Work at Height Regulations
UK regulations requiring avoidance of work at height where possible, prevention of falls with collective measures, and mitigation of residual risk; a written risk assessment and rescue plan are required.
Hot works permit
A formal authorisation for torch work that specifies fire precautions, a fire watch during and for at least 60 minutes after work, and suitable extinguishers on the roof.
LPG cylinder storage
Cylinders must be stored upright, secured, away from ignition sources and never inside a building or below ground where gas can accumulate.
Welfare facilities
Drinking water, washing facilities, sanitary conveniences and a means of drying wet clothing must be provided on site for roof felting workers.
Fall-arrest anchor point
A suitably rated anchorage to which a harness and lanyard are attached; it is a last line of defence, not a substitute for edge protection.
Manual handling of rolls
Rolls over 20 kg should be lifted by two people or moved on a barrow or hoist; shoulder-carrying up ladders is unsafe.
APP modified bitumen
Plasticised bitumen membrane with good high-temperature and UV resistance, commonly used for torch-on cap sheets in warm climates.
SBS modified bitumen
Elastomeric bitumen membrane with good low-temperature flexibility and movement tolerance, suited to cold or movement-prone roofs.
Vapour control layer
A membrane placed below insulation in a warm roof to limit interstitial condensation; typically bitumen or polyethylene, lapped and sealed.
Mineral-surfaced cap sheet
A top-layer membrane with mineral granules providing UV resistance and slip resistance, used as the weathering surface of a felt roof.
Lap widths
Typical torch-on lap dimensions are 80–100 mm for side laps and 100–150 mm for end laps, unless the manufacturer specifies otherwise.
Drip trim
A metal edge trim fixed at the roof perimeter before the membrane is dressed over it, forming the finished drip edge.
Substrate moisture check
Testing the deck for moisture before felting; trapped moisture causes blistering and premature failure of the waterproofing.
Timber deck condition
Boards should be close-butted, fixed to joists, free from deflection and gaps within the specification before membrane is laid.
Concrete deck preparation
The deck must be dry, sound and free of laitance; a primer or bonding agent is applied before the first membrane layer.
Finished fall
The slope of the finished roof surface, typically 1:40 to 1:80 for flat roofs, checked before setting out to avoid ponding.
Overlay system
Laying new membrane over an existing roof using a carrier board or bonded system, only where the substrate is sound and specified.
Torch-on bonding
Heating the membrane underside and substrate until the bitumen is molten, then rolling to expel air and achieve a continuous 10–20 mm bleed at laps.
Lap direction
Side laps should face the direction of water flow so water runs over the lap rather than into it; end laps on successive layers are staggered.
Mechanical fixing of base sheet
Base sheet fixed with washers and screws at the specified density, with the cap sheet torch-bonded over the fixings.
Over-torching defect
Scorched or burnt-through membrane with exposed reinforcement; it must be cut out and replaced because it compromises waterproofing.
Upstand height
Membrane turned up a minimum of 150 mm above the finished roof surface, with a termination bar or chased-in edge at the top.
Outlet collar
A preformed collar installed before the main membrane so the membrane can be dressed into the outlet flange and sealed.
Penetration detail
Pipes and flues require a collar or sleeve with a minimum 150 mm upstand and a weathertight seal at the top.
Termination bar
A metal bar fixed at the top of an upstand or wall abutment, with a sealant bead, to prevent water tracking behind the membrane.
Gas torch safety
Check hoses and regulators, use a flashback arrestor, and never leave a lit torch unattended; keep leads clear of the flame.
Edge protection dimensions
Typical guardrails are set at 950 mm and 470 mm heights with toe boards, providing collective fall prevention at roof edges.
Ladder angle and extension
Ladders should be set at roughly a 1-in-4 angle and extend about 1 m above the landing point, secured against movement.
Fragile roof surface
Roof lights and asbestos cement sheets require a risk assessment and crawling boards or staging before anyone stands on them.
Lap integrity test
Probe or peel tests on sample laps confirm bonding; open laps are re-heated, pressed and re-rolled to achieve a sealed joint.
Blister repair
Cut out the blister to sound membrane, clean and prime, then apply a patch extending at least 100 mm beyond the defect, fully bonded.
Ponding defect
Standing water deeper than about 5 mm after 24 hours of drying indicates inadequate fall or a low point and must be investigated.
Handover inspection record
Photographs, location references, dates and test results compiled with guarantees and maintenance instructions for the completed roof.