ID HVAC study materials
ID HVAC study resources

ID HVAC study plan

ID HVAC · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Heating, Ventilation and Air Conditioning (HVAC)

  • Define the three legs of a heating, ventilation and air conditioning system and explain how each leg moves or removes heat

  • Convert between sensible heat, latent heat, Btu/h, tons of refrigeration, and kW without reference notes

  • Interpret a psychrometric chart to locate dry-bulb, wet-bulb, dew point, relative humidity, and enthalpy for three sample air states

  • Explain how sensible heat ratio determines supply air volume and apparatus dew point for a cooling coil

  • List the four refrigerant-side state points of a vapor-compression cycle and label them on a hand-drawn diagram

Your checkpoint

A one-page annotated psychrometric chart plus a labeled vapor-compression diagram, both explained in 200 words of your own notes

Week 2

Heating, Ventilation and Air Conditioning (HVAC)

  • Size a heating load by summing transmission losses through walls, roof, windows, and doors using U-values and design temperature difference

  • Calculate infiltration and ventilation loads using air-change rates and the sensible/latent split

  • Compute duct heat loss and gain for a specified run using insulation R-value and surface area

  • Select a furnace or boiler capacity from a calculated load and justify the safety margin chosen

  • Explain the difference between block load and room-by-room load and when each is required

Your checkpoint

A completed load calculation worksheet for a two-story house with heating and cooling block loads and per-room heating loads

Week 3

Heating, Ventilation and Air Conditioning (HVAC)

  • Trace the refrigeration cycle on a pressure-enthalpy diagram and identify superheat, subcooling, and the metering device state

  • Calculate superheat and subcooling from gauge and thermometer readings for three worked examples

  • Diagnose a restricted metering device, an overcharge, and an undercharge from a symptom table you build yourself

  • Describe compressor types (reciprocating, scroll, screw, centrifugal) and match each to an application range

  • Explain the function of accumulators, receivers, filter-driers, and oil separators in the circuit

Your checkpoint

A troubleshooting matrix of at least eight refrigerant-side faults with the pressure, temperature, and superheat/subcooling signature of each

Week 4

Heating, Ventilation and Air Conditioning (HVAC)

  • Use the equal-friction and velocity-reduction methods to size a trunk-and-branch duct system for a given airflow

  • Convert between round, rectangular, and oval equivalent duct sizes

  • Select fittings and apply fitting loss coefficients to compute total static pressure for a sample system

  • Determine fan airflow from a manufacturer curve given external static pressure

  • Explain the purpose of balancing dampers, turning vanes, and manual volume dampers in a layout

Your checkpoint

A duct layout sketch with a full static pressure budget that sums to the selected fan's rated external static pressure

Week 5

Heating, Ventilation and Air Conditioning (HVAC)

  • Compute the hydronic flow rate and head for a boiler loop using the temperature drop and heat output

  • Identify the components of a hot-water heating loop and the function of each: circulator, expansion tank, air separator, zone valve, and aquastat

  • Compare series loop, one-pipe, two-pipe direct return, and two-pipe reverse return piping and state the balancing implication of each

  • Explain combustion safety checks: draft, flue gas analysis, carbon monoxide limits, and combustion air requirements

  • Describe steam heating basics including traps, mains, and why steam systems differ from hot-water systems

Your checkpoint

A piping schematic for a two-zone hot-water system with flow rate, head, and pump selection documented for each zone

Week 6

Heating, Ventilation and Air Conditioning (HVAC)

  • Explain the refrigeration cycle control sequence for a packaged rooftop unit from call for cooling through economizer operation

  • Describe the operating sequence of a gas furnace from thermostat call through ignition, flame proving, and blower delay

  • Interpret control diagrams and ladder logic for a fan start-stop circuit with safeties

  • Compare constant volume, VAV, and variable refrigerant flow systems on part-load behavior and control needs

  • Explain the role of economizers, energy recovery ventilators, and demand-controlled ventilation in a sequence

Your checkpoint

A written sequence of operation for one packaged rooftop unit and one gas furnace, each at least 150 words and cross-checked against a control diagram

Week 7

Heating, Ventilation and Air Conditioning (HVAC)

  • Calculate indoor air quality ventilation rates for a sample occupancy using ASHRAE 62.1-style rates and the multiple-zone procedure

  • Explain filter ratings (MERV, HEPA) and select a filter for a stated particulate target

  • Compute the sensible and latent capacity of a cooling coil from entering and leaving air conditions

  • Diagnose common air-side faults: low airflow, refrigerant undercharge, dirty coil, and duct leakage, using a symptom-to-cause table

  • Explain the effect of altitude and air density on airflow and capacity calculations

Your checkpoint

A capacity calculation for one cooling coil from measured entering and leaving conditions, plus a five-fault air-side diagnostic table

Week 8

Heating, Ventilation and Air Conditioning (HVAC)

  • Re-derive the ten formulas you used most often from memory and check each against your notes

  • Work through timed practice problems covering load, duct, refrigerant, and hydronic calculations

  • Review your own troubleshooting matrices and explain each entry aloud without notes

  • List the code and standard references that govern ventilation, refrigerant handling, and combustion safety

  • Write a personal error log of every concept that still feels uncertain and schedule a targeted review of each

Your checkpoint

A timed 40-question self-test scored against your notes, with a written error log and a final formula sheet

Milestones

Week 2: Complete the full load calculation worksheet unaided and explain each line to a study partner

Week 4: Duct static pressure budget closes within 10 percent of the selected fan's rated external static pressure

Week 6: Write both sequences of operation from memory, then verify against the control diagrams and note every miss

Week 8: Score at least 80 percent on the timed self-test and show that every error in the log has a written correction