ICBB study materials
ICBB study resources

ICBB key terms

ICBB · Get comfortable with the vocabulary.

Voice of the Customer (VOC)

The structured collection of customer needs, expectations, and complaints gathered through interviews, surveys, and complaint data, then translated into measurable requirements that a Six Sigma project can target.

Related: Critical to Quality (CTQ), SIPOC Diagram
Critical to Quality (CTQ)

A measurable characteristic of a product or service that directly reflects an important customer requirement, derived from VOC data and used to set project metrics and specification limits.

Related: Voice of the Customer (VOC), Specification Limits
SIPOC Diagram

A high-level process map showing Suppliers, Inputs, Process steps, Outputs, and Customers, used at project definition to agree on scope and boundaries before detailed mapping begins.

Related: Process Map, Voice of the Customer (VOC)
Project Charter

A formal document authorizing a Six Sigma project that states the problem, goal, scope, business case, team, milestones, and expected financial benefit, and is signed by the project sponsor.

Related: Sponsor, Problem Statement
Problem Statement

A concise description of the gap between current and desired performance, including what, where, when, and how much, without stating a cause or a solution.

Related: Project Charter, Goal Statement
Goal Statement

A specific, measurable, time-bound target for improving the metric named in the problem statement, expressed as a direction, amount, and deadline.

Related: Problem Statement, SMART Objective
SMART Objective

A goal written to be Specific, Measurable, Achievable, Relevant, and Time-bound, which helps teams avoid vague aims such as improve quality or reduce waste.

Related: Goal Statement
Sponsor

A senior manager who provides resources, removes organizational barriers, approves the charter, and is accountable for realizing the project's financial and operational benefits.

Related: Project Charter, Stakeholder Analysis
Stakeholder Analysis

The process of identifying everyone affected by or able to influence a project, then assessing their interest and power to plan appropriate communication and involvement.

Related: Sponsor, Change Management
Cost of Poor Quality (COPQ)

The total cost incurred because work is done incorrectly, including internal and external failures, appraisal, and prevention costs, often used to size the business case for improvement.

Related: Project Charter, Rolled Throughput Yield (RTY)
Operational Definition

A precise, unambiguous description of how a characteristic is measured, including the instrument, procedure, and decision criteria, so different people obtain consistent results.

Related: Measurement System Analysis (MSA), Data Types
Data Types

The classification of data as continuous (measured on a scale, such as time or weight) or discrete (counted or categorized, such as defects or pass/fail), which determines the statistical tools that apply.

Related: Operational Definition, Attribute Agreement Analysis
Measurement System Analysis (MSA)

A set of studies that quantifies variation contributed by the measurement system itself, separating repeatability, reproducibility, bias, linearity, and stability from true process variation.

Related: Gage R&R, Attribute Agreement Analysis
Gage R&R

A study that estimates how much observed variation comes from repeatability (same operator, same part) and reproducibility (different operators), usually expressed as a percentage of total variation.

Related: Measurement System Analysis (MSA), Repeatability
Repeatability

The variation observed when one operator measures the same item multiple times with the same instrument under identical conditions, reflecting the equipment and method consistency.

Related: Reproducibility, Gage R&R
Reproducibility

The variation in measurements introduced by differences between operators or setups when measuring the same items, reflecting how consistently people apply the measurement procedure.

Related: Repeatability, Gage R&R
Attribute Agreement Analysis

A study for discrete or subjective judgments that assesses agreement of each appraiser with themselves, with other appraisers, and with a known standard, reported as percentages or kappa values.

Related: Data Types, Measurement System Analysis (MSA)
Process Capability (Cp, Cpk)

Indices comparing specification width and centering to process variation; Cp ignores centering while Cpk accounts for how far the mean sits from the nearest specification limit.

Related: Specification Limits, Process Performance (Pp, Ppk)
Specification Limits

The upper and lower bounds on a characteristic set by the customer or design, defining acceptable output; they are not derived from the process's own observed variation.

Related: Process Capability (Cp, Cpk), Critical to Quality (CTQ)
Process Performance (Pp, Ppk)

Capability-like indices calculated using the overall standard deviation of all data rather than within-subgroup variation, so they reflect long-term performance including shifts and drift.

Related: Process Capability (Cp, Cpk), Control Chart
Control Chart

A time-ordered plot of a process metric with a center line and statistically derived limits, used to distinguish common-cause variation from special-cause signals.

Related: Common Cause Variation, Special Cause Variation
Common Cause Variation

The routine, random variation inherent in a stable process, produced by many small interacting sources; reducing it requires changing the process itself, not reacting to individual points.

Related: Special Cause Variation, Control Chart
Special Cause Variation

Variation arising from an identifiable, non-routine event such as a bad batch, new operator, or equipment fault, detected by control chart rules and investigated for a root cause.

Related: Common Cause Variation, Root Cause Analysis
Root Cause Analysis

A structured investigation to find the underlying reasons a defect occurs, using tools such as the 5 Whys, fishbone diagrams, and hypothesis testing, rather than treating symptoms.

Related: Fishbone Diagram, 5 Whys
Fishbone Diagram

A cause-and-effect diagram that organizes potential causes of a problem into branches, commonly people, method, machine, material, measurement, and environment, to guide data collection.

Related: Root Cause Analysis, 5 Whys
5 Whys

An iterative questioning technique that asks why repeatedly, typically five times, to move from a surface symptom down to an actionable underlying cause.

Related: Root Cause Analysis, Fishbone Diagram
Hypothesis Test

A statistical procedure that uses sample data to decide whether an observed difference or relationship is larger than expected from chance, reported with a test statistic and p-value.

Related: p-value, Type I Error
p-value

The probability of observing a result at least as extreme as the sample result if the null hypothesis were true; small values suggest the null hypothesis is unlikely.

Related: Hypothesis Test, Type I Error
Type I Error

Rejecting a true null hypothesis, that is, concluding a real difference or effect exists when it does not; its probability is the significance level alpha chosen for the test.

Related: Type II Error, p-value
Type II Error

Failing to reject a false null hypothesis, that is, missing a real difference or effect; its probability is beta, and one minus beta is the test's power.

Related: Type I Error, Sample Size
Regression Analysis

A modeling technique that fits an equation relating one or more input variables to a continuous output, used to quantify relationships and predict the effect of changing inputs.

Related: Design of Experiments (DOE), Hypothesis Test
Design of Experiments (DOE)

A planned approach to varying multiple factors together so their individual and interaction effects on a response can be estimated efficiently and with minimal runs.

Related: Regression Analysis, Screening Experiment
Screening Experiment

A fractional factorial design used early in improvement to test many factors with few runs, identifying the vital few that warrant fuller investigation.

Related: Design of Experiments (DOE), Main Effect
Main Effect

The change in a response caused by changing one factor across its levels, averaged over all levels of the other factors in the experiment.

Related: Interaction Effect, Design of Experiments (DOE)
Interaction Effect

A situation where the effect of one factor on the response depends on the level of another factor, so the factors cannot be interpreted in isolation.

Related: Main Effect, Design of Experiments (DOE)
Poka-Yoke

A mistake-proofing device or design that prevents an error from being made or makes it immediately obvious, rather than relying on operator attention or training.

Related: Standard Work, Kaizen
Kaizen

A continuous improvement practice in which teams make many small, rapid, low-cost changes to a process, often in a focused event lasting several days.

Related: PDCA Cycle, Poka-Yoke
PDCA Cycle

A repeating improvement loop of Plan, Do, Check, and Act that structures experimentation: plan a change, trial it, compare results to the aim, then standardize or adjust.

Related: Kaizen, Standard Work
Standard Work

Documented, agreed-upon methods and sequences for performing a task, including cycle time and work-in-process, forming the baseline that makes further improvement and control possible.

Related: Control Plan, Poka-Yoke
Control Plan

A document listing the process steps, the characteristics to monitor, the measurement method, sample size and frequency, control limits, and the response plan when out-of-control conditions occur.

Related: Control Chart, Standard Work
Rolled Throughput Yield (RTY)

The probability that a unit passes every process step without a defect, calculated as the product of each step's first-pass yield, revealing hidden rework between steps.

Related: Cost of Poor Quality (COPQ), Process Capability (Cp, Cpk)
Change Management

The planned approach to helping people adopt new processes, covering communication, training, sponsorship, resistance handling, and reinforcement so gains are sustained.

Related: Stakeholder Analysis, Standard Work