performance and Charging

  • Perform and document a full charging procedure using superheat for fixed-orifice and subcooling for TEV systems

  • Calculate target superheat using indoor wet-bulb and outdoor dry-bulb conditions

  • Explain how to weigh in a charge and when to use each charging method

  • Diagnose overcharge, undercharge, and restricted metering device from readings alone

Your checkpoint

A charging worksheet with three worked scenarios showing method chosen, target values, and final readings within manufacturer tolerance

Week 6

Diagnosis, Service, and Repair & System Performance and Charging

  • Build a systematic diagnostic sequence from complaint to confirmed fault

  • Diagnose the top 10 light commercial faults including dirty condenser, restricted drier, bad capacitor, and refrigerant leak

  • Interpret compressor amp draw, winding resistance, and insulation resistance readings

  • Explain leak detection methods and repair/retrofit considerations

Your checkpoint

A diagnostic flowchart covering 10 faults with expected readings and repair actions, validated by a 20-question self-test at 80% or better

Week 7

Diagnosis, Service, and Repair & Light Commercial System Installation and Piping

  • Describe recovery, recycling, and reclamation procedures and cylinder handling requirements

  • Outline compressor replacement steps from pump-down through startup verification

  • Explain preventive maintenance tasks and their effect on efficiency and equipment life

  • Practice documenting a service call from arrival to sign-off

Your checkpoint

A complete mock service-call report for a no-cooling complaint, including readings, diagnosis, repair, and final verification

Week 8

Refrigeration Fundamentals and System Components & Light Commercial System Installation and Piping & Electrical and Controls & System Performance and Charging & Diagnosis, Service, and Repair

  • Review weak areas identified in weeks 1-7 using missed-question logs

  • Complete two timed 50-question practice exams across all domains

  • Re-derive key formulas and reference values from memory

  • Practice explaining five common faults aloud in under two minutes each

Your checkpoint

Two timed practice exams scored at 80% or better with a written remediation list for every missed item

Milestones

Week 2: Can explain superheat, subcooling, and saturation temperature from memory and solve 10 calculations with 80% accuracy

Week 4: Can trace a full wiring diagram and state expected voltage at every test point without notes

Week 6: Can diagnose 10 common faults from pressure, temperature, and electrical readings alone