ICRI CSMT key terms
ICRI CSMT · Get comfortable with the vocabulary.
- equilibrium relative humidity (ERH)
- Related: in-situ probe method, pore water, moisture equilibrium
The stabilized relative humidity inside a sealed concrete slab hole after the material has equalized with the surrounding pore air, expressed as percent RH at a stated temperature and reported per ASTM F2170.
- in-situ probe method
- Related: equilibrium relative humidity (ERH), hole depth and conditioning, ASTM F2170
A field procedure that drills holes to a specified depth, lines them with a sleeve, seals the top, and inserts an electronic humidity sensor to measure internal RH after equilibration.
- ASTM F2170
- Related: in-situ probe method, hole depth and conditioning, equilibrium relative humidity (ERH)
Standard test method for determining relative humidity in concrete floor slabs using in-situ probes; it specifies hole diameter, depth, conditioning time, sensor accuracy, and reporting.
- hole depth and conditioning
- Related: ASTM F2170, in-situ probe method
The required depth of the drilled test hole below the slab surface and the minimum time the sealed hole must sit before measurement, allowing the hole to reach moisture equilibrium with the concrete.
- calcium chloride test
- Related: ASTM F1869, moisture vapor emission rate (MVER), surface-area dependence
A field test that seals a dish of hygroscopic calcium chloride to the slab surface and measures the mass of moisture absorbed over a set period, reported as emission rate.
- ASTM F1869
- Related: calcium chloride test, moisture vapor emission rate (MVER)
Standard test method for measuring moisture vapor emission rate of concrete subfloor using anhydrous calcium chloride; defines specimen preparation, exposure duration, weighing, and calculation.
- moisture vapor emission rate (MVER)
- Related: calcium chloride test, ASTM F1869
The mass of water vapor leaving a concrete surface per unit area per unit time, typically expressed in pounds per 1000 square feet per 24 hours under the calcium chloride test conditions.
- surface-area dependence
- Related: calcium chloride test, ASTM F1869
The tendency of calcium chloride emission results to be influenced by the exposed dish area and slab conditions, so results from kits of differing dimensions are not directly interchangeable.
- surface moisture meter
- Related: ASTM F2659, comparative reading, non-destructive testing
A handheld electrical instrument placed on the concrete surface that infers moisture content from electrical impedance, capacitance, or resistance changes, giving relative rather than absolute values.
- ASTM F2659
- Related: surface moisture meter, comparative reading
Standard guide for preliminary evaluation of comparative moisture conditions of concrete slabs using non-destructive electrical impedance or capacitance meters, intended for screening rather than acceptance.
- ASTM F2420
- Related: hood method, relative humidity at surface, ASTM F2170
Standard test method for determining relative humidity on the surface of concrete floor slabs using a sealed insulated hood enclosing a humidity sensor, measuring near-surface conditions.
- hood method
- Related: ASTM F2420, relative humidity at surface
A procedure that places an insulated enclosure with a humidity sensor against the slab surface and seals the perimeter, allowing trapped air to equilibrate with the concrete surface.
- comparative reading
- Related: surface moisture meter, ASTM F2659
A measurement whose value is meaningful mainly when compared with other readings from the same instrument on the same slab, not as an absolute moisture content.
- relative humidity at surface
- Related: ASTM F2420, hood method, equilibrium relative humidity (ERH)
The humidity of air immediately above or trapped against a concrete surface, which reflects near-surface drying conditions and can differ from internal slab humidity.
- pore water
- Related: capillary action, water-cement ratio, equilibrium relative humidity (ERH)
Water held within the capillary and gel pores of hardened concrete, which drives internal relative humidity and moves by diffusion, capillary flow, and vapor transport.
- capillary action
- Related: pore water, permeability
The movement of water through fine interconnected pores driven by surface tension, drawing moisture upward or laterally through concrete and toward drier zones.
- water-cement ratio
- Related: pore water, permeability, curing
The mass ratio of water to cementitious material in a concrete mix; higher values increase porosity, permeability, and the amount of free water available to evaporate.
- permeability
- Related: capillary action, water-cement ratio
A measure of how readily fluids pass through concrete under a pressure gradient; it depends on pore structure, cracks, and mix design and controls moisture migration rates.
- curing
- Related: water-cement ratio, drying time
The controlled maintenance of moisture and temperature in fresh concrete to allow cement hydration; proper curing lowers porosity and reduces later moisture release.
- drying time
- Related: curing, moisture equilibrium
The period after concrete placement during which excess water evaporates before a moisture-sensitive floor covering is installed; it depends on thickness, mix, curing, and environment.
- moisture equilibrium
- Related: drying time, equilibrium relative humidity (ERH)
The state in which water movement within concrete and between concrete and its surroundings has stabilized, so measured humidity or emission values no longer change materially over time.
- vapor retarder
- Related: permeability, moisture vapor transmission
A sheet or coating placed beneath or on a slab to limit water vapor movement; when below the slab it reduces upward moisture drive from the subgrade.
- moisture vapor transmission
- Related: vapor retarder, moisture vapor emission rate (MVER)
The general movement of water vapor through a material driven by vapor pressure differences, distinct from liquid water flow and often expressed as a rate.
- scheduling of tests
- Related: site conditions, drying time, equilibrium relative humidity (ERH)
Timing moisture tests after concrete has reached a representative condition, after curing and cleaning, and before floor covering installation, while allowing the required sensor conditioning period.
- site conditions
- Related: scheduling of tests, drying time
The ambient temperature, humidity, ventilation, and building enclosure status present during testing and drying, which influence measured values and must be documented.
- test method selection
- Related: ASTM F2170, ASTM F1869, ASTM F2659
The process of choosing moisture tests based on slab type, floor covering requirements, project stage, and whether quantitative internal RH or surface emission data is needed.
- sampling plan
- Related: test method selection, documentation
A documented layout defining the number and location of test points to represent the slab, including areas of different thickness, exposure, or construction history.
- documentation
- Related: reporting, sampling plan, calibration
The complete record of methods, instruments, calibration, test locations, conditions, readings, and deviations that allows results to be verified and interpreted later.
- reporting
- Related: documentation, interpretation of results
The formal presentation of test results including method standard, units, test locations, dates, ambient conditions, instrument data, and any limitations or exceptions.
- interpretation of results
- Related: reporting, manufacturer moisture limit
The reasoned comparison of measured moisture values with specification limits and product requirements, accounting for method differences, variability, and site conditions.
- calibration
- Related: documentation, in-situ probe method
The verification of instrument accuracy against known references at defined intervals, with records kept to demonstrate that measurements are traceable and trustworthy.
- manufacturer moisture limit
- Related: interpretation of results, moisture-sensitive flooring
The maximum moisture condition, stated as RH or emission rate, at which a flooring or coating manufacturer permits installation of its product over concrete.
- moisture-sensitive flooring
- Related: manufacturer moisture limit, vapor retarder
Floor coverings such as resilient sheet, rubber, wood, and some coatings that can be damaged by trapped moisture, including adhesive failure, blistering, cupping, or mold growth.
- moisture mitigation system
- Related: vapor retarder, manufacturer moisture limit
A product or assembly, such as a topical vapor barrier or self-leveling underlayment, applied to reduce moisture emission before installing a moisture-sensitive floor covering.
- conflict of interest
- Related: professional practice, documentation
A situation in which an inspector's financial or personal interests could bias test results or reporting; it must be disclosed and managed to preserve objectivity.
- professional practice
- Related: conflict of interest, interpretation of results
Acting within one's competence, following applicable standards, maintaining impartiality, and communicating results honestly, including acknowledging uncertainty and method limitations.
- chain of custody
- Related: documentation, calibration
A documented record tracking test samples, instruments, or data from collection through reporting, supporting integrity and traceability of results.