ICRI CSMT study materials
ICRI CSMT study resources

ICRI CSMT study plan

ICRI CSMT · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Moisture in Concrete: Sources, Transport, and Effects

  • Distinguish the four concrete moisture sources (residual free water, vapor from below, construction water, ambient/hygroscopic effects) and explain which ones drive slab drying time

  • Describe the difference between liquid water transport (capillary, permeation) and vapor transport (diffusion, evaporation) and how slab thickness and finish affect drying rate

  • Explain how water-to-cement ratio, aggregate type, curing method, admixtures, and surface treatments change drying behavior and moisture profiles

  • Define moisture content, relative humidity, and moisture vapor emission rate and state the units and physical meaning of each

  • Identify which field conditions (on-grade vs elevated, vapor retarder presence, slab age) most strongly predict elevated moisture

Your checkpoint

A one-page concept map linking moisture sources to transport mechanisms to measurable quantities (RH, MC, MVER), with units and typical ranges noted for each

Week 2

Moisture in Concrete: Sources, Transport, and Effects & ASTM F2170 In-Situ Relative Humidity Testing

  • Explain the equilibrium principle behind in-situ RH testing and why depth of measurement matters

  • Describe the physical setup of ASTM F2170: hole depth, hole diameter, sleeve, cap, probe, and equilibration time

  • Calculate the correct measurement depth for a slab on grade versus an elevated slab and justify the choice

  • Interpret an RH profile across depths and explain what a steep gradient signals about drying stage

  • List common field errors in F2170 (shallow holes, insufficient equilibration, wrong probe, contaminated holes) and their effect on readings

Your checkpoint

A worked calculation sheet showing correct F2170 hole depth and equilibration time for three slab scenarios (on-grade, elevated, thick slab), with justification for each

Week 3

ASTM F2170 In-Situ Relative Humidity Testing

  • List the ASTM F2170 required number and spacing of test locations for a given floor area and justify them

  • Describe probe calibration and verification steps and how to document them

  • Explain how temperature, ambient conditions, and HVAC operation during testing affect F2170 readings

  • Interpret F2170 results against common flooring manufacturer thresholds and explain why a single reading is insufficient

  • Plan a sampling layout for an irregular floor plan with multiple pours

Your checkpoint

A complete F2170 test plan for a 5,000 sq ft slab with a marked layout, hole depths, equilibration schedule, and pass/fail criteria referenced to a stated flooring product threshold

Week 4

ASTM F1869 Calcium Chloride Moisture Vapor Emission Testing

  • Explain the principle of the calcium chloride test and what MVER physically measures

  • Describe the ASTM F1869 procedure: surface preparation, dish placement, sealing, exposure time, and weighing

  • Calculate MVER from the measured mass change, dish area, and exposure time, and state the units

  • Identify the conditions that invalidate an F1869 test (surface contamination, adhesive residue, curing compounds, improper sealing)

  • Compare F1869 and F2170 in terms of what each measures and when each is appropriate

Your checkpoint

A side-by-side comparison table of F1869 and F2170 covering principle, units, sample prep, duration, limitations, and appropriate use cases, plus two fully worked MVER calculations

Week 5

ASTM F1869 Calcium Chloride Moisture Vapor Emission Testing & ASTM F2420 and F2659 Surface-Based Moisture Measurement Methods

  • Describe ASTM F2420 (in-situ RH beneath an insulated hood) and explain how it differs from F2170

  • Describe ASTM F2659 (non-destructive moisture meter) and state what it actually measures and its limitations

  • Explain why moisture meters are screening tools and how to verify meter readings against a primary method

  • Interpret surface moisture readings in relation to slab condition and flooring adhesive compatibility

  • Identify site conditions (surface temperature, ambient RH, direct sun, airflow) that bias surface-based readings

Your checkpoint

A screening-to-confirmation decision flowchart showing when to use F2659/F2420 first, when to escalate to F2170 or F1869, and what documentation each step requires

Week 6

Test Method Selection, Scheduling, and Site Conditions & Documentation, Reporting, and Interpretation of Results

  • Sequence moisture testing correctly relative to slab curing, HVAC start-up, and flooring installation schedule

  • Select the appropriate test method for a given project scenario and defend the choice in writing

  • Draft a report section that records test method, equipment, calibration, locations, conditions, and results with units and tolerances

  • Interpret results that straddle a threshold and explain how to communicate uncertainty to a client

  • Identify documentation gaps that would weaken a report if challenged

Your checkpoint

A full mock test report for one project scenario including method selection rationale, sampling plan, raw data table, interpretation, and a stated recommendation

Week 7

Flooring and Coating System Requirements and Moisture Limits & Safety, Ethics, and Professional Practice

  • List moisture limits and test requirements commonly specified by flooring and coating manufacturers for different product classes (adhesives, epoxy, resilient, wood)

  • Match a given product specification to the correct test method and threshold and identify mismatches

  • Explain ethical obligations when results conflict with a client's desired outcome or installation schedule

  • Describe safety practices for drilling, dust control, chemical handling, and working on active construction sites

  • Identify professional practice issues such as scope of work, competence limits, and referral to a licensed engineer

Your checkpoint

A product-to-method matching matrix covering at least five flooring or coating product classes, plus a short written response to an ethical pressure scenario

Week 8

Moisture in Concrete: Sources, Transport, and Effects & ASTM F2170 In-Situ Relative Humidity Testing & ASTM F1869 Calcium Chloride Moisture Vapor Emission Testing & ASTM F2420 and F2659 Surface-Based Moisture Measurement Methods & Test Method Selection, Scheduling, and Site Conditions & Documentation, Reporting, and Interpretation of Results & Flooring and Coating System Requirements and Moisture Limits & Safety, Ethics, and Professional Practice

  • Recite from memory the key parameters of F2170, F1869, F2420, and F2659 (depths, durations, units, sample counts)

  • Complete timed practice questions across all eight domains and score at least 80 percent

  • Review every missed question and write a corrected explanation for each

  • Re-derive the MVER calculation and the F2170 depth selection rule without notes

Your checkpoint

A timed 60-question practice exam with a scored answer sheet and a one-page correction log listing every missed item with the correct reasoning

Milestones

Week 2: Can explain without notes why in-situ RH is measured at a specific depth and how that depth is chosen for on-grade versus elevated slabs

Week 4: Can compute MVER from raw mass, area, and time data and correctly state the units, and can articulate the main limitation of the calcium chloride method

Week 6: Can produce a defensible test report from raw data, including method selection rationale and interpretation of a result near a threshold

Week 8: Scores at least 80 percent on a timed 60-question mixed-domain practice exam and has a written correction for every missed item