ICC B1 study materials
ICC B1 study resources

ICC B1 study plan

ICC B1 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Roof and Ceiling Construction & Roof Coverings, Chimneys, and Fireplaces

  • Trace the load path of a roof/ceiling assembly from ceiling joist through rafter to ridge, labeling each member and the point at which it must be inspected before concealment.

  • Build a personal lookup table for rafter and ceiling-joist span limits, notch and boring restrictions, and fastening schedules, then solve 10 framing scenarios using only that table.

  • Distinguish when a rafter tie, collar tie, ridge strap, or purlin is required, and write a two-sentence justification for each condition in your own words.

  • Rank the ten most common roof-framing inspection failures by frequency and pair each with the specific correction an inspector would write.

Your checkpoint

A one-page roof-framing inspection checklist plus 10 solved span-and-notch scenarios, each scored against the code text and every miss rewritten correctly.

Week 2

Roof Coverings, Chimneys, and Fireplaces & Roof and Ceiling Construction

  • Classify roof-covering materials by minimum slope, underlayment requirement, and attachment method, recording the threshold values for each class in a comparison grid.

  • Sketch a chimney cross-section showing clearance to combustibles, height relative to the roof surface, flashing, and spark-arrestor details, annotating each dimension requirement.

  • Sequence the inspection steps for a masonry fireplace and flue from foundation through termination, noting what must be verified at each stage.

  • Solve 15 mixed roof-covering and chimney scenarios and cite the basis for every answer.

Your checkpoint

A self-written 30-question quiz covering Domains 6 and 7, taken closed-book, scored at 80% or higher with an error log.

Week 3

Footings and Foundations & Floor Construction

  • Determine footing width, thickness, and bearing depth for three given soil and load conditions, showing the table lookup and the arithmetic.

  • Diagram foundation drainage, dampproofing, and waterproofing requirements and mark where each applies on a below-grade wall.

  • Calculate allowable floor-joist spans, cantilever limits, and bearing lengths for four framing layouts, then check each against notch and hole restrictions.

  • Verify crawl-space access, ventilation, and clearance provisions for two sample floor assemblies and list any deficiency found.

Your checkpoint

An annotated foundation-to-floor cross-section drawing plus 25 practice questions on Domains 3 and 4, scored at 80% or higher.

Week 4

Floor Construction & Wall Construction, Wall Coverings, and Exterior Finishes

  • Explain how floor framing connects to wall framing at bearing points, and identify the inspection hold points where that connection is verified.

  • Evaluate wall-framing details for stud spacing, header sizing, lateral bracing, and fireblocking across four sample wall sections.

  • Compare interior and exterior wall-covering requirements, including weather-resistive barrier, flashing integration, and clearance from grade for each exterior finish.

  • Convert eight field scenarios into pass or correction rulings, citing the requirement behind each ruling.

Your checkpoint

A cumulative 40-question timed test covering Domains 6, 7, 3, and 4, scored at 75% or higher, with each missed item traced to its governing requirement.

Week 5

Wall Construction, Wall Coverings, and Exterior Finishes & Code Administration and Inspection Process

  • Assemble a wall-construction inspection checklist that covers framing, sheathing, flashing, and exterior finish termination in inspection order.

  • Outline the permit-to-certificate-of-occupancy workflow and identify where plan review, rough inspection, and final inspection sit within it.

  • Distinguish the inspector's authority from the designer's or contractor's responsibility, and describe when a correction notice, stop-work order, or approval is the correct action.

  • Resolve ten administrative scenarios involving altered plans, field changes, and re-inspection, recording the correct procedural response.

Your checkpoint

A process flowchart of the inspection life cycle plus a 20-item wall-construction flash-card set, both reviewed against the code text with no unresolved gaps.

Week 6

Building Planning and Light/Ventilation Requirements & Code Administration and Inspection Process

  • Compute required light and ventilation openings for four rooms of given size and occupancy, then state whether each design complies.

  • Evaluate emergency escape and rescue openings and egress paths for three floor plans, checking sill height, clear opening, and travel distance.

  • Check stairway, guard, and handrail geometry in two sample plans against width, headroom, riser, and tread requirements.

  • Summarize how planning provisions connect to the inspection process so that a plan-review comment and a field correction cite the same requirement.

Your checkpoint

A completed plan-review worksheet on two sample floor plans with at least 12 written findings, each tagged by domain and requirement.

Week 7

Roof and Ceiling Construction & Roof Coverings, Chimneys, and Fireplaces & Wall Construction, Wall Coverings, and Exterior Finishes & Code Administration and Inspection Process & Building Planning and Light/Ventilation Requirements & Footings and Foundations & Floor Construction

  • Rank all seven domains by your measured accuracy to date and allocate study time in inverse order to that ranking.

  • Take two 50-question timed mixed sets under exam conditions, then categorize every miss by domain and by error type: lookup, misread, or knowledge gap.

  • Rewrite each missed item as a single-sentence rule you can recall without the code book, and re-test yourself on those rules 48 hours later.

  • Rehearse locating a requirement in the code book within 30 seconds for five randomly chosen topics.

Your checkpoint

An error log covering both mixed sets with every miss reclassified and rewritten, plus a one-page weak-area summary naming your three lowest-scoring topics.

Week 8

Roof and Ceiling Construction & Roof Coverings, Chimneys, and Fireplaces & Wall Construction, Wall Coverings, and Exterior Finishes & Code Administration and Inspection Process & Building Planning and Light/Ventilation Requirements & Footings and Foundations & Floor Construction

  • Complete two full-length timed mock exams under exam conditions, simulating the actual question count and time limit.

  • Review only your error log and weak-area summary, correcting residual gaps rather than re-reading broadly.

  • Condense all domain notes into a single one-page recall sheet organized by inspection sequence.

  • Verify exam-day logistics and rehearse your lookup strategy for unfamiliar questions.

Your checkpoint

A final mock exam scored at 80% or higher, with a corrected one-page recall sheet and a written list of the five rules you most often forgot.

Milestones

Week 2: Domain 6 and 7 quiz taken closed-book at 80% or higher, with every miss written up as a corrected rule.

Week 4: Cumulative timed test across Domains 6, 7, 3, and 4 at 75% or higher, with each miss traced to its governing requirement.

Week 6: All seven domains covered at least once; two sample plans reviewed with 12 or more written findings, each tagged by domain.

Week 8: Two full-length timed mocks completed, the higher score at 80% or higher, and the error log showing no domain below 70%.