- Risk assessment timing
- A risk assessment must be completed before any tower assembly, use, or dismantling, and it must be reviewed if conditions change or new hazards are identified.
- Exclusion zone radius
- The exclusion zone around a tower should have a radius of at least 1.5 times the tower height unless a documented engineering assessment specifies otherwise.
- Wind speed limit for assembly
- Assembly and dismantling of mobile towers must stop when wind speed exceeds the manufacturer's limit, often 20 mph (8.9 m/s) or as specified in the manual.
- Overhead power line distances
- Minimum safe distances from overhead power lines are 3 m for voltages up to 66 kV, 4.5 m for 132 kV, and 6 m for 275/400 kV, or as specified by the electricity supplier.
- Weekly inspection record retention
- Weekly inspection records for mobile towers must be kept for at least 3 months and made available for review by relevant persons.
- Rescue plan requirement
- A rescue plan must be in place before anyone works at height on a tower, including equipment and trained personnel available on site.
- Competent person for assembly
- Only trained and competent personnel may assemble, erect, or dismantle a tower, and a supervisor must be appointed and present during these operations.
- Manufacturer's instructions
- The manufacturer's instructions must be followed exactly during assembly, use, and dismantling; no modifications or substitutions of parts are allowed without written approval.
- Base support requirement
- The tower must be built on a firm, level base with base plates and adjustable legs fully supported; never use bricks or blocks to level the tower.
- Height to base ratio
- During assembly, the tower height must not exceed three times the minimum base width unless stabilisers are fitted as per the manufacturer's instructions.
- Guardrail height
- Guardrails on platforms must be between 0.95 m and 1.15 m high, with an intermediate rail and a toe board at least 150 mm high.
- Dismantling sequence
- Dismantling must follow the reverse of the assembly sequence, and stabilisers or ties must not be removed until the tower is stable.
- Pre-use inspection checks
- Before each use, check for damaged or missing components, corrosion, cracks, bent tubes, insecure fittings, and confirm all braces and pins are in place.
- Inspection after high winds
- The tower must be inspected by a competent person after high winds, accidental impact, or any modification, and must not be used until cleared.
- Defect reporting procedure
- Any defect must be reported immediately to the supervisor; a tower with a safety-affecting defect must be taken out of service and tagged 'Do Not Use'.
- Maintenance parts requirement
- Only original manufacturer's parts may be used for maintenance; lubricate adjustable legs and fittings as per the manufacturer's schedule.
- Inspection record contents
- Inspection records must include date, inspector name, findings, and actions taken, and must be kept for at least 3 months.
- Mobile tower pre-move checks
- Before moving a mobile tower, lower the platform, secure all equipment, check the route, and ensure no personnel remain on the platform.
- Safe working load
- Never exceed the manufacturer's safe working load (SWL) for the platform, typically 200 kg per platform, and always check the data plate.
- Load distribution
- Loads on the platform must be evenly distributed; do not concentrate loads at one end or on one platform level.
- Moving with personnel
- Mobile towers must not be moved while personnel or materials are on the platform; always lower the platform and secure equipment before moving.
- Wheel locking before use
- Wheels must be locked and brakes applied before climbing the tower; never use the tower on sloping ground without additional measures.
- Access method
- Access to the platform must be via internal ladders or stairs; never climb on the outside of the tower or use guardrails as a ladder.
- Fall rescue response
- If a fall occurs, do not move the casualty unless in immediate danger; call emergency services and administer first aid if trained.
- High wind emergency action
- In high winds, stop work, secure the tower, and evacuate the platform; do not attempt to dismantle the tower in high winds.
- Unstable tower action
- If the tower becomes unstable, evacuate immediately, do not attempt to correct it, cordon off the area, and seek expert advice.
- Incident reporting
- All incidents, including near misses, must be reported to the supervisor and recorded; serious incidents must be reported to the relevant authority under RIDDOR.
- Emergency contact display
- Emergency contact numbers must be displayed on site, and all personnel must know the emergency procedures and first aid kit location.
- Health and Safety at Work Act
- The Health and Safety at Work etc. Act 1974 requires employers to ensure safe systems of work and employees to take reasonable care of themselves and others.
- Work at Height Regulations
- The Work at Height Regulations 2005 require risk assessment, avoidance of work at height where possible, fall prevention measures, and rescue planning.
- PUWER requirements
- The Provision and Use of Work Equipment Regulations 1998 require equipment to be suitable, maintained, and inspected, including mobile towers.
- RIDDOR reporting
- The Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 require reporting of certain incidents, including falls from height.