ID POST study plan
ID POST · Give each week a clear focus.
8 weeks · About 7 hours per week
Residential Interior Design Programming and Space Planning
Draft a one-page checklist of the information a residential programming interview must capture (client goals, household composition, accessibility needs, storage, budget range, timeline)
Practice converting three written client briefs into prioritized adjacency and zoning diagrams, labeling public, private, and service zones
Compute net-to-gross area and circulation percentages for two sample floor plans and record where efficiency falls below typical residential targets
Build a personal reference sheet of anthropometric clearances (bedside, closet, dining pull-out, wheelchair turning) with the source of each figure
Your checkpoint
A 3-page programming toolkit containing the interview checklist, three labeled zoning diagrams, and the clearance reference sheet
Residential Interior Design Programming and Space Planning & Kitchen and Bath Design
Redraw two kitchens in the work-triangle and zone-workflow models and identify which layout each plan actually follows
Lay out three bathrooms (hall bath, primary suite, powder room) to NKBA-style clearance rules, annotating every dimension
Compare five kitchen storage systems (base pull-outs, pantry cabinets, corner solutions) and note capacity and accessibility trade-offs
Solve four space-planning scenarios that force trade-offs between open-plan living and acoustic privacy
Your checkpoint
Two annotated kitchen plans and three annotated bathroom plans with a written justification of each layout decision
Building Systems, Construction, and Interior Detailing
Diagram wall, floor, and ceiling assemblies for a wood-frame, a steel-frame, and a concrete residence, labeling each layer and its function
Trace plumbing supply and drain routes through a sample plan and flag conflicts with structural members
Explain how HVAC distribution (forced air, hydronic, ductless mini-split) constrains ceiling height and soffit design in three sketches
List the residential electrical circuits a designer must coordinate (dedicated kitchen, GFCI, AFCI, lighting) and where each typically lands
Your checkpoint
A set of four construction detail sketches (wall section, floor-ceiling assembly, plumbing wall, HVAC soffit) each with a short written rationale
Building Systems, Construction, and Interior Detailing & Codes, Regulations, and Life Safety for Residential Interiors
Draw interior elevations and a reflected ceiling plan for one room, coordinating lighting, outlets, and millwork
Write a fire-blocking and draft-stopping checklist for penetrations in a two-story wood-frame house
Identify the egress path, stair geometry, and guardrail requirements for a sample two-story plan using adopted code language
Summarize which code edition governs in a chosen jurisdiction and how local amendments can differ from the model code
Your checkpoint
A coordinated room package (plan, interior elevations, reflected ceiling plan) plus a one-page egress and stair compliance memo
Codes, Regulations, and Life Safety for Residential Interiors
Map the life-safety requirements for a single-family residence: smoke and CO alarm placement, egress window sizes, stair rise-run, handrail and guard heights
Compare accessibility provisions for kitchens and baths under a visitability approach versus full accessibility standards, noting where they diverge
Draft a permit-submission checklist for a residential interior renovation in a chosen jurisdiction
Explain how occupancy classification and scope of work affect which code chapters apply to an interior alteration
Your checkpoint
A one-page residential code compliance matrix covering egress, stairs, alarms, guards, and accessibility, with code section citations
Materials, Finishes, Furnishings, and Specification & Lighting, Acoustics, and Environmental Comfort
Build a materials comparison table for flooring, countertops, and wall finishes scoring durability, maintenance, cost, and sustainability
Write three specification sections in a consistent format (substrate, product, installation, warranty) for a floor, a wall finish, and a countertop
Calculate the lighting layers for one living room and one kitchen: ambient, task, accent, and decorative, with lumen and color-temperature targets
Explain sound transmission class and impact insulation class in residential assemblies and propose three details that reduce noise between floors
Your checkpoint
A finish schedule with specifications for one full project plus a lighting and acoustic strategy sheet for two rooms
Business Practices, Project Management, and Contract Administration
Draft a client agreement outline covering scope, deliverables, fee structure, revision limits, and termination
Build a project schedule for a 10-week residential renovation with milestones, dependencies, and client decision points
Write a change-order template and two sample change orders with cost and schedule impact
Create a punch-list and project closeout checklist including as-builts, warranties, and final walkthrough
Your checkpoint
A project administration packet: agreement outline, 10-week schedule, change-order template, and closeout checklist
Professional Ethics, Communication, and Client Relations & Business Practices, Project Management, and Contract Administration
Write responses to three ethical dilemmas (contractor kickback offer, client requesting an unsafe alteration, undisclosed conflict of interest) citing professional conduct principles
Draft a client communication plan covering kickoff, weekly updates, decision deadlines, and conflict escalation
Practice a 10-minute client presentation of a design concept and record it for self-review
Complete a timed 60-question mixed-domain practice set and log every missed topic by domain
Your checkpoint
An ethics and communication portfolio (three written dilemma responses, communication plan, presentation outline) plus a scored practice-set log with a remediation list
Milestones
Week 2: Can produce a code-agnostic kitchen and bath layout with all clearances annotated from memory in under 45 minutes
Week 4: Can explain, without notes, how structure, plumbing, and HVAC each constrain interior detailing in a wood-frame house
Week 6: Can write a complete specification section and justify lighting and acoustic choices for a room using measured targets
Week 8: Scores at least 80 percent on the timed mixed-domain practice set and has a written remediation list for every missed domain