ICC R5 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Planning and Foundations

  • Map the building planning domain into a checklist of subtopics: occupancy classification, allowable height and area, fire separation distance, and foundation requirements

  • Locate and tabulate the code sections governing type of construction and allowable area increases so you can cite them without hunting

  • Work through at least 15 practice problems on occupancy classification and mixed-occupancy rules, writing the reasoning for each answer

  • Build a one-page reference sheet of key tables and definitions you will reuse all eight weeks

Your checkpoint

A completed building-planning subtopic checklist with code citations filled in for at least 80% of line items

Week 2

Building Planning and Foundations

  • Solve allowable height and area problems using both the tabular values and the frontage and sprinkler increase formulas

  • Explain the difference between fire separation distance and fire-resistance-rated separation in your own words, with two worked examples

  • Diagram foundation and footing requirements, including minimum depth, frost protection, and drainage

  • Complete a timed 25-question set on building planning and score your accuracy by subtopic

Your checkpoint

A scored 25-question practice set with a written error log identifying each missed concept and the code basis

Week 3

Floor, Wall, and Roof Construction

  • Outline floor, wall, and roof construction requirements by assembly type: light-frame, masonry, concrete, and steel

  • Summarize wall-bracing, anchorage, and load-path requirements and how they differ across construction types

  • Sketch typical floor and roof framing details and label the required connectors and fasteners

  • Work 15 practice problems on framing, cutting, notching, and boring limits for structural members

Your checkpoint

A hand-drawn or digital set of three labeled construction details (floor, wall, roof) with code citations for each labeled element

Week 4

Floor, Wall, and Roof Construction & Fire and Life Safety Provisions

  • Complete the construction-domain practice set and record accuracy by subtopic

  • Identify where wall and roof assemblies intersect with fire-resistance-rated construction requirements

  • List the fire-resistance rating requirements for structural elements by construction type and building element

  • Review all error logs from weeks 1 through 4 and re-study the three weakest subtopics

Your checkpoint

A mid-plan diagnostic summary showing per-domain accuracy percentages and a ranked list of your five weakest subtopics

Week 5

Fire and Life Safety Provisions

  • Map the life-safety provisions: means of egress components, occupant load, travel distance, and exit access

  • Calculate occupant loads and required egress width for at least five different occupancy scenarios

  • Compare the sprinkler, standpipe, and fire-alarm requirements that commonly appear on the exam

  • Explain separation, protection, and opening-protection requirements for fire-resistance-rated assemblies

Your checkpoint

Five fully worked occupant-load and egress-width calculations with diagrams showing travel distance and exit access

Week 6

General Requirements and Administration & Energy Efficiency and Interior Environment

  • Summarize administrative requirements: permits, inspections, plan review, and the responsibilities of the owner, designer, and contractor

  • Outline the energy-efficiency provisions for the building envelope, including insulation, fenestration, and air sealing

  • Describe interior-environment requirements for lighting, ventilation, and moisture control

  • Complete a 30-question mixed set covering administration and energy efficiency

Your checkpoint

A comparison table of permit, inspection, and administrative responsibilities plus a scored 30-question practice set

Week 7

Building Planning and Foundations & Floor, Wall, and Roof Construction & Fire and Life Safety Provisions

  • Take a full-length timed practice exam under exam conditions and record your score by domain

  • Review every missed question and write the correct reasoning and code reference for each

  • Re-drill the two heaviest domains until you reach at least 75% accuracy on each

  • Build a final one-page summary sheet for each of the five domains

Your checkpoint

A full-length practice exam score report with per-domain breakdown and a completed remediation log for every missed item

Week 8

General Requirements and Administration & Building Planning and Foundations & Floor, Wall, and Roof Construction & Energy Efficiency and Interior Environment & Fire and Life Safety Provisions

  • Re-take a second full-length practice exam and compare scores against week 7

  • Review only your summary sheets and error logs, not new material

  • Drill your remaining weak subtopics with short 10-question sets until accuracy exceeds 80%

  • Confirm exam-day logistics and finalize your reference-sheet memorization list

Your checkpoint

A final readiness report showing both practice exam scores, per-domain accuracy trends, and confirmation that every domain exceeds 70%

Milestones

Week 2: Can solve allowable height and area problems with frontage and sprinkler increases without referencing notes, at 70% or better accuracy

Week 4: Mid-plan diagnostic completed with per-domain accuracy recorded and the five weakest subtopics ranked

Week 6: All five domains have been studied at least once and a summary sheet exists for each

Week 7: Full-length practice exam passed at 70% or better overall with no domain below 60%

Week 8: Second full-length practice exam shows improvement over week 7 and every domain exceeds 70% accuracy