Administration and General Requirements

  • A plumbing permit is required before installation, alteration, or replacement of a plumbing system; stopping leaks, clearing stoppages, and repairing existing fixtures or valves generally do not require a permit.

  • DWV water test: hold a 10-foot (3,048 mm) head of water for 15 minutes; DWV air test: maintain 5 psi (34.5 kPa) gauge pressure for 15 minutes.

  • Water distribution test: fill with potable water, raise to not less than the working pressure, and hold for 15 minutes with no leakage.

  • Building sewer test: use the same 10-foot water head or 5 psi air test for 15 minutes as for DWV piping.

  • Rough-in and final inspections are required; piping must not be concealed before the rough-in inspection is approved.

  • In flood hazard areas, plumbing fixtures, equipment, and connections must be installed to minimize flood damage and at the required elevation.

  • Occupant load and occupancy classification determine the minimum fixture count using the code fixture table.

  • Water service and building sewer separation: not less than 5 feet (1,524 mm) horizontally, and water pipe at least 12 inches (305 mm) above sewer at crossings.

Quick reference

Fixtures and Fixture Fittings

  • Water closet spacing: at least 15 inches (381 mm) from centerline to any side wall or partition, with at least 30 inches (762 mm) of clear width.

  • Drainage fixture unit (DFU) values include water closet 3, lavatory 1, bathtub or shower 2, kitchen sink 2, and washing machine 3.

  • Water closets are limited to an average flush volume of 1.6 gallons (6 L) per flush.

  • Lavatory and kitchen faucets are limited to 2.2 gpm (8.3 L/min) at 60 psi; showerheads are limited to 2.5 gpm (9.5 L/min) at 80 psi.

  • Each fixture must be separately trapped, except fixtures with integral traps or listed combination fixtures.

  • Minimum fixture counts are based on occupancy classification and occupant load, with separate facilities for each sex where required.

  • Accessible fixtures require clear floor space and mounting heights; ICC A117.1 applies where accessible design is required.

  • A fixture's trap arm length and vent size depend on the fixture drain size and the slope of the trap arm.

Quick reference

Water Heaters

  • Temperature and pressure relief valve: set to open at not more than 210°F (99°C) and 150 psi (1,034 kPa), and rated for the heater's capacity.

  • T&P discharge pipe: full-size, gravity flow, no traps, no valves, terminating not more than 6 inches (152 mm) above the floor or waste receptor.

  • Drain pan: at least 1.5 inches (38 mm) deep, at least 1.5 inches larger than the heater diameter, with a 3/4-inch (19 mm) drain.

  • Closed water system: thermal expansion tank or expansion control is required where a backflow preventer or check valve creates a closed system.

  • Garage installation: water heaters with ignition sources must be elevated 18 inches (457 mm) above the floor unless listed as flammable vapor ignition resistant.

  • Combustion air: confined spaces require two permanent openings sized per the combustion air provisions of the code.

  • Relief valve discharge must not be trapped or reduced, and the pipe material must be rated for the temperature and pressure.

  • Water heaters must be accessible for inspection, service, and relief valve replacement.

Quick reference

Water Supply and Distribution

  • Maximum static pressure: 80 psi (552 kPa); a pressure-reducing valve is required where static pressure exceeds 80 psi.

  • Minimum residual pressure at fixtures: 8 psi (55 kPa) under peak demand conditions.

  • Water service pipe must be protected from freezing and buried below the local frost depth.

  • Backflow protection: air gap, reduced-pressure zone assembly, double check valve, or vacuum breaker, selected by hazard level at each cross-connection.

  • Water hammer arrestors are installed at quick-closing valves, solenoid valves, and laundry equipment.

  • Sizing uses water supply fixture units (WSFU) and developed length, including fitting allowances from the code tables.

  • A pressure booster is required where the available supply cannot meet the minimum fixture pressure.

  • Hot and cold water piping must be supported and protected from freezing, corrosion, and damage in concealed locations.

Quick reference

Sanitary Drainage

  • Slope: 1/4 inch per foot (2%) for pipe 2.5 inches and smaller; 1/8 inch per foot (1%) for pipe 3 inches and larger.

  • Cleanouts: required at the base of each stack, at changes of direction greater than 45 degrees, and at intervals not exceeding 100 feet (30,480 mm) in horizontal drains.

  • Horizontal 90-degree turns: use two 45-degree fittings or a long-radius bend; short-radius 90-degree fittings are prohibited in horizontal drainage.

  • A backwater valve is required where drainage fixtures are below the level of the next upstream manhole cover.

  • Building drain and building sewer minimum size is 4 inches (102 mm).

  • Drainage fixture units (DFU) are used to size building drains, sewers, stacks, and horizontal branches.

  • Sumps and sewage ejectors are required for below-grade fixtures that cannot drain by gravity.

  • Drainage piping must be tested and protected from freezing, corrosion, and structural damage.

Quick reference

Vents and Venting

  • Every trap must be vented, except listed exceptions such as some integral traps and combination fixtures.

  • Vent pipe must be not less than 1 1/4 inches (32 mm) nominal diameter.

  • Trap arm length at 1/4 inch per foot slope: 1 1/4-inch = 5 feet, 1 1/2-inch = 6 feet, 2-inch = 8 feet, 3-inch = 12 feet, 4-inch = 16 feet.

  • Vent terminals extend not less than 6 inches (152 mm) above the roof surface and above anticipated snow accumulation.

  • A vent must not serve as a drain; no trap or obstruction is permitted on a vent.

  • Vertical wet vent must be at least 2 inches (51 mm); bathroom group wet venting is permitted under code conditions.

  • Air admittance valves: not more than one per branch, installed in an accessible location, and not where positive pressure occurs.

  • A vent stack must extend to the outdoors and terminate above the roof; it may combine with a stack vent.

Quick reference

Traps, Interceptors and Special Wastes

  • Trap seal: at least 2 inches (51 mm) and not more than 4 inches (102 mm) of water seal.

  • Prohibited traps: S-traps, bell traps, crown vents, and drum traps; use P-traps or listed traps.

  • Each fixture is separately trapped, except fixtures with integral traps or listed combinations.

  • Grease interceptors are required for commercial food preparation; they are not required for dwelling units and must be accessible and vented.

  • Sand and oil interceptors are required for repair garages, car washes, and similar discharges.

  • Trap primers are required for floor drains and traps subject to evaporation to maintain the trap seal.

  • Corrosive, hot, or high-temperature special wastes require neutralization, cooling, or dilution before discharge.

  • Interceptor sizing is based on flow rate and retention time; grease interceptor capacity may be based on fixture units or gallons per minute.

Quick reference

Storm Drainage and Fuel Gas Piping

  • Storm drainage must be separate from sanitary drainage; no storm connection to the sanitary sewer is permitted.

  • Roof drains and leaders are sized using roof area, local design rainfall rate, and the code sizing table.

  • Secondary roof drainage, such as overflow scuppers or drains, is required to prevent ponding if primary roof drains become blocked.

  • Roof drain strainers must be provided and sized to handle the design flow.

  • Fuel gas piping is sized by the longest-length or branch-length method using Btu/hr load, pipe length, and allowable pressure drop.

  • A sediment trap (drip leg) is required at each appliance inlet, installed downstream of the shutoff valve.

  • A manual shutoff valve is required upstream of each appliance, in the same room, within 6 feet (1,829 mm) of the appliance.

  • Fuel gas piping test: not less than 3 psi (20.7 kPa) for 10 minutes, or 1.5 times the working pressure if higher; unions are prohibited in concealed locations.

Quick reference

Storm Drainage and Fuel Gas Piping

  • Storm drainage must be separate from sanitary drainage; no storm connection to the sanitary sewer is permitted.

  • Roof drains and leaders are sized using roof area, local design rainfall rate, and the code sizing table.

  • Secondary roof drainage, such as overflow scuppers or drains, is required to prevent ponding if primary roof drains become blocked.

  • Roof drain strainers must be provided and sized to handle the design flow.

  • Fuel gas piping is sized by the longest-length or branch-length method using Btu/hr load, pipe length, and allowable pressure drop.

  • A sediment trap (drip leg) is required at each appliance inlet, installed downstream of the shutoff valve.

  • A manual shutoff valve is required upstream of each appliance, in the same room, within 6 feet (1,829 mm) of the appliance.

  • Fuel gas piping test: not less than 3 psi (20.7 kPa) for 10 minutes, or 1.5 times the working pressure if higher; unions are prohibited in concealed locations.

Quick reference

Storm Drainage and Fuel Gas Piping

  • Storm drainage must be separate from sanitary drainage; no storm connection to the sanitary sewer is permitted.

  • Roof drains and leaders are sized using roof area, local design rainfall rate, and the code sizing table.

  • Secondary roof drainage, such as overflow scuppers or drains, is required to prevent ponding if primary roof drains become blocked.

  • Roof drain strainers must be provided and sized to handle the design flow.

  • Fuel gas piping is sized by the longest-length or branch-length method using Btu/hr load, pipe length, and allowable pressure drop.

  • A sediment trap (drip leg) is required at each appliance inlet, installed downstream of the shutoff valve.

  • A manual shutoff valve is required upstream of each appliance, in the same room, within 6 feet (1,829 mm) of the appliance.

  • Fuel gas piping test: not less than 3 psi (20.7 kPa) for 10 minutes, or 1.5 times the working pressure if higher; unions are prohibited in concealed locations.

Quick reference

Storm Drainage and Fuel Gas Piping

  • Storm drainage must be separate from sanitary drainage; no storm connection to the sanitary sewer is permitted.

  • Roof drains and leaders are sized using roof area, local design rainfall rate, and the code sizing table.

  • Secondary roof drainage, such as overflow scuppers or drains, is required to prevent ponding if primary roof drains become blocked.

  • Roof drain strainers must be provided and sized to handle the design flow.

  • Fuel gas piping is sized by the longest-length or branch-length method using Btu/hr load, pipe length, and allowable pressure drop.

  • A sediment trap (drip leg) is required at each appliance inlet, installed downstream of the shutoff valve.

  • A manual shutoff valve is required upstream of each appliance, in the same room, within 6 feet (1,829 mm) of the appliance.

  • Fuel gas piping test: not less than 3 psi (20.7 kPa) for 10 minutes, or 1.5 times the working pressure if higher; unions are prohibited in concealed locations.

Quick reference

Storm Drainage and Fuel Gas Piping

  • Storm drainage must be separate from sanitary drainage; no storm connection to the sanitary sewer is permitted.

  • Roof drains and leaders are sized using roof area, local design rainfall rate, and the code sizing table.

  • Secondary roof drainage, such as overflow scuppers or drains, is required to prevent ponding if primary roof drains become blocked.

  • Roof drain strainers must be provided and sized to handle the design flow.

  • Fuel gas piping is sized by the longest-length or branch-length method using Btu/hr load, pipe length, and allowable pressure drop.

  • A sediment trap (drip leg) is required at each appliance inlet, installed downstream of the shutoff valve.

  • A manual shutoff valve is required upstream of each appliance, in the same room, within 6 feet (1,829 mm) of the appliance.

  • Fuel gas piping test: not less than 3 psi (20.7 kPa) for 10 minutes, or 1.5 times the working pressure if higher; unions are prohibited in concealed locations.