ICC P1 study materials
ICC P1 study resources

ICC P1 study plan

ICC P1 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Administration and General Requirements

  • Map the IPC administrative sequence - permit application, plan review, rough-in inspection, final inspection - into a one-page flowchart keyed to specific section numbers.

  • Classify ten common materials and methods as listed, labeled, or requiring alternate-materials approval, citing the section that governs each one.

  • Compile a table of the standards adopted by reference, noting which edition of each standard applies and where it is invoked in the body of the code.

  • Work 20 permit, inspection, and approval scenarios and annotate every miss with the exact section that resolves it.

Your checkpoint

A tabbed one-page permit-and-inspection flowchart, a 20-row referenced-standards table, and a scenario log scoring at least 80% on the 20 permit/administration items.

Week 2

Water Supply and Distribution

  • Size a cold-water branch line end-to-end using the fixture-unit table, developed-length method, and pressure-loss tables, showing each calculation step.

  • Verify residual pressure at the most remote outlet for three layouts and adjust pipe diameter until each one passes.

  • Identify every location on those layouts where backflow protection is required, then match each hazard to an approved device type.

  • Sequence the hydrostatic test for new water piping, stating test pressure, hold duration, allowable leakage, and who witnesses it.

  • Tabulate approved pipe, fitting, and joint methods for at least five water distribution materials, including solvent cement and press connections.

Your checkpoint

Three fully worked sizing calculations with sketches, plus a one-page backflow device selection matrix and a water piping test procedure sheet.

Week 3

Sanitary Drainage

  • Calculate drainage fixture units for a two-story layout and convert the total to building drain and building sewer size using the drainage tables.

  • Assign slope, cleanout spacing, and change-of-direction rules to each horizontal branch and justify every choice with a citation.

  • Locate where backwater valves, sump pumps, and subsoil drains are mandatory on the same layout.

  • Describe the water or air test of the drainage system - hydrostatic head, duration, and acceptance criteria - in inspection-ready language.

  • Compare five prohibited fittings and fitting patterns against the approved drainage fittings they are commonly confused with.

Your checkpoint

A marked-up DWV isometric for a two-story building with pipe sizes, slopes, cleanout locations, and backwater valve positions annotated and cited.

Week 4

Vents and Venting

  • Determine the maximum trap-to-vent distance for every fixture on your isometric at both 1/4 inch and 1/8 inch per foot slope.

  • Size a vent stack and stack vent from a stated fixture-unit load using the vent sizing tables.

  • Differentiate wet vent, common vent, circuit vent, and air admittance valve applications and state the limits on each.

  • Draw five venting details, three compliant and two defective, and write the inspection correction for each defect.

Your checkpoint

A vent-sizing worksheet covering every fixture on the two-story layout, plus a 40-item timed mixed set across Domains 1, 4, 5, and 6 scored at 75% or higher.

Week 5

Fixtures and Fixture Fittings

  • Compute minimum fixture counts for a restaurant and an office using occupant load and the minimum fixture ratio table.

  • Verify clearance, privacy, and mounting-height dimensions for water closets, lavatories, and urinals against the code and the referenced accessibility standard.

  • Specify installation requirements for floor drains, drinking fountains, and dishwashing equipment in a written inspection note.

  • Confirm fixture-unit values and trap sizes for ten common fixtures and flag any mismatch between the trap size and the fixture outlet.

Your checkpoint

A fixture-count worksheet for two occupancies plus a 10-fixture table of fixture units, trap sizes, and clearances, all with section citations.

Week 6

Water Heaters & Traps, Interceptors and Special Wastes

  • Trace the temperature-and-pressure relief valve discharge path from valve to termination and list five installation errors that would fail inspection.

  • Size combustion air openings for a water heater in a confined space using the two-permanent-opening method.

  • Apply seismic strapping, drain pan, and clearance-to-combustibles requirements to a hand-drawn heater installation sketch.

  • Verify trap seal depth, trap arm length, and prohibited trap configurations across five plumbing details.

  • Size a grease interceptor from a stated fixture load and describe its flow-control fitting and venting requirements.

Your checkpoint

Two inspection checklists - one for water heater installations and one for traps and grease interceptors - each with at least 12 section-cited items.

Week 7

Storm Drainage and Fuel Gas Piping

  • Size roof drains, leaders, and the building storm sewer for a given roof area and rainfall rate, including the secondary drainage system.

  • Determine scupper, overflow, and trapped-versus-untrapped roof drain requirements for a flat-roof detail.

  • Size a fuel gas branch line with the longest-length method for both natural gas and liquefied petroleum gas at the same appliance load.

  • Specify sediment trap, shutoff valve, union, and connector locations for a gas appliance connection on a sketch.

  • State the pressure test requirements for fuel gas piping at medium and high pressure, including test medium and hold time.

Your checkpoint

A storm drainage sizing sheet and a gas pipe sizing worksheet side by side, both showing the table entries used for each step.

Week 8

Administration and General Requirements & Fixtures and Fixture Fittings & Water Heaters & Water Supply and Distribution & Sanitary Drainage & Vents and Venting & Traps, Interceptors and Special Wastes & Storm Drainage and Fuel Gas Piping

  • Complete three timed 60-item practice exams and log every miss by domain and code section.

  • Re-study only the domains that scored below 80%, reworking each missed item to a corrected answer with a citation.

  • Rebuild the Week 1 permit-and-inspection flowchart from memory and reconcile every difference against the original.

  • Assemble a one-page index of the 40 most frequently missed citations for a final pass the morning of the exam.

Your checkpoint

A final timed exam scoring 80% or higher with a remediation log showing every missed item resolved to a cited code section.

Milestones

Week 2: Explain the permit-to-final-inspection sequence without notes and pass a 20-item water supply set at 80%, including one full pipe sizing calculation done cold.

Week 4: Produce a complete DWV isometric with sizes, slopes, cleanouts, and vent distances from memory in under 30 minutes, and score 75% or higher on the 40-item mixed set for Domains 1, 4, 5, and 6.

Week 6: Pass a 30-item set covering water heaters, traps, and interceptors at 80%, and correctly identify all five planted errors in a self-drawn water heater detail.

Week 8: Score 80% or higher on three consecutive timed 60-item full-scope exams, with no domain below 70% on the last attempt.