- Adjacency matrix
- Related: Bubble diagram, Zoning, Circulation path
A grid that rates how closely each pair of rooms or zones should sit next to one another, turning a client's wish list into a numeric basis for blocking out a floor plan.
- Bubble diagram
- Related: Adjacency matrix, Zoning
A loose planning sketch of circles sized by area and linked by lines showing required relationships, used before walls and dimensions are fixed so that priorities can be tested cheaply.
- Zoning
- Related: Adjacency matrix, Circulation path
Grouping rooms by activity, noise level, or privacy so that public, service, and private areas occupy distinct bands of the plan and conflicting uses do not share a wall.
- Circulation path
- Related: Clear width, Zoning
The route people walk between entries, rooms, and stairs. Its width, directness, and freedom from furniture pinch points determine whether a layout feels generous or cramped.
- Clear width
- Related: Circulation path, Turning radius, Egress path
The unobstructed dimension between finished surfaces, fixtures, or furnishings along a route or within a work zone, measured at the narrowest point rather than at framing.
- Turning radius
- Related: Clear width, Accessible route
The circular space a wheelchair or scooter needs to reverse direction, commonly a 60-inch diameter for a full turn and a T-shaped or smaller area for limited turns.
- Accessible route
- Related: Clear width, Turning radius, Type A unit
A continuous, firm, slip-resistant path connecting accessible parking, entries, and usable rooms without steps, with compliant slopes, widths, and maneuvering space at doors.
- Type A unit
- Related: Accessible route, Blocking, Grab bar
A dwelling unit built to enhanced visitability criteria, with features such as wider doors, reinforced bath walls, and reachable controls that make later adaptation easier without full redesign.
- Egress path
- Related: Clear width, Landing, Smoke detector
The continuous route from any occupied point to a public way, including door swing, corridor width, travel distance, and protection of the path from fire or smoke.
- Landing
- Related: Riser and tread, Egress path
A level platform at the top or bottom of a stair or between flights, sized to allow a person to pause and a door to swing clear of the stair treads.
- Riser and tread
- Related: Landing, Headroom
The vertical rise and horizontal run of a single stair step. Consistent geometry within a flight prevents tripping, and the sum of rise plus run guides comfortable proportions.
- Headroom
- Related: Riser and tread, Soffit
The vertical clearance above a floor, stair, or landing measured to the nearest obstruction, checked at stairs, sloped ceilings, and under beams or ductwork.
- Soffit
- Related: Headroom, Chase
The finished underside of a projecting element such as a beam, stair, cabinet run, or dropped ceiling, often used to conceal ductwork, plumbing, or structural framing.
- Chase
- Related: Soffit, Wet wall
A vertical shaft enclosed by walls that carries plumbing, ductwork, or wiring between floors, sized and located early because it constrains both plan layout and structural framing.
- Wet wall
- Related: Chase, Fixture rough-in
A wall grouping plumbing fixtures back to back so supply and drain lines share one run, reducing pipe length, cost, and the number of penetrations through framing.
- Fixture rough-in
- Related: Wet wall, Grab bar
The dimensions locating supply and drain connections relative to the finished wall, needed to order sinks, toilets, and tubs and to verify they will fit the framed opening.
- Load-bearing wall
- Related: Header, Chase
A wall that carries weight from floors or roof above to the foundation. Removing or altering it requires engineered transfer of loads, not just a cosmetic patch.
- Header
- Related: Load-bearing wall, Soffit
A horizontal structural member spanning an opening in a wall to carry loads above it, sized by span and load and often concealed within the wall or ceiling assembly.
- Blocking
- Related: Grab bar, Type A unit
Solid framing installed between studs or joists to provide secure anchorage for cabinets, grab bars, railings, or heavy fixtures where the finish alone cannot hold a fastener.
- Grab bar
- Related: Blocking, Type A unit, Fixture rough-in
A securely anchored bar at a bathtub, shower, or toilet that a person grips for balance, installed at specified heights and locations and backed by framing or approved anchors.
- Smoke detector
- Related: Egress path, Carbon monoxide alarm
A device sensing smoke and sounding an alarm, required in specified locations such as sleeping areas and each story, with interconnection so one alarm activates all.
- Carbon monoxide alarm
- Related: Smoke detector, Combustion air
A device that sounds when carbon monoxide from fuel-burning appliances or attached garages reaches dangerous levels, required near sleeping rooms in many jurisdictions.
- Combustion air
- Related: Carbon monoxide alarm, Makeup air
The air supply a fuel-burning appliance needs to burn safely. Confining it in a tight room or sealing a house can cause backdrafting of flue gases into the living space.
- Makeup air
- Related: Combustion air, Ducted range hood
Air introduced to replace air exhausted by a range hood, dryer, or bath fan, preventing negative pressure that can pull combustion gases backward or make doors hard to open.
- Ducted range hood
- Related: Makeup air, Work triangle
A hood that captures cooking moisture, grease, and odors and discharges them outdoors through smooth ductwork, preferred over recirculating types for gas cooking and heavy use.
- Work triangle
- Related: Ducted range hood, Counter clearance
The path linking sink, refrigerator, and cooking surface. Shorter, unobstructed legs reduce steps, though the concept is adapted for larger kitchens with multiple cooks.
- Counter clearance
- Related: Work triangle, Clear width
The open floor area in front of base cabinets and appliances that lets doors and drawers open and a person work or pass, measured from the cabinet face to the nearest obstruction.
- Color rendering index
- Related: Correlated color temperature, Layered lighting
A scale from 0 to 100 describing how faithfully a light source shows object colors compared with a reference, important where finishes and skin tones must read naturally.
- Correlated color temperature
- Related: Color rendering index, Layered lighting
The warmth or coolness of a light source expressed in kelvin, from about 2700 K for cozy residential ambience to 4000 K or higher for task areas and daylight matching.
- Layered lighting
- Related: Correlated color temperature, Color rendering index
Combining ambient, task, and accent light so each space has general illumination plus focused light for work and highlights, ideally on separate dimmable controls.
- Sound transmission class
- Related: Flanking path, Impact insulation class
A single-number rating of how well a wall or floor assembly blocks airborne sound, where higher values mean more privacy between rooms, especially bedrooms and baths.
- Impact insulation class
- Related: Sound transmission class, Flanking path
A rating of how well a floor-ceiling assembly resists structure-borne noise such as footsteps, important where hard flooring sits above a quiet room.
- Flanking path
- Related: Sound transmission class, Impact insulation class
A sound leak that bypasses the rated assembly, such as through shared ductwork, door undercuts, or back-to-back outlets, which can defeat a high-rated wall.
- Volatile organic compounds
- Related: Formaldehyde-free substrate, Makeup air
Chemicals that evaporate from paints, adhesives, sealants, and composite wood and can affect indoor air quality, driving specification of low-emitting products and adequate ventilation.
- Formaldehyde-free substrate
- Related: Volatile organic compounds, Specification section
Composite wood or panel product made with binders that do not emit formaldehyde, specified for cabinetry, shelving, and millwork to reduce indoor air contaminants.
- Specification section
- Related: Submittal, Addendum
A written document organized by work type that fixes product standards, installation methods, submittals, and quality requirements binding on the contractor, referenced by the drawings.
- Submittal
- Related: Specification section, Punch list
Product data, shop drawings, or samples the contractor provides for the designer's review before installation, confirming that proposed items meet the specified requirements.
- Addendum
- Related: Change order, Specification section
A written modification issued before bids are due that changes drawings or specifications and becomes part of the contract documents for all bidders.
- Change order
- Related: Addendum, Punch list
A signed amendment after contract execution adjusting scope, price, or time, typically required whenever the client or site conditions alter the agreed work.
- Punch list
- Related: Submittal, Change order
A closing record of incomplete or defective items found at substantial completion, which the contractor must correct before final payment and release of retainage.
- Scope of work
- Related: Change order, Letter of agreement
A plain statement of what the designer will and will not deliver, including drawings, selections, site visits, and exclusions, used to prevent misunderstandings and unpaid extras.
- Letter of agreement
- Related: Scope of work, Retainer
A short contract form stating parties, services, fees, schedule, and key terms, appropriate for smaller residential projects where a full agreement is disproportionate.
- Retainer
- Related: Letter of agreement, Scope of work
An advance payment held to secure availability or applied against future billings, distinguishing it from a deposit and clarifying refundability in the written agreement.
- Conflict of interest
- Related: Scope of work, Letter of agreement
A situation where a designer's financial or personal interest could bias advice, such as undisclosed compensation from a vendor, which must be disclosed or avoided.
- Informed consent
- Related: Conflict of interest, Change order
The client's agreement to a course of action after being told the relevant risks, costs, and alternatives in language they understand, documented in writing.