- Concealed piping inspection
- Drainage, vent, and water piping must be tested and inspected before being covered or concealed; the authority having jurisdiction must approve the installation before concealment.
- DWV air test
- Drainage and vent systems may be tested with air at 5 psi for at least 15 minutes with no pressure drop, as an alternative to a 10-foot water head test.
- Approved
- Material, device, or method accepted by the authority having jurisdiction as meeting the code, usually evidenced by listing by a recognized testing agency.
- Building drain
- The lowest piping of a drainage system that receives waste from inside the building and extends 30 inches beyond the outside face of the wall.
- Trap seal
- The vertical depth of water in a trap that prevents sewer gas from passing through, measured from the trap weir to the top of the dip.
- Pressure head conversion
- One psi equals 2.31 feet of water column, and one foot of water column equals 0.433 psi; multiply height in feet by 0.433 to find static pressure.
- Hazen-Williams formula
- Head loss in feet equals 4.727 times length times flow to the 1.852 power, divided by C to the 1.852 power times diameter to the 4.87 power.
- 45-degree offset multiplier
- For a 45-degree offset, multiply the offset by 1.414 to get the travel, and the offset equals the travel times 0.707.
- Drain slope 2 inch and smaller
- Drainage pipe 2 inches and smaller is pitched at 1/4 inch per foot (2 percent); 3-inch pipe may be at 1/8 inch per foot where approved.
- Cleanout at base of stack
- A cleanout is required at the base of each soil or waste stack and at each change of direction of 45 degrees or more in the building drain.
- Trap arm fall limit
- The fall of a trap arm may not exceed one pipe diameter, so a 1-1/2-inch trap arm can drop at most 1-1/2 inches before it is vented.
- Vent above flood level rim
- A fixture vent must rise at least 6 inches above the flood level rim of the fixture before any horizontal offset, except where the vent is a wet vent.
- Vent through roof height
- Vent terminals must extend at least 6 inches above the roof surface, and 12 inches where snow accumulation is likely, and be unobstructed.
- Wet vent definition
- A wet vent is a vent that also serves as a drain for one or more fixtures, limited to bathroom groups on the same floor in most codes.
- Trap seal depth
- A trap must maintain a water seal of at least 2 inches and not more than 4 inches, measured from the weir to the top of the dip.
- Grease interceptor purpose
- A grease interceptor separates fats, oils, and grease from kitchen waste before discharge to the sewer, and must be sized by code and cleaned regularly.
- S-trap prohibition
- S-traps are prohibited because they can siphon their seal; a fixture drain must connect through a vented trap arm to a vertical or horizontal branch.
- Pressure-reducing valve threshold
- A pressure-reducing valve is required when the water supply pressure exceeds 80 psi, and the reduced pressure is typically set to 50 psi.
- Water hammer arrestor
- A device with a trapped air chamber or piston installed near a quick-closing valve to absorb the shock wave and prevent pipe noise and damage.
- Minimum fixture pressure
- Fixtures must receive at least 8 psi residual pressure under normal flow, and flushometer valves typically need 15 to 25 psi to operate.
- Water closet 1.6 gpf
- A water closet may use no more than 1.6 gallons per flush, a standard set by federal law, though some codes allow 1.28 gpf high-efficiency models.
- Showerhead flow limit
- Showerheads are limited to 2.5 gallons per minute at 80 psi, a federal standard that applies to each showerhead in a shower.
- Water closet side clearance
- A water closet must be at least 15 inches from its centerline to any side wall and have at least 21 inches of clearance in front.
- T&P relief valve setting
- A temperature and pressure relief valve is typically set to open at 210 degrees Fahrenheit or 150 psi, whichever occurs first, and must not be capped.
- TPR discharge termination
- The relief valve discharge pipe must be full size, flow by gravity, and terminate 6 inches above the floor or outside, with no threaded end.
- Water heater in garage
- A water heater installed in a garage must be elevated so the ignition source is at least 18 inches above the floor to avoid vapors.
- Sediment trap
- A sediment trap or drip leg is installed downstream of the appliance shutoff valve and upstream of the controls to catch debris and moisture.
- Gas shutoff valve location
- A manual shutoff valve must be installed in the gas piping within 6 feet of the appliance and be readily accessible.
- Gas piping pressure test
- Low-pressure gas piping is commonly tested with air at 10 psi for 10 minutes with no pressure drop before the meter is connected.
- Air gap
- An air gap is the unobstructed vertical distance between a water supply outlet and the flood level rim of a fixture, at least twice the pipe diameter.
- RPZ device
- A reduced-pressure principle assembly has two check valves and a relief valve that discharges if differential pressure is lost, protecting against high-hazard backflow.