ID POST flashcards
ID POST · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Net assignable area
- The usable floor area of spaces that directly serve occupants, excluding walls, columns, circulation, and mechanical space. It is the basis for space programming before grossing up for circulation.
- Adjacency matrix
- A grid that rates how closely each pair of programmed rooms should be located. It converts client priorities into a zoning diagram before walls and dimensions are drawn.
- Kitchen work triangle
- The path connecting sink, range, and refrigerator. Each leg should fall between 4 and 9 ft and the sum should not exceed 26 ft for efficient, safe movement.
- Universal turning circle
- A 60 in (1525 mm) diameter clear floor area that allows a wheelchair to turn. Kitchens and baths in accessible designs must provide it or an equivalent T-shaped approach.
- Type X gypsum board
- A 5/8 in gypsum panel with a glass-fiber-reinforced core that improves fire resistance. It is specified for rated wall and ceiling assemblies, not general partition use.
- Resilient channel
- A metal furring channel that decouples gypsum board from framing, interrupting sound and heat paths. Used in party walls and ceilings to raise sound transmission class ratings.
- Fireblocking
- Concealed wood-frame spaces must be blocked at floor and ceiling levels, at soffits, and where chases pass between stories to stop hidden fire spread through the cavity.
- Rough opening
- The framed opening in a wall that receives a door or window frame. For a typical interior door it equals the door width plus 2 in and height plus 2 1/2 in.
- Emergency escape opening
- An operable window or door in each sleeping room sized for rescue, commonly a minimum net clear opening of 5.7 sq ft with code-limited sill height.
- Smoke alarm locations
- Alarms are required inside each sleeping room, outside each sleeping area, and on every story. Interconnection ensures all sound when one detects smoke.
- GFCI protection
- Ground-fault circuit interrupter protection is required at kitchen counter receptacles, within 6 ft of sinks, in garages, outdoors, and in unfinished basements to prevent shock.
- Guard height
- Open sides of stairs, balconies, and raised floors need a guard at least 36 in high in dwelling units, with openings that will not pass a 4 in sphere.
- MasterFormat Division 09
- The specification division covering finishes such as gypsum board, tile, flooring, and paint. Each section states submittals, products, execution, and warranty requirements.
- Wyzenbeek abrasion test
- A US test measuring double rubs before fabric shows wear. Contract upholstery often requires 30,000 or more double rubs, but results are not interchangeable with Martindale cycles.
- Porcelain tile absorption
- Porcelain tile has water absorption below 0.5%, making it denser and more frost- and stain-resistant than standard ceramic. Wet floors also need a slip-resistant coefficient of 0.60 or higher.
- Paint sheen selection
- Flat for ceilings and low-traffic walls, eggshell or satin for general walls, and semi-gloss for trim, kitchens, and baths where cleanability matters more than hiding surface flaws.
- CRI color rendering
- Color rendering index rates how faithfully a light source shows colors. Specify CRI 90 or higher for residential interiors where finishes and skin tones must look accurate.
- Correlated color temperature
- A measure in kelvin of a light source's warmth. Roughly 2700–3000 K suits living spaces, while 3500–4000 K suits task and utility areas.
- Reverberation time
- The time for sound to decay 60 dB after it stops. In small residential rooms, keeping it under about 0.6 s preserves speech clarity and reduces harshness.
- Noise criteria
- A single-number rating of background noise from mechanical systems. Continuous HVAC noise above about NC 30–35 in living spaces becomes noticeable and should be controlled by equipment and duct design.
- Operative temperature
- The combined effect of air temperature, radiant temperature, humidity, and air speed on comfort. ASHRAE 55 defines acceptable ranges, roughly 68–75 F in winter and 73–79 F in summer.
- Kitchen aisle clearance
- Clear space between counters: 42 in for a one-cook kitchen and 48 in for multiple cooks, with 36 in as the minimum in a single-cook galley layout.
- Toilet side clearance
- A toilet needs at least 15 in from its centerline to a side wall and about 21 in of clear space in front of the bowl for comfortable, code-compliant use.
- Bath exhaust ventilation
- Bath fans must discharge outdoors, not into an attic, and are typically sized near 1 cfm per sq ft of floor area. Makeup air and short, smooth duct runs preserve performance.
- Counter and cabinet heights
- Standard counter height is 36 in, base cabinets are 24 in deep, and wall cabinets are 12 in deep and mounted 18 in above the counter.
- Percentage fee
- A design fee calculated as a percentage of construction cost. The agreement must state which cost, what scope, and what reimbursables the percentage covers.
- Change order
- A written modification to the contract documents that states the cost and time impact of a change. Work should not proceed on a verbal change without documentation.
- Retainage
- A percentage, commonly 5–10%, withheld from payments until substantial completion. It protects the owner against incomplete or defective work at closeout.
- Substantial completion
- The stage when the work is sufficiently complete for its intended use, triggering punch list, warranty start, and release of retainage under the contract terms.
- Standard of care
- The professional skill and diligence ordinarily exercised by comparable practitioners under similar circumstances. It is the benchmark for negligence and should be stated in the agreement.
- Conflict of interest disclosure
- Any financial interest in a specified product, supplier, or contractor must be disclosed to the client and consented to in writing before the client commits.
- Scope of services
- The written list of what the designer will and will not deliver, including revisions, site visits, and reimbursables. Verbal promises outside it create liability.