IA Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Drainage Systems and Drainage Piping

  • Label every segment of a drain, waste and vent (DWV) system by its code name: fixture drain, fixture branch, soil stack, waste stack, stack vent, building drain, building sewer.

  • Compute drain fixture units (DFU) for a mixed fixture load by looking up each fixture type and summing branch and stack totals.

  • Apply minimum slope and sizing rules to horizontal drainage pipe, distinguishing 2-1/2 in. and smaller from 3 in. and larger.

  • Identify prohibited drainage fittings and connections, including the restrictions on sanitary tees, double fittings, and horizontal-to-vertical turns.

  • Locate required cleanouts by pipe size, run length, and change of direction.

Your checkpoint

A one-page DFU takeoff and sizing sheet for a two-story, three-bath house plus a small restaurant, with every drain segment labeled, sized, sloped, and cleanouts marked.

Week 2

Drainage Systems and Drainage Piping & Vents and Venting Systems

  • Determine when a trap is required to be vented and select an acceptable vent type (individual, common, wet, circuit, island) for each fixture group.

  • Size vent stacks and vent branches from connected DFU using the vent sizing table.

  • Apply rules for vent termination height, distance from openings, and clearance above the roof.

  • Explain the function of a stack vent versus a vent stack in a multi-story building and where each is required.

Your checkpoint

A venting diagram for the Week 1 house showing every vent, its size, its termination point, and the DFU basis for each size, checked against the vent tables.

Week 3

Vents and Venting Systems & Traps, Interceptors and Special Wastes

  • Verify trap seal depth and trap arm length limits, and identify prohibited traps such as S-traps, bell traps, and traps with moving parts.

  • Select and size a grease interceptor for a restaurant and explain when a sand or oil interceptor is required.

  • Describe how special wastes (chemical, corrosive, high-temperature, dental, or photographic) must be handled before discharge.

  • Explain the purpose and placement of each fixture's vent relative to the trap weir.

Your checkpoint

A traps-and-interceptors decision table covering ten fixture scenarios, each with the required trap, vent arrangement, interceptor need, and code basis.

Week 4

Water Supply and Water Distribution & Plumbing Math and Pipe Sizing Calculations

  • Convert water supply fixture units (WSFU) to probable demand in gallons per minute using the demand curve.

  • Size a water service main, building supply, and branch lines from WSFU and available pressure.

  • Compute developed length and apply it to friction loss and pressure-loss calculations.

  • Determine required residual pressure at fixtures and where a pressure-reducing or booster system is needed.

Your checkpoint

A full water supply sizing worksheet for a two-story house: WSFU per branch, converted gpm, pipe sizes, developed length, and residual pressure check at the farthest fixture.

Week 5

Water Supply and Water Distribution & Plumbing Math and Pipe Sizing Calculations

  • Calculate velocity and pressure loss in copper and PEX lines using standard friction tables, and select a pipe diameter that satisfies both.

  • Lay out a public water main, meter, service line, and distribution tree with valves, and justify each valve location.

  • Solve plumbing math problems involving volume, capacity, slope as a percentage, and unit conversions (psi to feet of head, gallons to cubic feet).

  • Explain thermal expansion control and the placement of shock arrestors, water hammer arrestors, and air chambers.

Your checkpoint

A timed 25-question math and water supply problem set, worked fully with units shown, scored and corrected to 80 percent or better.

Week 6

General Regulations, Administration and Definitions & Plumbing Fixtures and Fixture Fittings

  • Define key code terms (approved, listed, fixture branch, plumbing system, accessible) and apply them to scenario questions.

  • Outline the permit, inspection, and testing sequence for new plumbing work, including the water test and air test requirements.

  • State required fixture clearances, spacing, and installation requirements for water closets, lavatories, sinks, and showers.

  • Identify fixture-fitting requirements including backflow protection at hose bibs and the correct use of fixture stops and escutcheons.

Your checkpoint

A one-page administrative and fixtures cheat sheet plus a 20-question self-quiz on definitions and fixture installation rules.

Week 7

Water Heaters and Temperature Control & Fuel Gas Piping and Gas Appliances

  • Specify temperature and pressure relief valve sizing, placement, and discharge piping for storage and tankless water heaters.

  • Apply water heater installation rules for seismic strapping, drip pans, combustion air, and venting of gas-fired units.

  • Size gas piping by the longest-length method and identify required sediment traps, shutoff valves, and appliance connectors.

  • Explain combustion air requirements and the prohibition on installing gas appliances in bedrooms and bathrooms without the required safeguards.

Your checkpoint

A gas piping and water heater sizing sheet for a house with a range, furnace, and two water heaters, including pipe sizes, relief valve discharge route, and combustion air calculation.

Week 8

Backflow Prevention and Cross-Connection Control & General Regulations, Administration and Definitions

  • Rank backflow prevention assemblies (air gap, reduced pressure zone, double check, pressure vacuum breaker, atmospheric vacuum breaker) by degree of hazard and apply each to a scenario.

  • Identify cross-connection risks in typical residential and commercial installations and specify the correct device.

  • Review all ten domains using a missed-question log and re-drill the two weakest domains.

  • Complete full-length practice exams under timed conditions.

Your checkpoint

A 100-question timed practice exam score of 75 percent or better, plus a written error log listing each missed question's domain and the rule that was forgotten.

Milestones

Week 2: Score 80 percent or better on a 30-question drainage-and-venting quiz, and correctly size the building drain, building sewer, and every vent for the Week 1 house without looking at the answer key twice.

Week 4: Complete a 40-question mixed quiz covering Domains 3, 4, 5, and 6 at 75 percent or better, with a log of the specific tables misread or misapplied.

Week 6: Recite the permit and inspection sequence from memory, and score 85 percent or better on a 25-question definitions-and-fixtures quiz.

Week 8: Pass a full-length timed practice exam at 75 percent or better in every domain, with no domain below 70 percent, and finish the error log review.