CSCS Mobile Tower · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Site safety and risk assessment for tower operations & Legislation, regulations and personal responsibilities

  • Map each hazard category in tower operations (ground conditions, overhead lines, wind, exclusion zones, public interface) to the control measure that addresses it

  • Write out the hierarchy of risk control and apply it to three tower scenarios

  • Identify the primary legislation and supporting regulations that govern tower erection, inspection and lifting operations in your jurisdiction

  • List the duty holders in a tower operation and state their specific legal responsibilities

Your checkpoint

A one-page hazard-to-control matrix plus a duty-holder responsibility table, self-marked against the course syllabus

Week 2

Site safety and risk assessment for tower operations & Tower assembly, erection and dismantling procedures

  • Explain how a site-specific risk assessment feeds into the selection of an erection position and sequence

  • Describe ground-bearing and foundation requirements for a mobile tower and the checks made before erection begins

  • Sequence the standard erection steps for a mobile tower from delivery to handover

  • Identify the weather and environmental limits that stop or suspend erection work

Your checkpoint

A written step-by-step erection sequence with the pre-erection ground and weather checks embedded, reviewed against a checklist

Week 3

Tower assembly, erection and dismantling procedures

  • Distinguish mobile, static and suspended tower configurations and the assembly implications of each

  • Describe the role of stabilisers, outriggers, ballast and tie-in arrangements in maintaining stability

  • Explain the correct sequence for dismantling a tower and the controls that prevent premature removal of stability elements

  • Identify common assembly errors and state the consequence of each

Your checkpoint

An annotated assembly-and-dismantle procedure covering at least eight steps, with a list of ten common errors and their consequences

Week 4

Tower assembly, erection and dismantling procedures & Tower inspection, maintenance and defect reporting

  • State who may erect, alter, dismantle and inspect a tower and what competence evidence is required

  • Describe the handover process between erection crew and users, including what must be recorded

  • List the pre-use inspection items for a tower and the frequency of statutory and routine inspections

  • Explain how defects are categorised, recorded and escalated, and when a tower must be taken out of service

Your checkpoint

A completed pre-use inspection checklist and a defect-reporting template with escalation triggers, timed as a mock handover

Week 5

Operating procedures and load/operational limits & Tower inspection, maintenance and defect reporting

  • Interpret load ratings, duty classifications and the difference between uniformly distributed and concentrated loads

  • Calculate the effect of adding personnel, tools and materials to a tower's rated capacity

  • Identify structural and component defects visible during inspection and decide whether each is a stop-work condition

  • Describe the maintenance regime for platforms, guardrails, toe boards, castors and access arrangements

Your checkpoint

Five worked load-calculation problems solved with the accept/reject decision stated, plus a defect decision log

Week 6

Operating procedures and load/operational limits & Site safety and risk assessment for tower operations

  • State the operating limits on wind speed, height-to-base ratio, platform loading and movement of towers with persons or materials aboard

  • Explain the controls for moving, repositioning and towing a mobile tower

  • Apply exclusion-zone and public-protection principles to a tower sited near an active work area

  • Describe the precautions required when working near overhead power lines or on sloping or soft ground

Your checkpoint

A site-specific operating-limits card for a chosen scenario covering wind, loading, movement and exclusion zones

Week 7

Emergency procedures and incident response

  • Describe the emergency actions for a partial collapse, a fall from height, an unstable tower and an electrical contact incident

  • Explain the rescue and evacuation options for a person stranded on a tower platform

  • Outline the incident-reporting chain and the information that must be captured at the scene

  • Identify the first-aid and rescue equipment that should be available before tower work starts

Your checkpoint

A written emergency response plan for one tower scenario, including rescue method, reporting chain and equipment list

Week 8

Site safety and risk assessment for tower operations & Tower assembly, erection and dismantling procedures & Tower inspection, maintenance and defect reporting & Operating procedures and load/operational limits & Emergency procedures and incident response & Legislation, regulations and personal responsibilities

  • Consolidate all six domains into a single revision summary linking hazards, procedures, limits and legal duties

  • Complete timed practice questions across every domain and review each wrong answer to its source rule

  • Rehearse the inspection, load-calculation and emergency-response tasks under time pressure

  • Identify remaining weak areas and produce a final pre-exam action list

Your checkpoint

A full timed mock exam with a scored review sheet and a prioritised list of topics to revisit before test day

Milestones

Week 2: Can describe the pre-erection ground, weather and siting checks from memory and place them in the correct order before assembly starts

Week 4: Can complete a pre-use inspection and handover unaided, correctly identifying at least eight checklist items and the escalation route for defects

Week 6: Can state the wind, loading, height-to-base and movement limits without notes and apply them to a scenario

Week 8: Scores at least 80% on the timed mock exam with no domain below 70%, and has a written list of remaining weak areas