ICBB flashcards
ICBB · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Critical to Quality (CTQ)
- A measurable characteristic derived from customer needs that must meet a specification for the customer to be satisfied; each CTQ needs an operational definition and limits.
- SIPOC diagram
- A high-level map showing Suppliers, Inputs, Process steps, Outputs, and Customers; used in Define to set project boundaries and identify scope.
- Cost of Poor Quality
- Total cost of internal failures, external failures, and appraisal activities; used to quantify the financial opportunity and justify a Six Sigma project.
- SMART goal
- A project goal stated as Specific, Measurable, Achievable, Relevant, and Time-bound, including baseline, target, and completion date.
- Champion role
- A senior sponsor who selects and authorizes projects, allocates resources, removes organizational barriers, and reviews progress with the Black Belt.
- Kano model
- Classifies customer requirements as must-be, performance, or delighter; must-be features cause dissatisfaction only when absent and are rarely stated.
- Pareto principle
- The observation that a small number of causes (roughly 20 percent) produce most defects (roughly 80 percent); Pareto charts rank categories to focus effort.
- Operational definition
- A precise, unambiguous description of how a characteristic is measured, including instrument, procedure, and acceptance criteria, so different observers get the same result.
- Gage R&R
- A measurement systems analysis that estimates repeatability (equipment variation) and reproducibility (appraiser variation); percent study variation above 30 is unacceptable.
- Attribute agreement analysis
- A study of discrete measurement systems reporting within-appraiser and between-appraiser agreement and kappa; kappa below 0.70 indicates weak agreement beyond chance.
- Cp and Cpk
- Cp equals specification width divided by six sigma, measuring potential capability; Cpk accounts for centering and is always less than or equal to Cp.
- Pp and Ppk
- Capability indices computed with the overall standard deviation rather than within-subgroup sigma; they reflect long-term performance and are usually lower than Cp and Cpk.
- DPMO to sigma level
- Defects per million opportunities converted to sigma level using the 1.5 sigma shift; 66,807 DPMO is 4 sigma and 3.4 DPMO is 6 sigma.
- p versus np chart
- A p chart plots proportion defective and handles varying subgroup sizes; an np chart plots number defective and requires a constant subgroup size.
- c versus u chart
- A c chart plots defects per unit with constant opportunity area; a u chart plots defects per unit when the opportunity or area varies between samples.
- Measurement resolution rule
- The measurement increment should be no more than one-tenth of the tolerance range; coarser resolution hides variation and weakens capability estimates.
- Type I and Type II error
- Type I error (alpha) rejects a true null hypothesis, a false alarm; Type II error (beta) fails to reject a false null, a missed effect.
- Statistical power
- Power equals one minus beta, the probability of detecting a real effect; it rises with larger effect size, larger sample, and lower alpha.
- Paired t-test
- Compares two measurements taken on the same unit, such as before and after; pairing removes between-unit variation and increases sensitivity.
- ANOVA F test
- Tests whether three or more group means are equal by comparing between-group variance to within-group variance; a significant result requires post-hoc pairwise comparison.
- Chi-square test
- Tests association between two categorical variables by comparing observed and expected counts; expected counts should be at least five in each cell.
- R-squared
- The proportion of variation in the response explained by the regression model; it does not by itself prove the model is adequate or causal.
- Multi-Vari study
- A graphical study that stratifies variation into within-unit, between-unit, and temporal sources to identify where most variation originates.
- Risk Priority Number
- RPN equals Severity times Occurrence times Detection in FMEA; high-severity failure modes are addressed first regardless of RPN ranking.
- Fractional factorial design
- A designed experiment using a subset of full factorial runs; it reduces cost but aliases effects, so resolution determines which effects can be separated.
- Design resolution
- Resolution III confounds main effects with two-factor interactions; IV confounds two-factor interactions with each other; V confounds two-factor interactions with three-factor interactions.
- Poka-yoke
- Error-proofing that prevents a defect from being made or detects it immediately; examples include fixtures that make wrong assembly physically impossible.
- PDCA cycle
- Plan, Do, Check, Act: a continuous improvement cycle used to pilot changes, verify results, and standardize what works before wider deployment.
- 5S method
- Sort, Set in order, Shine, Standardize, Sustain; a workplace organization method that stabilizes the improved process and reduces motion and search waste.
- Control plan
- A document listing process steps, characteristics and specifications, measurement method, sample size and frequency, control method, and reaction plan with owner.
- Control limits versus specs
- Control limits are computed at plus or minus three sigma from process data and describe what the process does; specification limits come from customer requirements.
- Western Electric rules
- Signals of special cause: one point beyond three sigma, two of three beyond two sigma, four of five beyond one sigma, or eight consecutive points on one side.