CSCS Roof Felting study materials
CSCS Roof Felting study resources

CSCS Roof Felting study plan

CSCS Roof Felting · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Health, Safety and Welfare in Roof Felting Work

  • List the main legal duties of employers and employees under health and safety at work legislation and explain how each applies to a felting crew

  • Identify the hazards of hot-works bitumen boilers and gas torches and describe the controls used to prevent fire and burns

  • Select the correct personal protective equipment for a given felting task and justify each item chosen

  • Explain safe manual handling limits and describe two lifting aids or techniques for moving felt rolls and bitumen containers

Your checkpoint

A one-page hazard-and-controls table covering five felting tasks, each with at least two controls and the PPE required

Week 2

Health, Safety and Welfare in Roof Felting Work & Installation of Felting Systems and Waterproofing Layers

  • Describe how to set up exclusion zones and signage below a roof felting operation and state who must be informed

  • Outline the fire-watch procedure before, during and after torch-applied work, including the post-work monitoring period

  • Sequence the steps of installing a torch-on felt layer from substrate check to final seam

  • Explain how ambient temperature and weather conditions affect felt application and state when work should stop

Your checkpoint

A written step-by-step method statement for a torch-on felt installation including fire precautions, reviewed against a self-made checklist

Week 3

Installation of Felting Systems and Waterproofing Layers & Roof Felting Materials, Components and Specifications

  • Compare the properties and typical uses of at least four common felting materials such as reinforced bitumen membranes, underlays and capsheets

  • Match a membrane type and weight to a given roof specification and justify the choice

  • Describe correct roll handling, storage and conditioning before installation

  • Explain the function of each layer in a multi-layer built-up felt system

Your checkpoint

A materials comparison table with at least four membrane types, their properties, typical use and one reason each might be rejected for a given job

Week 4

Preparation, Substrate and Surface Assessment & Installation of Felting Systems and Waterproofing Layers

  • Assess a described substrate for moisture, flatness, soundness and cleanliness and record pass or fail against stated criteria

  • Describe the preparation steps for concrete, timber and metal deck substrates before felting

  • Explain how to apply and check a vapour control layer and identify common installation errors

  • Describe how to lay and bond the first felt layer to achieve correct laps and alignment

Your checkpoint

A completed substrate assessment form for a described roof scenario, with a pass or fail decision and the remedial actions listed

Week 5

Detail Work: Edges, Upstands, Outlets and Penetrations

  • Describe how to form a felt detail at a wall upstand including the correct height and termination method

  • Explain how to detail a rainwater outlet and a pipe penetration so water is shed correctly

  • Describe how to form and reinforce an internal and external corner in felt

  • Identify the order in which edge, upstand and outlet details should be completed relative to the main field membrane

Your checkpoint

A set of four hand-drawn detail sketches with a written note on the correct sequence and one common failure for each

Week 6

Tools, Equipment and Safe Working at Height & Health, Safety and Welfare in Roof Felting Work

  • Select the correct hand tool and power tool for a given felting task and state the pre-use check required for each

  • Describe the inspection and safe use of access equipment such as ladders, towers and edge protection

  • Explain how to plan work at height to minimise time spent near unprotected edges

  • Describe the emergency procedure if a fall or a fire occurs during felting work

Your checkpoint

A tool and equipment pre-use checklist covering at least eight items, with the check and the reject criteria for each

Week 7

Inspection, Testing, Defects and Repair & Roof Felting Materials, Components and Specifications

  • Describe how to carry out a visual inspection of a completed felt roof and list what to look for at laps, details and terminations

  • Explain at least two methods of checking for water ingress or trapped moisture and state their limitations

  • Diagnose common defects such as blistering, wrinkling, open laps and ponding, and state the likely cause of each

  • Describe the correct repair procedure for a blister and for a failed lap

Your checkpoint

A defect diagnosis sheet listing six defects, each with likely cause, inspection method and repair approach

Week 8

Health, Safety and Welfare in Roof Felting Work & Installation of Felting Systems and Waterproofing Layers & Detail Work: Edges, Upstands, Outlets and Penetrations & Inspection, Testing, Defects and Repair

  • Integrate safety, installation, detail and inspection knowledge by working through full scenario-based practice questions

  • Explain your reasoning aloud for each answer and identify the domain it came from

  • Revisit the two weakest domains from earlier weeks and re-test them

  • Summarise the key facts for each domain onto a single revision sheet

Your checkpoint

A timed 40-question mock test with a scored breakdown by domain and a written list of the three areas to revisit

Milestones

Week 2: Can state the fire-watch procedure and the main hot-works controls from memory without notes

Week 4: Can complete a substrate assessment and justify a pass or fail decision in under ten minutes

Week 6: Can name the pre-use check and reject criteria for eight tools or items of access equipment

Week 8: Scores at least 80 percent on the mock test with no domain below 70 percent