ICC Masonry Inspector S2 study materials
ICC Masonry Inspector S2 study resources

ICC Masonry Inspector S2 key terms

ICC Masonry Inspector S2 · Get comfortable with the vocabulary.

Masonry Prism

A small assemblage of masonry units and mortar built in a stack bond and tested in compression to estimate the compressive strength of the wall it represents.

Related: Compressive Strength (f'm), Masonry Assemblages, Test Report
Compressive Strength (f'm)

The specified design strength of masonry in compression, in psi or MPa, verified by prism tests or unit-and-mortar testing and used in structural calculations.

Related: Masonry Prism, Masonry Assemblages, Mortar Type
Masonry Assemblages

The permitted combinations of unit type, mortar type, and grout used to establish design compressive strength values when prism testing is not performed.

Related: Masonry Prism, Compressive Strength (f'm), Grout
Mortar Type

A classification (M, S, N, O, K) reflecting the proportions of cementitious materials, lime, and sand that determine mortar's strength, workability, and durability characteristics.

Related: Mortar Mix Ratio, Mortar Joint, Lime
Mortar Mix Ratio

The specified volumetric proportions of portland cement, lime, sand, and water used to produce a given mortar type; field batching must match the approved proportions.

Related: Mortar Type, Lime, Field Batch Testing
Lime

A cementitious material in masonry mortar that improves workability, water retention, and flexibility; hydrated lime is the common form used in field mixing.

Related: Mortar Type, Mortar Mix Ratio
Grout

A high-slump cementitious mixture placed into masonry cores or cavities to bond units, embed reinforcement, and increase wall strength and stiffness.

Related: Grout Lift, Grout Pour Height, Cleanout
Grout Lift

A single continuous placement of grout in a wall, limited in height by code so that voids, bridging, and segregation are avoided.

Related: Grout, Grout Pour Height, Consolidation
Grout Pour Height

The total height of grout placed in one operation, typically bounded by the lift height and the height of the wall being grouted.

Related: Grout Lift, Grout
Consolidation

The process of working grout or concrete with a vibrator or rod to remove entrapped air and ensure full contact with units and reinforcement.

Related: Grout Lift, Cleanout
Cleanout

An opening left at the bottom of a grouted cavity so mortar droppings and debris can be removed before grouting begins; it must be inspected and then sealed.

Related: Grout, Consolidation
Mortar Joint

The layer of mortar between masonry units; its thickness and profile affect bond, water penetration resistance, and compressive strength of the assembly.

Related: Head Joint, Bed Joint, Tooling
Bed Joint

The horizontal mortar joint between courses of masonry units; its thickness and fullness are critical to structural performance.

Related: Head Joint, Mortar Joint, Tooling
Head Joint

The vertical mortar joint between adjacent masonry units in the same course; it must be filled to develop required strength and weather resistance.

Related: Bed Joint, Mortar Joint
Tooling

Compacting and shaping the mortar surface with a tool while it is still workable, producing a dense, concave joint that sheds water.

Related: Mortar Joint, Bed Joint, Flashing
Flashing

Impervious material installed at wall bases, openings, and transitions to direct water out of the wall assembly and prevent moisture intrusion.

Related: Weep Hole, Tooling, Water-Resistive Barrier
Weep Hole

A small opening in the mortar joint above flashing that allows accumulated water in the wall cavity to drain to the exterior.

Related: Flashing, Water-Resistive Barrier
Water-Resistive Barrier

A membrane or coating applied behind masonry veneer to keep moisture from reaching framing and interior spaces.

Related: Flashing, Weep Hole
Masonry Veneer

A single wythe of masonry attached to a backing wall for appearance and weather protection, carrying little or no structural load.

Related: Water-Resistive Barrier, Anchor, Wall Tie
Anchor

A device that ties masonry veneer or a masonry wall to its backing or structural frame to resist out-of-plane and seismic forces.

Related: Wall Tie, Masonry Veneer
Wall Tie

A metal connector embedded in mortar joints that fastens a masonry wythe to the backing wall, spaced per code or approved plans.

Related: Anchor, Masonry Veneer
Reinforcement (Rebar)

Steel bars placed in grouted masonry cores or bond beams to resist tension and shear and to provide ductility.

Related: Grout, Bond Beam, Splice Length
Bond Beam

A grouted, horizontally reinforced masonry member built into a wall to provide continuity, tie the wall together, and resist lateral loads.

Related: Reinforcement (Rebar), Grout
Splice Length

The required overlap of reinforcing bars so that force transfers from one bar to the next; it depends on bar size, grout strength, and bar location.

Related: Reinforcement (Rebar), Bond Beam
Masonry Unit

A manufactured building block such as brick, concrete masonry unit, or stone used in masonry construction; units are classified by type and grade.

Related: Concrete Masonry Unit (CMU), Clay Brick, ASTM Standards
Concrete Masonry Unit (CMU)

A hollow or solid block of cementitious material, commonly 8 by 8 by 16 inches nominal, available in various weights and grades.

Related: Masonry Unit, ASTM Standards
Clay Brick

A fired clay masonry unit classified by grade and type for exposure and use; absorption and compressive strength affect selection.

Related: Masonry Unit, ASTM Standards
ASTM Standards

Consensus technical specifications, such as those for masonry units, mortar, and grout, that define material properties and test methods referenced by building codes.

Related: Masonry Unit, Test Report
Field Batch Testing

Sampling and testing of mortar or grout as mixed on site to verify that proportions and properties meet the approved submittals.

Related: Mortar Mix Ratio, Test Report
Test Report

A document recording sample identification, test method, results, and laboratory information for materials or assemblies submitted to the building official.

Related: Masonry Prism, Field Batch Testing
Approved Plans

Construction documents that have been reviewed and stamped by the building official and must be kept on site and followed during inspection.

Related: Permit Application, Plan Review, Change Order
Permit Application

The submitted package of forms, plans, and supporting calculations requesting authorization to perform masonry construction work.

Related: Approved Plans, Plan Review
Plan Review

The building department's examination of construction documents for compliance with adopted codes before a permit is issued.

Related: Permit Application, Approved Plans
Change Order

A written modification to approved construction documents; for code purposes it must be documented and, where required, re-reviewed before the work proceeds.

Related: Approved Plans, Plan Review
Special Inspection

Inspection by a qualified inspector of critical masonry work such as grouting, reinforcement placement, and testing, required where the code or plans specify it.

Related: Statement of Special Inspection, Inspection Report, Hold Point
Statement of Special Inspection

A document identifying the elements requiring special inspection and the qualifications of the inspector and testing agency, submitted with the permit application.

Related: Special Inspection, Permit Application
Inspection Report

The inspector's written record of observations, tests, deviations, and corrective actions, submitted to the building official and contractor.

Related: Special Inspection, Nonconformance
Nonconformance

Work or material that does not comply with approved plans or code; it must be documented and corrected or resolved through an approved process.

Related: Inspection Report, Stop-Work Order
Stop-Work Order

A written directive from the building official halting work that is unsafe or not in compliance until the issue is resolved.

Related: Nonconformance, Notice of Violation
Notice of Violation

A formal written notice from the code authority describing a violation, the corrective action required, and the deadline for compliance.

Related: Stop-Work Order, Nonconformance
Hold Point

A stage of work that must be inspected and approved before the next phase may proceed, such as grouting after reinforcement inspection.

Related: Special Inspection, Inspection Report
Certificate of Occupancy

A document issued by the building official confirming that completed work complies with approved plans and may be occupied for its intended use.

Related: Approved Plans, Final Inspection
Final Inspection

The last inspection verifying that all permitted work is complete and compliant before a certificate of occupancy is issued.

Related: Certificate of Occupancy, Inspection Report