Tower Crane Types, Components, and Configuration

  • Hammerhead (horizontal jib) cranes: jib and counter-jib are fixed horizontal; trolley travels along the jib to change radius.

  • Luffing-jib cranes raise/lower the jib to change radius; used where horizontal jib cannot swing clear of adjacent structures.

  • Self-erecting cranes fold and unfold hydraulically; typically limited height and capacity, erected without a separate mobile crane.

  • Base types: fixed foundation (concrete pad or ballast block), rail-mounted (traveling), and climbing (internal or external to a building core).

  • Slewing assembly sits between the mast top and turntable; it allows 360-degree rotation of jib and counter-jib as one unit.

  • Counter-jib carries counterweights and often the hoist machinery; counterweight mass balances the overturning moment from jib loads.

  • Trolley (distribution) carriage moves along the jib; hoist rope passes from trolley sheave to hook block.

  • Mast sections are bolted or pinned lattice modules; climbing cranes add sections at a climbing frame as the building rises.

Quick reference

Site Preparation, Erection, Climbing, and Dismantling

  • Foundation must be designed for crane reactions: vertical load, overturning moment, and horizontal shear; concrete strength verified before erection.

  • Erection sequence typically: base/foundation check, mast assembly, slewing unit, cab and turntable, counter-jib with counterweights, jib, then reeving.

  • Counterweights are installed before the jib is assembled to keep the crane balanced during erection.

  • Climbing: crane is supported by a climbing frame anchored to the structure; guide rollers and wedges are reset after each climb.

  • Free-standing height limit is defined by the manufacturer; beyond it, the crane must be tied to the structure at specified intervals.

  • Dismantling reverses erection: remove jib, then counterweights, then counter-jib, then mast sections, using a mobile crane or self-lowering system.

  • Exclusion zones and a documented lift plan are required for erection, climbing, and dismantling operations.

  • Wind speed limits for erection/climbing are manufacturer-specified and are typically lower than normal operating limits.

Quick reference

Load Charts, Capacity, and Rigging Considerations

  • Rated capacity = the lesser of the load-chart value at that radius and any reduced capacity from configuration (jib length, counterweight, reeving).

  • Load moment = load x radius; the chart is fundamentally a limit on overturning moment plus structural limits.

  • Working radius is measured horizontally from the slewing centre to the hook/load centre of gravity, not along the jib.

  • Deduct from rated capacity: hook block, slings, spreader beams, and all rigging below the hook.

  • Two-part (or more) reeving increases capacity for heavy lifts but reduces maximum hook height and hoist speed.

  • Sling angle: tension in each leg = load / (number of legs x sin of angle to horizontal); shallow angles greatly increase leg tension.

  • Shock loading from rapid slewing, hoisting, or sudden stops can exceed static chart values and must be avoided.

  • A lift is critical when it exceeds a defined percentage of rated capacity (commonly 75%) or involves multiple cranes or personnel.

Quick reference

Pre-Operational Inspection and Daily Checks

  • Daily checks before first use: wire rope for broken wires, kinks, corrosion, and correct spooling on the drum.

  • Check hook for cracks, deformation, throat opening, and that the safety latch closes and seats correctly.

  • Inspect limit switches (hoist high, hoist low, trolley, slewing) and the moment/overload limiter for correct function.

  • Verify anemometer reads correctly; wind speed indication is a primary safety instrument.

  • Check brakes (hoist, slewing, trolley) for holding ability and adjustment; check for oil or grease on brake surfaces.

  • Inspect structure for loose or missing bolts, cracked welds, corrosion, and deformation of mast or jib members.

  • Check cab controls, emergency stop, and all alarms/indicators; confirm two-way radio communication works.

  • Record results in the inspection log; defects affecting safety must be reported and the crane taken out of service until rectified.

Quick reference

Safe Operating Procedures and Signal Communication

  • Only one designated signaler directs the crane at a time; the operator obeys that person unless a stop signal is given by anyone.

  • Standard hand signals: raised fist = stop; arm extended upward with index finger = hoist; arm extended downward = lower.

  • Emergency stop signal is valid from any person and must be obeyed immediately.

  • Operator must not move a load over personnel; use tag lines to control rotation and swing.

  • Before slewing, confirm the path is clear and warn personnel; allow for load swing and pendulum effect.

  • Never leave controls with a load suspended; lower the load, set the brake, and shut down per procedure.

  • Permit-to-work and lift plans apply to critical or complex lifts; the operator confirms load weight and rigging before hoisting.

  • Loss of communication during a blind lift: operator stops and holds until communication is restored.

Quick reference

Environmental and Site Hazards (Wind, Power Lines, Obstructions)

  • Stop operations when wind speed reaches the manufacturer's limit; in-service and out-of-service limits differ.

  • Out-of-service: slew to the manufacturer's specified free-slew or park position and release the slewing brake as instructed.

  • Wind load on the load and jib increases with the square of wind speed; large flat loads act as sails.

  • Minimum approach distance to overhead power lines must be maintained per local rules; treat lines as live until confirmed de-energized.

  • Use a spotter/banksman when working near power lines; never allow jib, rope, or load within the exclusion distance.

  • Check for obstructions: adjacent buildings, other cranes, and aerial hazards; use anti-collision or zoning systems where fitted.

  • Ground conditions matter: crane base or rail track must be stable; check for settlement, undermining, or excavation nearby.

  • Lightning and electrical storms: cease operations and follow the site's storm procedure.

Quick reference

Maintenance, Lubrication, and Minor Adjustments

  • Follow the manufacturer's maintenance schedule for intervals and lubricant types; record all work in the maintenance log.

  • Wire rope: lubricate per manufacturer; inspect for broken wires and wear; replace when criteria (e.g., broken-wire count) are met.

  • Brake adjustment: maintain correct air gap/clearance; brakes must hold rated load without slipping.

  • Slewing ring and pinion require periodic greasing; check for wear, backlash, and loose bolts.

  • Limit switches and overload limiter must be tested and recalibrated after adjustment or repair.

  • Bolted connections: check torque on mast and jib bolts at specified intervals and after climbing.

  • Hydraulic systems (luffing/self-erecting): check fluid level, leaks, and hose condition; never adjust relief valves without authorization.

  • Minor adjustments only within the operator's competence; structural or safety-critical repairs require qualified personnel.

Quick reference

Legislation, Standards, and Operator Responsibilities

  • Operators must hold the required licence/competency for the crane type and be medically fit.

  • The operator is responsible for the daily pre-use inspection and for refusing unsafe lifts.

  • Lift plans, risk assessments, and method statements are required for erection, climbing, dismantling, and critical lifts.

  • Thorough examination (statutory inspection) is required at defined intervals by a competent person; records must be kept.

  • Manufacturer's manual and load chart are the governing documents for operation and configuration.

  • Report all defects and incidents; do not operate a crane with a known safety defect.

  • Keep the logbook and inspection records up to date; they are legal records.

  • Follow site rules for permits, exclusion zones, and communication; cooperate with the appointed banksman/signaler.